• Title/Summary/Keyword: Batch Scheduling

Search Result 67, Processing Time 0.026 seconds

A Batch Scheduling Problem for Jobs with Interval-typed Processing Time (구간 공정 시간을 갖는 작업들의 일괄처리 일정계획문제)

  • 오세호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.1
    • /
    • pp.47-50
    • /
    • 2004
  • This paper deals with the problem of batching and scheduling of jobs whose processing times are different respectively But, they are given as not the exact value but the range from the lower limits to the upper, which makes it possible to group jobs into batches. The grouping of jobs is desirable because of the capability of the batch processor to accommodate several jobs at once. The time required to process the jobs in any batch depends on their lower limit processing times. Once processing is initiated on a batch processor, the batch cannot be interrupted, nor can other jobs be started. And all jobs are assumed to be simultaneously available. This paper develops the model to describe these situation and a heuristic method to minimize its total tardiness.

Transfer Batch Scheduling for a Two-machine Flow Shop with Attached and Separated Setup Times (기계가 2대인 흐름생산시스템에서 생산준비시간 분리와 이송배치를 고려한 일정계획)

  • 김중순
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.26 no.1
    • /
    • pp.87-96
    • /
    • 2001
  • This paper considers the transfer batch scheduling problem for a two-machine flow shop with setup times consisting of attached setup time and separate setup time. The attached setup is attached to the processing and can be scheduled in anticipation of arriving work. Two cases of the separate setup are addressed. One is the case that the separate setup can be done only when a machine is idle. The other is the case that the separate setup can be done even though the machine is idle. the other is the case that the separate setup can be done even though the machine is operating. A scheduling rule similar to Johnson\`s rule is suggested to minimize makespan. the scheduling rule developed can be applied to most of the two-machine flow shop scheduling problems if some parameters are adjusted. A numerical example is presented to illustrate the scheduling rule.

  • PDF

Fabrication Scheduling of Products with Common and Unique Components at a Single Facility (공통 및 고유부품으로 구성되는 제품의 부품공급을 위한 단일설비 일정계획)

  • 윤상흠
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.28 no.4
    • /
    • pp.105-114
    • /
    • 2003
  • This paper considers a single facility scheduling problem for the fabrication of components supporting the subsequent assembly into products. Each product consists of two types of components, one is common to all products and the other is unique to itself. The unique components are processed individually and the common components are processed in batches, and a distinct setup is incurred for the production of a batch of common components. Under the so-called “batch availability” environment, we propose an efficient dynamic programming(DP) procedure for the optimal sequencing and batching schedule with minimum total completion times of products in the situation that each product is said to be complete if both common and unique components of the product are finished. Computational results show that the proposed DB procedure is more efficient than the previous work which has considered the same problem as this paper.

A batch scheduling scheme for the workcenters that supply parts to mixed-model assembly lines (혼류 조립 라인에 batch 단위로 부품을 공급하는 단위 작업장의 생산계획 수립)

  • 백종관;백준걸;김성식
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.369-372
    • /
    • 1996
  • The factory under this study consists of mixed-model assembly lines and workcenters which provide parts to the main lines. Parts produced by the workcenter have different specifications for different product models. The workcenters fabricate parts in batches, and they are divided into two types. A type 1 center supplies parts only to the main line that is designated to the center while type 2 center provides parts to all the main lines. The purpose of this study is to develop a scheduling scheme for the workcenter, and the main objective of the schedules is to provide parts for the main lines without delay. The facts that make the scheduling challengeable are that 1) the different models existing together on a main line request different parts, 2) the spaces for part inventories are limited and 3) set up times are sequence dependent and long in some cases. This study presents developed scheduling schemes for the type 1 center and explains the scheduling and control structure used.

  • PDF

A Heuristic for Sequencing and Scheduling of Multiple Feedstock Biogas Production Systems (다수의 Feedstock을 이용하는 메탄가스 생산시스템의 일정계획에 관한 발견적 기법)

  • Gim, Bong-Jin
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.22 no.1
    • /
    • pp.155-164
    • /
    • 1996
  • Biomass to methane via anaerobic digestion conversion is a good supply method of substitutable energy resources. The economic viability of this technology is contingent upon managing the production facilities in a cost effective manner. The problem is to determine the batch production sequence as well as the batch residence times in the digester so as to maximize total gas production over a given planning horizon. The problem is difficult to solve since the batch sequencing decisions and the batch residence time decisions cannot be isolated. This paper developes a heuristic algorithm which is based on a dynamic programming procedure for the multiple feedstock sequencing and scheduling biogas production systems and demonstrates to yield good results.

  • PDF

Transfer Batch Scheduling for a Flexible Flowshop with Identical Parallel Machines at Each Stage (다단계 병렬 흐름생산시스템에서 이송크기가 2이상인 경우의 제품별 로트 투입순서 결정)

  • ;F. Fred Choobineh
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.25 no.2
    • /
    • pp.33-46
    • /
    • 2000
  • The problem of scheduling n independent jobs on serial stages with identical parallel machines at each stage is considered. Each job lot is allocated evenly to all machines at each stage for processing and moved in transfer batches between states., This scheduling strategy is called an identical production pattern. The objective is to find a permutation schedule that minimizes makespan. A branch and bound algorithm is suggested to find an optimal permutation schedule for a transformed problem A number examples is presented to illustrate the branch and bound algorithm, Computational results for 640 problems generated randomly show that within a resonable time the suggested algorithm can be used for transfer batch scheduling in a flexible flowshop.

