• Title/Summary/Keyword: Building Material

Search Result 2,834, Processing Time 0.025 seconds

A Study on the Development of the Wheel Tracking Test and Evaluation Method on Blind Type of Waterproofing Layer (비노출 방수층의 윤하중 시험 및 평가방법 개발에 관한 실험적 연구)

  • Song Je-Young;Eom Deok-Jun;Kwak Kyu-Sung;Oh Sang-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.67-72
    • /
    • 2006
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and condrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load.

Study on the surface characteristics of concrete walls by coating film of formwork (거푸집 코팅필름에 따른 콘크리트벽의 표면 특성 연구)

  • Lee, Yun-Suk;Seo, Ju-Yeong;Kim, Wan-Su;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.202-203
    • /
    • 2017
  • In this study, the concept of exposed concrete is basically considered and various expressions of concrete surface texture are verified variously. Based on this comparison, the characteristics of exposed surface of concrete according to the change of coating material applicable to formwork are compared and analyzed. I am trying to find a way to apply exposed concrete in a convenient way, In order to observe the characteristics of concrete exposed surface according to the form material, As the surface is smooth and tight, the surface condition of the concrete is smooth and the pore is small.

  • PDF

Constructing Database for Estimating Life Cycle CO2 emissions from Blast Furnace Slag (고로슬래그미분말의 전과정 CO2 배출원단위 평가 및 데이터베이스 구축)

  • Park, Jung-Hoon;Tae, Sung-Ho;Kim, Tae-Hyoung;Lee, Kang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.49-51
    • /
    • 2012
  • This study was conducted as a part of database construction for development of CO2 assessment system for concrete to assess CO2 emissions and analyze characteristics of blast furnace slag manufactured in Korea through life cycle assessment method. For this, life cycle CO2 emissions assessment technique for construction materials was examined. The entire manufacturing process for blast furnace slag was analyzed on blast furnace slag manufacturer in Korea for application of assessment technique. Life cycle CO2 assessment was performed on blast furnace slag after classifying assessment process into raw material production step, raw material transportation step and construction material manufacture step.

  • PDF

Effect on the Physical Performance of Functionalized Silane Coupling Agent on Epoxy-Based Concrete Surface Finishing Material for Parking Floor (기능성 실란 커플링제가 에폭시계 콘크리트 주차장 바닥용 마감재의 물리적 성능에 미치는 영향)

  • Chae, Woo-Byung;Seong, Dong-Yun;Seo, Sang-Kyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.279-282
    • /
    • 2012
  • This study attempted to the effect on the physical performance of silane coupling agent on solventless epoxy-based concrete surface finishing material for parking floor. Tests were carried out in accordance with KS F 4041 and KS F 4937. The results of compressive strength, flexural compressive are 95.6N/㎟, 25.4N/㎟ and after wheel moving load testing, average abrasive depth is 0.96mm, these results satisfied the quality standard of KS F 4041, KS F 4937. As conclusion, this study confirmed that the silane coupling agent greatly effected on the physical performance of solventless epoxy resin.

  • PDF

An Experimental Study on the Estimation of Sol-air Temperature and Absorptance in Building Exterior Materials by Using the Infrared Image (적외선 열화상을 이용한 건축외장재의 일사표면온도와 흡수율 추정에 관한 실험적 연구)

  • Park, Sa-Keun;Jang, Gil-Soo;Song, Min-Jeong;Shin, Hoon
    • KIEAE Journal
    • /
    • v.6 no.4
    • /
    • pp.33-39
    • /
    • 2006
  • This study aims to investigate the method to reduce the surface temperature caused by insolation. To achieve this goal, surface temperature of building is measured and the effects of exterior material's color and brilliance were checked with infrared imaging. And also, exterior material's absorptances due to outdoor surface heat transfer coefficients were measured. After surface temperature measurement of 37 specimen of 5 categories, the temperature is the highest on wood($53.62^{\circ}C$) and panel($52.05^{\circ}C$). Dryvit, stone, brick is the rating of order. For exterior material's absorptances, panel(0.883) and wood(0.868) were high and Dryvit, stone, brick follows wood and panel.

