• Title/Summary/Keyword: Building Project

Search Result 2,465, Processing Time 0.03 seconds

RESEARCH AND DEVELOPMENT OF RFIC TECHNOLOGY IN SMART TEMPERATURE INFORMATION MATERIAL

  • Chih-Yuan Chang;San-Shan Hung;Yu-Chueh Chang;Yu-Fang Peng
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.480-486
    • /
    • 2011
  • Conservation of energy and fuel is the trend in smart building design. Radio Frequency Integrated Circuit (RFIC) technology is often used in temperature sensing and signal transmission to manage indoor temperature, but it is rarely applied to the shell of the building. Heat retention and poor insulation in building shells are the largest causes of high energy consumption by indoor air conditioning. Through combining RFIC technology with temperature sensors, this study will develop smart temperature information material that can be embedded in concrete. In addition to accurately evaluating the effectiveness of shell insulation material, the already-designed Building Physiology Information System can monitor long-term temperature changes, leading to smarter building health management.

  • PDF

Implementation and Evaluation of Green Building Features: Case Study of Trees Atlanta Kendeda Center (친환경인증건축물 Trees Atlanta Kendeda Center에 나타난 친환경계획요소의 특징 및 사용자평가 연구)

  • Choi, Young-Oh;Ahn, Yong-Han
    • KIEAE Journal
    • /
    • v.12 no.2
    • /
    • pp.59-64
    • /
    • 2012
  • In the United States, the implementation of the LEED green building rating system has dramatically changed the construction industry to motivate construction participants to employ green building approaches into projects. The objectives of green building rating systems are to achieve the triple bottom line benefits including economic, social and environmental benefits that are able to not only provide an excellent amenity to building users, but also to reduce environmental problems associated with buildings and accomplish financial benefits. Since the implementation of green building features has many benefits, the purpose of this study is to identify occupants' satisfaction of green building and the transformation of occupants'' attitude toward sustainability by conduct an in-depth case study of the cutting-edge green building project located in Atlanta, GA, USA. Based on this case study, it is possible to suggest construction participants in Korea to identify how green building can improve occupants'' satisfaction of the building and change their attitude toward sustainability.

A Feasibility Study of the Construction Project in Pre-Design Phase (건설 프로젝트의 사업타당성 분석에 관한 연구)

  • 노병옥;이상범;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.05a
    • /
    • pp.109-113
    • /
    • 2002
  • Urban public service is goods and activities which satisfy public demands for the political, social, economic, cultural activity and household affairs of individual or groups and which urban government supply with free of charge. In view of government, in addition to fairness of facilities location, location of such facilities are to be determined the respect to cost of locating facilities and developmental direction in the future. Therefore, it is necessary to study on feasibility. A feasibility study Is an effective tool in determining the decision of investment or not and the level of investment priority on Projects requiring a sizeable investment and the feasibility of a project. The first, it is to select reasonable location. It was selected four and two by consideration of facilities distribution and connection with others. Six proposal selected was estimated by five element of approach, demand, symbol, reality, environment. In result proposal I was chosen. The next, it is to estimate scales. The finally, it is to study on economical efficiency. Net Present Value was came out ₩4.4billion by 20years and Inter Rate of Return showed up 11%. in addition, it offer various benefit by public facilities. In conclusion, this project is reasonable.

  • PDF

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

Remodeling Project of the 'Yeonsinae' Catholic Church (연신내 성당 리모델링 구축 프로젝트)

  • Bae, Kang-Hee;Lee, Hyok-Jun
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.53-54
    • /
    • 2006
  • Recently with increasing interest in the operation of life cycle, building remodeling business is spreading like a fashion. Keeping pace with the trend, the present project carried out the remodeling of an existing neighborhood facility into a religious facility based on the concepts of remodeling, reform and renovation. Basic requirements were overcoming spatial limitations, solving structural problems, meeting various functional needs, and securing a spatial size, and the project designed the interior of the building according to these requirements suggested by the owner. To overcome the low floor height of the existing space, the main sanctuary on the 1st floor had the ceiling in the form of a slant and installed indirect lighting into the resulting gaps, maximizing the depth and width of the space visually. The subsidiary sanctuary on the first basement was finished with red bricks, forming an arch using the bricks, to create religious atmosphere. However, considering the low floor height as in the 1st floor and the ceiling even lowered by the arch structure, the arch was formed threefold and the radius of the curvature of the arch was enlarged to secure a spacious feeling. The outer appearance was finished with granite on existing structure to save the cost of construction. In addition to the use of the finishing material, the structure of the arch and the frame of the opening part and the finishing of the walls were expressed with uneven surface in order to avoid the plainness of the appearance.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