  • PDF

Customer Order Scheduling Problems with a Fixed Machine-Job Assignment

  • Yang, Jae-Hwan;Rho, Yoo-Mi
    • Management Science and Financial Engineering
    • /
    • v.11 no.2
    • /
    • pp.19-43
    • /
    • 2005
  • This paper considers a variation of the customer order scheduling problem, and the variation is the case where the machine-job assignment is fixed. We examine the parallel machine environment, and the objective is to minimize the sum of the completion times of the batches. While a machine can process only one job at a time, different machines can simultaneously process different jobs in a batch. The recognition version of this problem is known to be NP-complete in the strong sense even if there exist only two parallel machines. When there are an arbitrary number of parallel machines, we establish three lower bounds and develop a dynamic programming (DP) algorithm which runs in exponential time on the number of batches. We present two simple but intuitive heuristics, SB and GR, and find some special cases where SB and GR generate an optimal schedule. We also find worst case upper bounds on the relative error. For the case of the two parallel machines, we show that GR generates an optimal schedule when processing times of all batches are equal. Finally, the heuristics and the lower bounds are empirically evaluated.

The Operational Optimization of Semiconductor Research and Development Fabs by FAB-wide Scheduling (FAB-Wide 스케줄링을 통한 반도체 연구라인의 운용 최적화)

  • Kim, Young-Ho;Lee, Jee-Hyong;Sun, Dong-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.4
    • /
    • pp.692-699
    • /
    • 2008
  • Semiconductor research and development(R&D) fabs are very different than production fabs in many ways such as the scales of production, job priority, production methods, and performance measures. Efficient operations of R&D fabs are very important to the development of new product, process stability, high yield, and ultimately company competitiveness. This paper proposes the fab-wide scheduling method for operational optimization of the R&D fabs. Most scheduling systems of semiconductor fabs have only focused on maximizing throughput of each separated areas without considering WIP(works in process) flows of entire fab. In this paper, we proposes the a fab-wide scheduling system which schedules all lots to entire fab equipment at once. We develop the MIP(mixed integer programing) model which allocates the lots to production equipment considering many constraints of all processes and the CP(constraint programming) model which determines the sequences of the lots in the production equipment. The proposed FAB-wide scheduling model is applied to the newly constructed R&D fab. As a result, we have accomplished the system based automated job reservation, decrease of the hot lot delay, increase of the queue time satisfaction, the high throughput by maximizing the batch sizes, decrease of the WIP TAT(Turn Around Time).

Customer Order Scheduling Problem on Parallel Machines with Identical Order Size

  • Yang, Jae-Hwan
    • Management Science and Financial Engineering
    • /
    • v.13 no.2
    • /
    • pp.47-77
    • /
    • 2007
  • This paper considers a scheduling problem where a customer orders multiple products(jobs) from a production facility. The objective is to minimize the sum of the order(batch) completion times. While a machine can process only one job at a time, multiple machines can simultaneously process jobs in a batch. Although each job has a unique processing time, we consider the case where batch processing times are identical. This simplification allows us to develop heuristics with improved performance bounds. This problem was motivated by a real world problem encountered by foreign electronics manufacturers. We first establish the complexity of the problem. For the two parallel machine case, we introduce two simple but intuitive heuristics, and find their worst case relative error bounds. One bound is tight and the other bound goes to 1 as the number of orders goes to infinity. However, neither heuristic is superior for all instances. We extend one of the heuristics to an arbitrary number of parallel machines. For a fixed number of parallel machines, we find a worst case bound which goes to 1 as the number of orders goes to infinity. Then, a tighter bound is found for the three parallel machine case. Finally, the heuristics are empirically evaluated.

An Integer Programming Model and Heuristic Algorithm to Solve Batch Production Scheduling Problem Considering Idle State (대기 상태를 고려한 배치 단위 생산 공정에서 생산계획 수립을 위한 정수계획법 모형 및 휴리스틱 알고리즘 개발)

  • Han, Jung-Hee;Lee, Young-Ho;Kim, Seong-In;Park, Eun-Kyung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.11a
    • /
    • pp.506-512
    • /
    • 2006
  • In this paper, we propose a lot-sizing and scheduling problem that seeks to minimize the sum of production cost and inventory cost over a given planning horizon while considering idle state of a machine in a batch production system. For this problem, we develop an integer programming model. And, we develop an efficient 2-phase heuristic algorithm to find a high quality feasible solution within reasonable time bounds. In the first phase, we seek to minimize the production cost by assigning batches to machines. Then, in the second phase, we find a production sequence of batches that reduces the inventory cost, while considering adding or deleting idle states between batches. Computational results show that the developed heuristic algorithm finds excellent feasible solutions within reasonable time bounds. Also, we could significantly reduce the total cost consisting of production cost and inventory cost by using the developed heuristic algorithm at a real manufacturing system that produces zinc alloys.

  • PDF