The research of Economical Re-oder point Estimating Method for building construction on the Downtown Area (도심지 건설공사 건설 자재의 효율적 재주문시점 산정 방안에 관한 연구)

  • Yun, Jung-Suk;Kim, Geun-Hwan;Jo, Young-Sik;Kim, Chang-Duk
    • KIEAE Journal
    • /
    • v.13 no.1
    • /
    • pp.159-165
    • /
    • 2013
  • Recently buildings are being constructed on the downtown area. In most building construction sites on the downtown area, the need for adequate material inventories are critical in order to avoid project delays and cost increases due to inappropriate deliveries of key materials. However immoderate material inventories cause increasing inventory cost. Therefore, we need a proper management material inventories. This research re-establishes the existing safety stock and analyzes relationship between safety stock and service level. It suggests an economical re-order point based on safety stock considering service level, various demand and delivery time.

The Improvement Plan of Design Process by Case Study of Steel Structural Work (철골공사 현장조사를 통한 설계프로세스 개선방안)

  • 방성원;오승준;김진호;임남기
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.121-126
    • /
    • 2003
  • Steel frame construction is divided into subsidiary materials with column, beam, girder and bracing. After these are processed in factory for using installing in construction field. These prefabricated furniture is very important in accordance with design drawing about processing and prefabricating. In the case of design process using information transmission in blueprint, omission of material number, processing measure and finishing material, or discordance of each structure drawing and selecting incongruent structural material generated an error in the process of design. These error caused delaying tine and increasing cost and increasing safety accident in the steel-structure work operating process. therefore, design process should consider problem of operating process.

  • PDF

A Study on the Blind Type of Waterproofing Layer of Wheel Tracking of Test Method and Valuation on Working of Live Load (이동하중이 작용하는 비노출 방수층의 윤하중 시험방법 및 평가에 관한 연구)

  • Eom Deok-Jun;Seon Yun-Suk;Kwon Si-Won;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.1-5
    • /
    • 2005
  • There are a lot of problem about waterproofing membrane coating for concrete deck of bridge and waterproofing sheets for concrete of deck of bridge because it couldn't confirm waterproofing's defeat after construction. These problems make a waterproofing material damage and concrete deck of bridge damage. So It needs a lot of money for repair work and reinforcement work. Therefor the structure slab of using waterproofing material protect invasion of water. Also, Concrete deck of bridge need a endurance permeability for the reduction repair payment. In this study, An experimental study on the quality standardization test method waterproofing layer on working of live load

  • PDF

An Experimental Study on the Non-Exposure Composite Waterproofing Method used Adhesion Liquid and Sheet Integrate Waterproofing Material (점착형 도막.시트 일체형 방수재를 이용한 비노출용 복합 방수공법에 관한 실험적 연구)

  • Kim, Jin-Sung;Seon, Yun-Suk;Park, Jin-Sang;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.125-128
    • /
    • 2007
  • The problem of water leakage due to damaging waterproof in concrete structure, causes the impediment in a long term and shortened the life span of durability. There are a lot of techniques for repair and reinforcement to improve using environment. However, the improper construction which is unconsidered various environmental conditions, could effect to increase the maintenance expenses. Therefore, this study will be compared and estimated the adhesion liquid and sheet integrate waterproofing material, as analyzing the existing problem. For those result, we would like to arrange the alterative plan for the long durability and user needs of concrete structure.

  • PDF

Analysis on the Factor of Revision of Pipe Laying Down Material and Connection Work Material (표준품셈 관부설 및 접합공사 품 개정 요인 분석)

  • Oh, Jae-Hoon;An, Bang-Yul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.302-303
    • /
    • 2018
  • This study analyzed the major revision factors and revision contents for 'Construction-Standard-Production-Rate for Construction Works in 2018. Part 16. Pipe Laying Down and Connection" which was revised by the construction expense estimation standard's middle and long-term plans. The main reasons for the revision was analyzed to be unclear construction scope, limitations in applicable pipe material based on the facility type, labor force mainly composed of ordinary workers, limitations of labor force, and incomplete appropriation standard for the tool rent fee and equipment expenses. Through revision of factors, common items were newly established, organization was revised, the labor force was mainly composed of the technicians, and basis for appropriation of equipment expenses was arranged. In addition, through periodic revision, the appropriation standard for bend and special pipes was set. Consequently, more practical construction cost estimate standard is arranged through revision.

  • PDF