An Algorithm for Scheduling Repetitive Projects with Resource Continuity and Different Batch Sizes

  • Shim, Euysup;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.6
    • /
    • pp.565-578
    • /
    • 2013
  • Batch production is common in repetitive construction projects, and it is not unusual for different batch sizes to be used by contractors in one project. While several scheduling methods, such as the Linear Scheduling Method (LSM) and the Repetitive Scheduling Method (RSM) have been proposed and used, no mathematical method for repetitive construction projects has been developed, and it is difficult to consider different batch sizes with the existing methods. An original mathematical algorithm for scheduling repetitive projects with different batch sizes is proposed in this study. This algorithm is illustrated with assumptions of resource continuity and single path in a project and introduces new terms, control batch and critical batch. The algorithm logics and mathematical equations are validated by comparison with the outcomes from a graphical scheduling approach through a simple and practical hypothetic project. As a result, it is expected that the proposed algorithm can be easily adapted and extended to computer software for scheduling, and can be a starting point for research on batch size management in repetitive construction projects.

Improvement of BoQ Documents for the BIM based Quantity Takeoff (BIM기반 물량 및 내역정보 생성을 위한 내역서 개선방안)

  • An, Ji-Won;Yun, Seok-heon
    • Journal of KIBIM
    • /
    • v.7 no.2
    • /
    • pp.16-24
    • /
    • 2017
  • It is very important to estimate accurate construction total cost needed early in the project. In the initial phase of the design, the project cost estimates are determined by total quantity from design documents and the variables that affect the calculation of the total cost of the project. In order to determine accurate total construction cost, the contractor has to produce detailed quantity information based on the drawings and specifications. The process of preparing quantification and cost estimation documents is still being worked out manually, and a lot of errors have been occurred in many cases. Recent advances in information technology have led to the BIM based quantity takeoff and cost estimation. However, there are some limits to the extent to which the current specifications for BoQ documents are computed from BIM model. This research analyze the current BoQ cases and analyze how to make quantity takeoff possible through BIM. The study defined five levels of quantity category that could be produced by BIM. Only about 40% or indirectly usable items can be used when information is extracted to BIM modelling. This is very insufficient to fill out the BoQ. The BoQ document structure quantity takeoff specifications should be simplified in order to BIM based cost estimation more efficiently.

Establishing the Innovation Platform for the Sustainable Regional Development: Tech-Valley Project in Sejong city, Korea

  • Lee, Seo-Jeong;Lee, Eung-Hyun;Oh, Deog-Seong
    • World Technopolis Review
    • /
    • v.6 no.1
    • /
    • pp.5.1-5.12
    • /
    • 2017
  • The Republic of Korea developed a national project to construct a new administrative capital, Sejong city and to relocate administrative organizations of the central government for improvement of overpopulated capital, Seoul and regional balanced development. By the way, to relocate the central administrative organizations was not a sufficient condition for the sustainable development of the city. An industrial infrastructure development has been tried to attract universities, enterprises and research institutions in the region as a demand for internal growth power of the city was increased. In addtion, a basis for regional endogenous growth through projects to establish innovation system based on industry-academia cooperation was prepared as well. This paper reviews the major contents of the development plans for Tech-Valley project and looks into major introductory functions, characterization plans, strategies for fostering strategic industry, cooperation system of the inside and outside the region, and a strategy for building innovation platform. This case can be regarded as a significance of constructing technology infrastructure for the sustainable growth by preparing foundation for establishing innovation system and a cluster based on this system in the process of building and developing new city which did not have any industrial platform in the region.

A Study on the Data Classification in Engineering Stage of Pipeline Project in Extreme Cold Weather (극한지 파이프라인 프로젝트 설계단계에서의 데이터 분류에 관한 연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.214-215
    • /
    • 2014
  • Recently, Russia decided to export an annual 7.5 million tons of natural gas to Korea over 30 years from 2015, as also deal with China, planed to build a pipeline connecting Siberia to Shandong Peninsula about 4000km. Risk management is required depending on the project in extreme cold weather, because it is concerned about the behavior of the seasonal changes in soil temperature and the strain of pipe according to the long-distance pipeline construction. The plan of data management shall be prepared in parallel for a sophisticated risk management, because a data is massive scale and it is generated/accumulated in real time. Therefore, this research is aimed to classify a data items in engineering stage of pipeline by previous studies for managing a generated data depending on the detail works in extreme cold weather. We expect to be provided the foundation of an efficient classification system of a generated data from the pipeline project life cycle.

  • PDF