Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

The Concept of Construction Management Showing up the HwaSungSungYoukEuGye in Choson Dynasty (조선시대 화성성역의궤의 건설관리적 의미)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.167-171
    • /
    • 2008
  • HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.

  • PDF

Preliminary study on the Review Project Viability to Rahmen Structure (라멘조 공법의 사업성 검토에 관한 기초연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.139-140
    • /
    • 2011
  • The government encourages adoption of Rahmen structure design to ensure efficient management of national resources. However, in comparison with bearing-wall structure, Rahmen structure requires higher unit construction cost and present challenges in terms of securing adequate floor area ratio and floor height. That is why project clients have been disinterested in adoption of Rahmen structure design. Therefore, we have attempted to find factors having influence on decline of project viability for Rahmen structure. This study will be utilized as a basic reference study for promotion of Green Frame design which is a composite PC structure already developed.

  • PDF

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

A Basic Study for Selecting the Project Risk Management Check List (PRM(Project Risk Management) 체크리스트 항목 선정을 위한 기초연구)

  • Bang, Hong-Song;Kim, Jin-Kuk;Choi, Byung-Ju;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.99-100
    • /
    • 2017
  • In today's builders PRM(Project Risk Management) for Risk Management to fill out the competitive advantage, by and return it safe and take. But PRM has different standards for each construction company and can also see that even the list. In this study, consideration existing research through PRM by developing a list of check list to proceed to the basic research to help. In this study, PRM by creating a basis of the check list disclosed to the frame of reference. The results of this study by PRM of the check list for field application management system to provide a basis to build.

  • PDF

Optimizing a Construction Schedule Considering Cash-flow (현금 흐름을 고려한 건설일정 최적화에 관한 연구)

  • Lee, Hyung-Guk;Lim, Tae-Kyung;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

A Basic Study on the Introduction of Professional Indemnity Insurance for Construction Project Managers

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.102-111
    • /
    • 2013
  • During the administration of a construction project, various types of participants are engaged in the project. From the design phase to the maintenance phase, these participants may confront many risks. To avoid these risks, participants should utilize an insurance company or a bond company. The types of risks and liability that a construction manager may face are listed in the construction law or contract. But there are some arguments related to risk transferring and the content of risks. For this reason, construction managers must carefully consider any possible risks in the contract and the construction law. Therefore, for construction managers to deal with risks appropriately, the introduction of a legal requirement to carry professional liability insurance, a defined compensation range for damages, a method of guarantee in the event of defects, a defined compensation claim period for damage, and a method of damage claim were suggested in this study.

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

A Study on the Estimation of Proper Numbers of Construction Lifts (건설 리프트의 적정 대수 산정에 관한 연구)

  • Kim, Sun-Kuk;Han, Kap-Kyu
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.3
    • /
    • pp.119-125
    • /
    • 2008
  • The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.