• Title/Summary/Keyword: BIM building life cycle

Search Result 111, Processing Time 0.025 seconds

A Proposal of Life Cycle CO2 Assessment Techniques for Building in Construction Stage by BIM LOD (건설단계 BIM을 이용한 건축물의 전 과정 CO2 평가 기법 제안에 관한 연구)

  • Bang, Jun-Sik;Tae, Sung-Ho;Roh, Seung-Jun;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.53-54
    • /
    • 2012
  • This study is aimed at utilizing LCA processor with BIM LOD, eliciting the problems of the existing environmental assessment by constructing the database for environmental values of green buildings. For these objects, environmental load database of BIM construction material and evaluation process are presented, after matching BIM family based environmental load database which is available during evaluation stage, input-output tables and Korea LCI database to standard item code of public procurement service. It is a important factor in environmental assessment of building to develop database unit of standard item code for BIM and construction material. Thus, the results of this study are expected to provide basic data for improving effectiveness of construction through BIM based environmental load evaluation database. Furthermore, the provided environmental load database unit for construction material is considered to be available as basic information for BIM study by suggesting a processor connecting BIM with LCA and along with this, continuous examination on the connection process is needed.

  • PDF

DEVELOPMENT OF ARCHITECTURAL DESIGN QUALITY CONTROL REQUIREMENTS BASED ON OPEN BIM

  • Inhan Kim;Jungsik Choi;Junho Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.426-432
    • /
    • 2013
  • The construction industry consists of various and massive architectural information as an architectural process includes a variety of design stages with cooperation of many disciplines. Particularly, architectural information is generated and managed through the life cycle of a building, from conceptual design stage to the construction and maintenance. A Building Information Model (BIM) serves as a shared knowledge resource for information about a facility forming a reliable basis for decisions during its life-cycle from inception onward. BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM based project. Particularly, requirement is very important for architectural design evaluations. The purpose of this study is to develop and apply of quality control requirement for improving the quality of architectural design in open BIM environments. To achieve this purpose, the authors have investigated case study for open BIM data quality control (software, guideline and application case) and classified quality control targets according to physical/logical quality and data quality. In addition, the authors have defined open BIM based quality control process and developed quality control requirements. Finally, the authors have developed rule based quality check system using requirements for efficient quality control based on open BIM.

  • PDF

A Development of BIM Planning Framework for BIM Based Collaboration (BIM 기반 협업을 위한 BIM Planning 체계 개발 - 가상건설 연구단의 CPLM 시스템 중심으로)

  • Yoon, Su-Won;Kim, Seong-Ah;Chin, Sang-Yoon;Choi, Cheo-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.369-374
    • /
    • 2010
  • 최근 건설 산업에서 BIM이 각광 받으면서, BIM 기반의 다양한 엔지니어링 기술 도입 및 프로세스 적용이 시도 되고 있다. 이중 BIM 기반의 프로젝트 운영을 위해서는 BIM의 데이터의 저장, 수정, 배포뿐만 아니라, 관련 주체간의 협업이 가능한 환경이 요구되고 있으며, 이러한 환경 구축을 위해 제조업에서 활용되고 있는 PDM(Project Data Management) 또는 PLM (Product Life-cycle Management) 시스템을 벤치마킹한 CPLM (Construction Project Life-cycle Management)과 같은 BIM 기반 협업 시스템이 등장하고 있다. 하지만 기존의 이러한 협업 시스템의 경우, 건설 프로젝트가 가지는 다양한 계약 방식, 관리 단계, 관련 정보의 체계 등에 대한 종합적 계획 없이 프로젝트의 각 참여 주체들의 기존 관리 방식을 도입함으로써, 당초 BIM 기술을 도입하여 달성하고자 하는 원활한 협업 환경을 구축하는데 한계를 가지고 있다. 따라서 본 연구에서는 최근 BIM 가이드라인의 도입 등에서 시도되고 있는 BIM Planning이라는 개념을 활용하여, BIM 기반 협업 시스템의 구축 이전에 BIM을 관리하기 위한 관리 구조, 방식, 데이터 체계 등을 효과적으로 계획하고, 이를 시스템에 반영시킴으로써 보다 효과적인 BIM 기반 협업 환경이 구축될 수 있는 체계를 제안하였다.

