Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

Process Optimization Method Based on Emergency Construction Work Scenario (돌관공사 시나리오 기반 공정관리 최적화 방안)

  • Lee, Si-Hyun;Lee, Seung-hak;Woo, Mi-Sun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.117-118
    • /
    • 2015
  • These days buildings have more possibilities to occur construction delay as many variables and risks are inherent in them due to the enlargement and complexity. When a project is delayed, it generates extra working expenses and this causes a dispute between the employer and the constructor. Most construction sites conduct emergency construction work to recover the delay of the project duration. When an emergency construction is carried out in the actual construction site, it's necessary to utilize and distribute the proper working groups based on the procedure of successor and predecessor. Many constructions, however, have been going only with more number of work forces and working time. This study suggests a process management optimization plan with an application of emergency construction scenario by using linear programing.

  • PDF

The Perception Research on the Career Development of the Non-Certified Qualification Acquisitors of National Construction Management (국내 건설사업관리(CM) 민간자격 인증자들의 경력개발에 대한 인식조사)

  • Yu, Hoe-Chan;Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.

  • PDF

Quantitively deducing basic method of construction schedule risk (공정리스크의 정량적 도출을 위한 기초적 방법)

  • Ryu, Han-Guk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.90-91
    • /
    • 2014
  • Previous research related to the construction schedule management has focused on construction schedule categorization, construction schedule management, and system development to manage construction schedule risks. Therefore this research present quantitively deducing method for managing construction schedule risk. Based on the investigation, this study suggested the probable risk factors and a practical management method, through interviews and discussions with experts. The quantified risks should be adapted for an individually specific projects and managed until the project is complete. To maintain the continuity of schedule risks, the schedule risk management procedures should be controlled during the performance of the construction project.

  • PDF

A Study of Cost Management Utilizing Resource Quantity Data in Nuclear Power Plant Construction Project (원전건설 물량데이터를 활용한 사업비관리 방안)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.185-186
    • /
    • 2017
  • Even large construction projects of nuclear power plant construction and production data is increasing dramatically due to the introduction of ICT technologies, such as 3D scanning technology, wireless communication technology, virtual construction management technology. There are various attributes and types of data to be produced and managed because the documents generated by the contract method are different from the cost processing method. According to the requirements of the international nuclear bid, it is required to present the cost that is calculated based on resource quantity. This research considers ways in which the cost management based on the resource quantity.

  • PDF

Linked-Data based Construction Raw Data Format (LINKED-DATA 방식을 이용한 건설원천데이터 포맷)

  • Choi, Byoung-Il;Lee, Eun-Ji;Ko, Yong-Ho;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.11a
    • /
    • pp.86-87
    • /
    • 2013
  • Construction data is one of the most important resources in a construction project. The construction data is generally stored in the PMIS. However, it has been analyzed that the PMIS revealed limitations in suggesting valuable information by analyzing the data. In order to overcome such limitations, the linked-data methodology used in big data management has been studied. The purpose of this study is to suggest a methodology that improves the system by developing a more effective data collection and management model using the linked-data format.

  • PDF

Schematic Estimation Process for Finishing Work using 3D Geometry-Knowledge Information (3차원 형상·지식정보를 활용한 마감공사 개산견적 프로세스)

  • Park, Sang-Hun;Park, Hyung-Jin;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.210-212
    • /
    • 2013
  • The construction cost estimates during the design phase becomes the standard to judge profitability and validity, and is very important in various decision-makings by project owner. However, since approximate costs are quoted when many parts are undecided in the early stage of project, differences are bound to occur between the construction cost calculated through approximate quotation and that put into construction actually. Also, since in existing quotation works, quantity calculations have been dependent on the staff's manual work, involving error potential, and thus differences are likely in quantity calculation depending on the quotation staff's method of calculation. In this study, the process of creating space model to deduce 3D geometry information for approximate quotation in association with knowledge information and the expression for calculation of finishing area were proposed.

  • PDF

The Constitution of Process Model for Renovation System of University Building - Focused on the Preparation for the Constitution of Renovation System by Analyzing the Performed Projects - (대학건축물의 리노베이션 수행체계구축 - 수행체계 마련을 위한 수행과정의 사례분석을 중심으로 -)

  • 김종필;박근준
    • Korean Institute of Interior Design Journal
    • /
    • no.32
    • /
    • pp.105-112
    • /
    • 2002
  • The Purpose of this paper is to describe a decision model which can be used to establish an implementation system of renovation for university building. Any implementation model relies on the work scopes of renovation which varies design, project cost, construction duration. The renovation system is subject to evaluation of work steps which is different from each project. Accordingly, the decision model of renovation is necessary to use the application of the analytical hierarchy process. Many of the performance steps used in general renovation condition may be known with uncertainty. This research has shown how probabilities can be explicitly incorporated in the decision model of renovation to assess this uncertainty.

A Basic Study for Finding Methods to solve the Crisis of Construction Industry caused by Deterioration of Liquidity (유동성 악화에 따른 건설산업 위기극복 방안 모색을 위한 기초연구)

  • Kim, Eun-Sung;Lee, Sang-Hyo;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.131-135
    • /
    • 2009
  • Domestic construction industry is facing big difficulties by a worldwide financial crisis. Especially the deterioration of liquidity by the reject of banks for project financing and unsold housing project made a big problem on financing for the ongoing and new projects. To solve this, it is critical for construction companies. banking facilities and public organizations to cooperate and support each other. In this study, the methods which each part can do are investigated. Construction companies can do a price reduction, finance condition improvement for deposit and down payment, asset sale and cost reduction. And Public organizations can buy the assets of construction companies with proper price and ease the regulation to activate transactions of real estate. In the case of Banking facilities, they can support arrangement and liquidation of insolvent projects and so on.

  • PDF