• Title/Summary/Keyword: Bridge maintenance

Search Result 984, Processing Time 0.026 seconds

Analysis of Behavior due to Tendon Damage for Maintenance of PSC I Girder Bridge (PSC I 거더교 유지관리를 위한 긴장재 손상에 따른 거동 분석)

  • Jongho Park;Jinwoong Choi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.2
    • /
    • pp.53-60
    • /
    • 2024
  • Prestressed concrete (PSC) bridges are vulnerable to corrosion and fracture of tendons, and in particular, structures using the internal post-tensioned with grouted system have difficulties in maintenance due to limitations of inspection. In this study, the actual behavior of PSC I girder bridge was analyzed according to tendon damage. The target PSC I girder bridge, an decommissioned highway bridge of upper and lower bridges, had the service period of 33 years and 20 years, respectively. Deflection and concrete strain were measured according to the location of damaged tendon and loading method. Regardless of the age of the bridge, its structural performance decreased when the damaged tendon was closer to the center of the girder. The change in behavior increased as the truck load approached to the girder where the tendon cut. If the load was applied to the adjacent girder where the tendon was cut, the structural performance was likely to be maintained due to the influence of the entire structural system. The change in deflection was difficult to observe visually, while the concrete strain exceeded the cracking strain. Therefore, it is recommended that future monitoring and inspection of PSC I girder bridges should focus on concrete strain or cracking.

Maintenance of the Sea-crossing Bridge for Ship Collision Problems (선박충돌 문제에 대한 해상교량의 유지관리)

  • Bae, Yong-Gwi;Lee, Seong-Lo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.6
    • /
    • pp.56-64
    • /
    • 2016
  • Damage of sea-crossing bridge by ship collision is related to estimate frequencies of overloading due to impact, and bridge accordingly must be designed to satisfy related acceptance criteria. Another important aspect is the management on increment of collision risk during the service period. In this study, related plan, main span length, air draft clearance and collision risk are analyzed for the interim assessment of Incheon Bridge focusing on the ship collision problem. In particular, for the increment of collision risk, the optimized navigation speed is proposed by reviewing the research findings and navigation guidelines etc. as a temporary expedient. Also basic procedure for reasonable prediction of target vessel and passage is established and probabilistic prediction method to embrace the uncertainty of the prediction is proposed as a fundamental solution. It is necessary to conduct further research on collision risk management and promptly carry out interim assessments of other marine bridges.

Development of Bridge Inspection Reliability and Improvement Strategy (교량 점검신뢰도 분석법 개발과 향상방안)

  • Jeong, Yo-Seok;Kim, Woo-Seok;Lee, Il-Keun;Lee, Jae-Ha
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.5
    • /
    • pp.50-57
    • /
    • 2016
  • The present study proposed three inspection reliability indices which compared inspection results evaluated at in-depth(routine) inspection and in-depth safety inspection; Nominal inspection reliability index, Real inspection reliability index, and DS nominal inspection reliability index. The methods to improve the inspection reliability were also proposed. Since bridge inspection process is critical to ensuring the safety of bridges and identifying repair and maintenance needs, the quality of the inspection data produced from the inspection process is very important. Consequently, the inspection reliability indices were suggested to evaluate quality of current inspection practices. Specifically, approximately 85% of inspection errors evaluated by the DS nominal inspection reliability index are within 1 rating grade(equal to or less than damage score ${\pm}0.1$). In order to improve the inspection reliability, transportation agency should implement QC(Quality Control) practices and develop professional expertises of inspectors by higher requirements for inspectors, on-off line inspection training and etc.

