A batch scheduling scheme for the workcenters that supply parts to mixed-model assembly lines

혼류 조립 라인에 batch 단위로 부품을 공급하는 단위 작업장의 생산계획 수립

  • Published : 1996.04.01

Abstract

The factory under this study consists of mixed-model assembly lines and workcenters which provide parts to the main lines. Parts produced by the workcenter have different specifications for different product models. The workcenters fabricate parts in batches, and they are divided into two types. A type 1 center supplies parts only to the main line that is designated to the center while type 2 center provides parts to all the main lines. The purpose of this study is to develop a scheduling scheme for the workcenter, and the main objective of the schedules is to provide parts for the main lines without delay. The facts that make the scheduling challengeable are that 1) the different models existing together on a main line request different parts, 2) the spaces for part inventories are limited and 3) set up times are sequence dependent and long in some cases. This study presents developed scheduling schemes for the type 1 center and explains the scheduling and control structure used.

Keywords