• Title/Summary/Keyword: Breakdown & repair

Search Result 54, Processing Time 0.037 seconds

Development and Evaluation of Epoxy VPI Insulation for High Voltage Rotating Stator Windings (고압회전기 권선용 에폭시 VPI 절연물의 개발과 평가)

  • Lee, Chang-Ryong;Choi, Yong-Chan
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.05d
    • /
    • pp.38-42
    • /
    • 2003
  • The use of VPI impregnated mica tape as high voltage insulation for large rotating electric machines requires a careful balance of processes and materials to obtain the desired electrical, mechanical and thermal characteristics. The stator insulation systems such as epoxy bonded high voltage mica tape have been produced for many years. One such system employing an epoxy and anhydride impregnating resin developed by Hyundai Heavy Industries, Co. (hereafter, HHI), to satisfy customer requests for an epoxy bonded insulation system. HHI applies the following electrical and thermal evaluations such as dielectric breakdown, voltage endurance, dissipation factor vs. temperature, isothermal weight loss, and so on. A detailed laboratory evaluation can describe specific physical limitations for an insulation system and permit development of long-term operation guidelines that permit full utilization of the proposed system. HHI has found these evaluations very helpful in qualifying insulation system for the repair of both large motors and generators.

  • PDF

A Study on Insulation Property of VPI Type Generator Stator Winding Through the Case Analysis of Insulation Breakdown (절연파괴 사례분석을 통한 진공함침 방식 발전기 고정자권선의 절연특성 연구)

  • Kong, Tae-Sik
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.3
    • /
    • pp.311-316
    • /
    • 2010
  • According to increase of combined cycle power generation, the manufacturing market of gas turbine generator has become more competitive, so there is high pressure on the manufacturer to reduce generator price. Global VPI(vacuum pressure impregnation) method is effective to save the production cost and time for manufacturing stator windings, but it has an abrasion problem by vibration between stator windings and slots. This paper presents the insulation breakdown case, which is for VPI type generator during high voltage insulation tests, and also shows the cause analysis, repair works as well as reliability test. the purpose of this paper is to understand the insulation properties of VPI type generator and to know prevention of insulation weakness.

Soil Breakdown Test using Fixture (Fixture를 이용한 토양 절연파괴 실험)

  • Lee, H.G.;Ha, T.H.;Jung, D.H.;Ha, Y.C.;Kim, D.K.;Bae, J.H.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.384-385
    • /
    • 2007
  • The fault current through the earth originated from a power line ground fault might cause arcing through the soil to an adjacent pipeline, which might bring about not only a catastrophic accident such as gas explosion and oil leakage but also a hazard to the safety of workers responsible for the maintenance and repair of the pipeline. In this paper we experimented on the soil breakdown test using the fixture and outlined the standards for the separation distance of a buried pipeline adjacent to the power line tower.

  • PDF

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

A Study on Program Development for Preventive Maintenance of Electrical Facilities (전기수용설비 예방보전을 위한 보수지원용 프로그램 개발)

  • Kim, Se-Dong;Choi, Do-Hyuk;Ryu, Seung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 1996.07a
    • /
    • pp.232-234
    • /
    • 1996
  • As a building is getting large-scale, composition and intelligence, it is required the stability of building electrical facilities. And it is very difficult of rapidly repair on a breakdown of building electrical facilities. Therefore high-reliability and efficiency of building safety is required. And thus, this study presents the repair-maintenance support program for preventive maintenance on a builing electrical facilities. This program makes offer some functions, facilities history input mode, checking and result mode. User can be made offer the cause and effect information of facilities-faults by this preventive maintenance program.

  • PDF

Development of a Stochastic Group Replacement Model for Two Independent Equipments (설비의 일괄교체를 위한 확률모형 개발)

  • Rhee, Hahn-Kyou
    • IE interfaces
    • /
    • v.12 no.1
    • /
    • pp.114-120
    • /
    • 1999
  • A system consisting of two continuously and independently operating equipment subject to breakdown and repair, is considered. It is assumed that both equipment age only when in operation, and a group replacement policy is in effect, that is, both equipment are replaced simultaneously by new identical ones as soon as either of them reaches a specified replacement age. First, a system of partial differential equations based on enumerating the various probabilistic events, is derived. Then, solutions of such system of equations for a model considered in the steady-state are obtained. Finally, an economic analysis is performed to determine the optimal replacement ages of both equipment.

  • PDF

The optimal system for series systems with warm standby components and a repairable service station

  • Rashad, A.M.;El-Sherbeny, M.S.;Gharieb, D.M.
    • International Journal of Reliability and Applications
    • /
    • v.11 no.2
    • /
    • pp.89-106
    • /
    • 2010
  • This paper deals with the reliability and availability characteristics of three different series system configurations with warm standby components and a repairable service station. The failure time of the primary and warm standby are assumed to be exponentially distributed with parameters ${\lambda}$ and ${\alpha}$ respectively. The repair time distribution of each server is also exponentially distributed with parameter ${\mu}$. The breakdown time and the repair time of the service station are also assumed exponentially distributed with parameters ${\gamma}$ and ${\beta}$ respectively. We derive the reliability dependent on time, availability dependent on time, the mean time to failure, $MTTF_i$, and the steady-state availability $A_i$(${\infty}$) for three configurations and perform comparisons. Comparisons are made for specific values of distribution parameters and of the cost of the components. The three configurations are ranked based on: $MTTF_i$, $A_i$(${\infty}$), and $C_i/B_i$ where $B_i$ is either $MTTF_i$ or $A_i$(${\infty}$).

