• 제목/요약/키워드: Building Project

검색결과 2,461건 처리시간 0.028초

블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구 (A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology)

  • 김기호;손승현;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

데이터베이스 중심의 BIM기반 개산견적을 위한 모델 개발 (A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique.)

  • 배성재;서봉교;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2013
  • Recently, a technique based on BIM has been rapidly increased on the construction project. Task such as a calculation of supply easily is proceeded by the technique. Also, an quick and precise preliminary estimate is possible because this technique can be applied. To sum up, this study suggests that the preliminary estimate based on a database of the BIM technique is applicable for the early stage of the construction project.

  • PDF

PC공사의 생산성 분석 및 향상방안에 관한 연구 (A Study of Analysis and Improvement Measures for Productivity in PC Project)

  • 신원상;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.96-97
    • /
    • 2013
  • PC(Precast Concrete) technology has been widely used for reduction of construction period and manpower in domestic construction industry since it was introduced from advanced countries in the 1960s. But most of existing researches are shortage of research which proves the efficiency of PC methods quantitatively. Therefore, this study analyzed productivity targeting construction site workers who are working on projects using the PCF(Precast Concrete Frame) system out of PC methods that is used most typically in construction sites, and in order to provide basic data to prove the efficiency of PC project quantitatively.

  • PDF

유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구 (A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing)

  • 박남천;김균태;박수열;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

원전건설 공급망관리 기술영역 도출을 위한 기초연구 (A Fundamental Research for Technology area of SCM in Korean Nuclear Power Plant Construction)

  • 박항순;김우중;정영환;원서경
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.268-270
    • /
    • 2013
  • The construction project can be defined as a network combined between elements which are engineering, procurement, construction, start-up, and has a plenty of subjects and partners. For the successful project management in construction industry, it is necessary to adopt various management methods, such as lean production, information network system, SCM(Supply Chain Management), which can increase the efficiency of project management. During recent years, even though various management techniques have been applied, the SCM system has not formulated in construction industry. Especially, the Nuclear Power Plant Construction which requires high regulations of the safety and security has not applied SCM. Therefore, this study aimed to propose technology area of SCM in Korean Nuclear Power Plant Construction.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

OSC(Off-Site Construction)기반 PC공법의 시공 프로세스 도출 (Derivation of the Construction Process for Precast Concrete System based on Off-Site Construction)

  • 전영훈;배병윤;윤원건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.289-290
    • /
    • 2021
  • The PC system has advantages in terms of project management, such as shortening the construction period and reducing costs. However, it is difficult to activate the technology due to insufficient application of the technology. Therefore, there is a need for a strategy to expand and activate the PC system. This study is a basic research for PC construction project management, and its purpose is to derive the entire construction process from factory production of PC components to on-site construction. In this study, the construction process of the PC system was derived through literature review, and the main matters for the construction process management of PC system were confirmed in the analysis process. In the future, the results of this study are expected to be used as basic data for research for PC project management, such as deriving construction classification and calculating construction periods.

  • PDF

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

ACTION LEARNING TEACHING-LEARNING STRATEGY IN ARCHITECTURAL ENGINEERING DESIGN CLASSES

  • Myunghoun Jang;Hee-Bok Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.525-530
    • /
    • 2013
  • The importance of engineering design increases due to the expansion of engineering education certification. But there are not much teaching methods and examples of engineering design to be referred to the college classes. This paper introduces a new teaching and learning method of Action Learning adopted to a engineering design class in the Department of Architectural Engineering, J University in Korea. The class included a team project to find problems of facilities or safety management factors in a building construction site, and to provide the alternatives to solve the problems. The Action Learning helped to improve the learning effect of students and to increase the quality of the project deliverables.

  • PDF

스마트 건설기술 활용에 따른 프로젝트 성과 영향에 관한 연구 (An Impact of Project Performance by Using Smart Construction Technology)

  • 김태훈;조규만
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.291-292
    • /
    • 2023
  • In line with the advent of the 4th industrial revolution, project performance such as construction productivity and safety is being improved through the use of various smart technologies in construction projects. However, most studies focus on case analysis according to technology application, and research on performance impact and evaluation methods is insufficient. However, the performance impact of the use of smart construction technology can vary greatly depending on the capabilities and level of support of the organization using the technology. Therefore, this study aims to establish factors that affect the performance of smart construction technology utilization at the organizational level and analyze the performance impact relationship. The results of this study will provide the basis for establishing an organizational system and evaluating performance for the efficient use of smart construction technology in the future.

  • PDF