An Intelligent bridge with an advanced monitoring system and smart control techniques

  • Miyamoto, Ayaho;Motoshita, Minoru
    • Smart Structures and Systems
    • /
    • v.19 no.6
    • /
    • pp.587-599
    • /
    • 2017
  • This paper introduces an approach to the realization of an ICT-based bridge remote monitoring system that enables real-time monitoring and controlled adjustments for unexpected heavy loads and also for damaging earthquakes or typhoons. In this paper, an integrated bridge remote monitoring system called the "Intelligent Bridge", which consists of a stand-alone monitoring system (SMS) and a web-based Internet monitoring system(IMS), was developed for not only bridge maintenance but also as an application for a para-stressing bridge system. To verify the possibility of controlling the actual structural performance of an "Intelligent Bridge", a model 2-span continuous cable-stayed bridge with adjustable cables was constructed. The experimental results demonstrate that the implemented monitoring system supplies detailed and accurate information about bridge behaviour for further evaluation and diagnosis, and it also opens up prospects for future application of a web-based remote system to actually adjust in-service bridges under field conditions.

Requirement analysis for visualization of condition assessment in 3D Bridge Model (3차원 교량모델에서의 상태평가정보 가시화를 위한 요구사항 분석)

  • Huang, Meng-Gang;Kim, Bong-Geun;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.238-241
    • /
    • 2010
  • This paper proposed an approach to integrate bridge condition assessment related information with a 3D bridge model to visualize bridge condition assessment information in the 3D bridge model. In this approach, bridge information model plays a centric role in the data access and realizes the integration of bridge initial design and historical bridge maintenance records. Behind the bridge information model is a rational database. After the system requirements for this approach, several IFC data model extensions are suggested.

  • PDF

The Condition and Safety Assessment using Fuzzy Fault Tree Analysis for Bridge System (퍼지결함수분석을 이용한 교량시스템의 상태 및 안전성 평가)

  • 이중빈;나기현;손용우;박주원
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.10a
    • /
    • pp.79-86
    • /
    • 1999
  • This paper aims to propose a method that helps maintenance engineers to evaluate the damage states of bridge systems by using a Fuzzy Fault Tree Analysis(FFTA). It may be stated that Fuzzy Fault Tree Analysis may be may useful for the systematic md rational condition and safety assessment for real bridge systems problems because the approach is able to effectively deal with all the related bridge system damages in terms of the linguistic variables that incorporate systematically experts experiences and subjective judgement.

  • PDF

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

The Real-time Health Monitoring System of a Cable-stayed Bridge Based on Non-destruction Measurement (비파괴계측에 의한 사장교의 공용간 상시안전감시시스템)

  • Choi, Man-Yong;Kang, Kyung-Koo;Kim, Jong-Woo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.22 no.3
    • /
    • pp.239-245
    • /
    • 2002
  • Many civil and infrastructures continue to be used despite aging and the associated potential for damage accumulation. Therefore, the ability to monitor the health of these systems is becoming increasingly important. The purpose of this paper is to propose a real-time health monitoring system of cable-stayed bridge, based-on non-destructive measurement. And also this paper focuses on the safety assessment for bridge from health monitoring system to accomplish this safety assesment. Using the proposed health monitoring system, it helps bridge maintenance and reduces the economic cost of a life-cycle costs. Also it give important data to develop the design and analysis method for cable-stayed bridges.

Application for a BWIM Algorithm Using Density Estimation Function and Average Modification Factor in The Field Test (밀도추정함수와 평균보정계수를 이용한 BWIM 알고리즘의 현장실험 적용)

  • Han, Ah Reum Sam;Shin, Soobong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.70-78
    • /
    • 2011
  • The paper aims at developing a more reliable and accurate BWIM(Bridge Weigh-In-Motion) algorithm using measured strain data and examining its efficiency with various tests on bridges. It proposes a BWIM algorithm using density estimation function and average modification factor for moment-strain relationship. Density estimation function has been proved to be reliably applied when multiple axle loads are estimated. An average modification factor is applied to minimize overall error that can be encountered between theoretically computed moments and measured strains at multiple locations in a bridge. The developed algorithm has been successfully examined through numerical simulations, laboratory tests, and also by field tests on a multi-girder composite bridge.