  • PDF

A Comparative Study on Differences in Interaction between Beginning Foreign Learners and Heritage Learners: Focused on Form (초급 외국인 학습자와 계승어 학습자의 상호작용 비교 연구 -형태 초점 양상을 중심으로-)

  • Lee, Bok Ja
    • Journal of Korean language education
    • /
    • v.29 no.3
    • /
    • pp.197-225
    • /
    • 2018
  • The purpose of this study is to compare the difference in the interactions between beginning language learners and heritage learners on their forms based on the interaction hypothesis. In this study, three types of information gap activities were used to analyze Language Related Episodes (LREs) while investigating the interaction patterns in language use between four pairs (eight learners) of foreign learners and four pairs (eight learners) of English-speaking heritage learners. The result indicated that foreign learners had a high focus on form during interaction. In particular, they had a tendency to focus on vocabulary rather than grammar, and they conducted self-repair by examining and mostly adjusting their speech to postposition and tense. However, in the problem-solving process, they showed a limited ability in interaction, and thus directly asked others to settle the problem or resorted to using English due to their lack of ability to employ various communication strategies. However, heritage learners had a relatively low focus on form compared to foreign learners. Yet, they also focused more on vocabulary rather than grammar and conducted self-repair in interaction, especially for vocabulary. In addition, they were skillful at using various communication strategies such as indirect expressions, use of alternative words, evasion, and delaying, to expand speech and prevent communication breakdown. They focused less on grammar and mostly did not provide negative feedback in interaction.

Survey on the Regular Maintenance of Agricultural Machinery (농업기계 정기점검정비 실태조사)

  • Kang, J.W;Lee, W.Y.;Lee, S.B.;Lee, J.H.
    • Journal of Practical Agriculture & Fisheries Research
    • /
    • v.3 no.1
    • /
    • pp.142-157
    • /
    • 2001
  • This study was conducted to get the basic information for promoting farm machinery productivity by surveying the regular maintenance and repair status of major farm machinery such as power tiller, farm tractor, rice transplanter and combine harvester. The survey was carried out through 9 provinces including Cheju province by direct visiting farmers with prepared questionnaire. The results of this study can be summarized as follows : 1. The average farming carrier of the surveyed farmers was 25.3 years, and 21-30 years of farming carrier showed the highest portion as 40.7%. The average carrier of using farm machinery was 9.4 years, and that was 14.9 years for power tiller, 8.3 years for farm tractor, 9.0 years for rice transplanter, 7.9 years for combine harvester, 7.5 years for mini tiller, 9.7 years for power sprayer, and 8.2 years for binder etc. 2. The regular maintenance for farm machinery was conducted mainly at repair shop (49.5%) or dealer agency (12.0%) as 61.5%, and 34.9% of farmers conducted the regular maintenance by themselves at their house. 3. The reasons for not-fully recognizing operation manual and insufficient before-, during-, after-maintenance of farm machinery were insufficient time for them (45.8%), troublesome (22.9%), unknown maintenance method (16.3%), unknown the necessity for maintenance (12.4%), and others (2.6%) in order. 4. For the annual exchange of engine oil, 3.2 times is necessary but actually 1.7 times was exchanged for power tiller, 4.3 times is necessary but actually 1.9 times was exchanged for farm tractor, 2.7 times is necessary but actually 1.7 times was exchanged for rice transplanter, 2.2 times is necessary but actually 2.3 times was exchanged combine harvester. 5. For the annual cleanness or exchange of fuel filter, 3.2 times is necessary but actually 1.1 times was done for power tiller, 4.3 times is necessary but actually 1.6 times was done for farm tractor, 2.7 times is necessary but actually 1.7 times was done for rice transplanter, 1.9 times is necessary but actually 0.8 times was done for combine harvester. 6. For the annual cleanness or exchange of air filter, 3.2 times is necessary but actually 1.4 times was done for power tiller, 4.2 times is necessary but actually 2.4 times was done for farm tractor, 2.6 times is necessary but actually 1.6 times was done for rice transplanter, 3.9 times is necessary but actually 7.0 times was done for combine harvester. 7. For the experience of breakdown related to maintenance, 5.3% of farmers experienced breakdown due to the insufficient exchange of engine oil, 7.7% of farmers experienced breakdown due to the insufficient cleanness or exchange of fuel filter, and 2.9% of farmers experienced breakdown due to the insufficient cleanness or exchange of air filter. 8. Most farmers (76.1%) recognized the necessity for agricultural machinery training or education, and most farmers preferred about one week for the training period, simple or ease maintenance for the training level, agricultural technical center or agricultural machinery manufacturer for the training agency. 9. Complete recognition of operation manual and sufficient before-, during-, and after-maintenance for farm machinery can minimize the breakdown as well as conduct suitable period farming, enlarge the endurance, prevent the safety accidents, and promote productivity of farm machinery. Therefore, these can be accomplished by the thorough training or education for agricultural machinery.

Improvement of Elevator Management System after Completion (준공 이후 승강기 관리체계 개선에 관한 연구)

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.5
    • /
    • pp.455-461
    • /
    • 2016
  • To operate a large structure or a high-rise building, elevator is essential. Nevertheless, elevator breakdowns or accidents have been consistently reported. When the accidents are not serious, the records are not reported and cumulated in the Korea Elevator Safety Agency. Additionally, in case of replacement or repair of the parts of elevator, conflicts about the person responsible for the expense of the replacement or repair are frequently occurred. However the record of accidents is not decreasing and the conflict about the fund of elevator repair is serious. So, it is needed to reduce the elevator accidents or malfunction, the operation stop of the elevator, the conflict between building owners and users. Therefore, in this study, the elevator maintenance procedures during defect liability period, the notification procedure in case of breakdown or accident elevator, the direction of elevator maintenance contracts, the direction of the elevator inspection were suggested.