  • PDF

Bim-based Life Cycle Assessment of Embodied Energy and Environmental Impacts of High-rise Buildings: A Literature Review

  • Lijian Ma
    • International Journal of High-Rise Buildings
    • /
    • v.12 no.2
    • /
    • pp.163-168
    • /
    • 2023
  • Today 55 percent of the population in the world lives in urban areas which is expected to increase to 68 percent by the year 2050. In the cities, high-rise buildings as symbols of the modern cityscape are dominating the skylines, but the data to demonstrate their embodied energy and environmental impacts are scarce, compared to low- or mid-rise buildings. Reducing the embodied energy and environmental impacts of buildings is critical as about 42 percent of primary energy use and 39 percent of the global greenhouse gas (GHG) emissions come from the building sector. However, it is an overlooked area in embodied energy and environmental impacts of high-rise buildings. Life cycle assessment (LCA) is a widely used tool to quantify the embodied energy and environmental impacts of the building sector. LCA combined with Building Information Modeling (BIM) can simplify data acquisition of the building as well as provide both tools with feedback. Several studies recognize that the integration of BIM and LCA can simplify data acquisition of the building as well as provide tools with feedback. This article provides an overview of literature on BIM-based of embodied energy and environmental impacts of high-rise buildings. It also compares with different LCA methodologies. Finally, major strategies to reduce embodied energy and environmental impacts of high-rise buildings, research limitations and trends in the field are covered.

The Necessity of Development of BIM-Based Object Library for the Improvement of Effectiveness in Maintenance Work (유지관리 업무 효율성 향상을 위한 BIM기반 유지관리 시설물 객체 라이브러리 구축 개발의 필요성)

  • Kim, Ka-Ram;Lim, Chul-Woo;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.231-234
    • /
    • 2010
  • Recently, the construction industry has been changed more highly and complicacy. According to this, several informational systems of maintenance are introduced suitable the work and the purpose of each maintenance. However there are some problems in the manage the information of maintenance management by without the standization and systematic management of variable information from building life-cycle. This paper purposed the process of creation or management of information which is used for present maintenance through IFC-based facilities object library development is suggested for work efficiency of maintenance management. In addition, it can minimize the reproduce the same information unnecessarily. Fainally, it makes information compatibility through the building life-cycle highly by define the IFC-based object information and standardize the format of information.

  • PDF

Application of BIM-based PMIS Considering Construction Life-Cycle (건설 생애주기를 고려한 BIM 기반의 PMIS 활용)

  • Moon, Sung-Woo;Kwon, Ki-Nam;Kim, Sang-Do;Jung, Joon-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.654-657
    • /
    • 2008
  • Recently, construction projects have become bigger and complicated and the construction business scale has enlarged. Therefore a project cost size is increasing. The historical data can be easily saved by advanced technologies of IT industries. Utilizing those make us to be able to manage construction project more effectively. These days, PMIS (Project Management Information System) has supplied widely at construction companies for integrating cooperation system of Web environment. and it is being used. However the most PMIS is limited at construction phase. Actually it isn't applied to a construction project Life-Cycle(planning, design, construction and maintenance). To control manage a construction project Life-Cycle effectively, BPMS (BIM-based PMIS Modeling) should be considered. This paper suggests the ways for applying BPMS.

  • PDF

The construction management of BIM-based small building remodeling. (BIM 적용을 통한 소규모 건물 리모델링 시 현장시공관리)

  • Jung, Tae-Ho;Kim, Sang-Won;Park, Seung-Hwan;Hong, Seong-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.191-192
    • /
    • 2012
  • The BIM(Building Information Modeling) introduction of the construction and maintenance at the design phase through the life cycle of the building until it is destroyed, I will bring big changes in the process. If you are building a small action by a variety of variables difficult to manage on-site construction, but, BIM remodeling of the building by applying a small improvement in the quality of imported building and construction delays, such as design changes or re-construction by removing the elements of economic 04 to make. Since the early stages of applying BIM to complement the introduction part, but the future seems to lead to changes in the built environment, academics and practitioners of the construction industry seem to have an active research.

  • PDF

A development of a checklist to check the consistency of BIM and drawings at the construction documentation phase (실시설계단계 BIM과 도면의 정합성 검토를 위한 체크리스트 개발)

  • Kim, Byeong-Ju;Kim, Yi-Je;Chin, Sang-Yoon
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.33-42
    • /
    • 2018
  • The consistency between a building information model(BIM) and drawings are very important and has a critical impact on the usage of BIM throughout the project life-cycle. The purpose of this study is to develop a checklist for the consistency check between BIM and drawings. In this research, requirements for drawings in the construction documentation phase were analyzed. In generating drawings based on BIM, a checklist can help practitioners confirm what to modify in the BIM model and what to modify in CAD drawings. Finally, it is expected that the work efficiency will be improved by reducing the unnecessary work by distinguishing the elements that can be extracted from the BIM model from the elements that requires additional works when generating BIM-based drawings.

Georeferencing for BIM and GIS Integration Using Building Boundary Polygon (BIM과 GIS 통합을 위한 건물 외곽 폴리곤 기반 Georeferencing)

  • Jwa, Yoon-Seok;Lee, Hyun-Ah;Kim, Min-Su;Choi, Jung-Sik
    • Journal of KIBIM
    • /
    • v.13 no.3
    • /
    • pp.30-38
    • /
    • 2023
  • Building Information Models(BIM) provides rich geometric and attribute information throughout the entire life cycle of a building and infrastructure object, while Geographic Information System(GIS) enables the detail analysis of urban issues based on the geo-spatial information in support of decision-making. The Integration of BIM and GIS data makes it possible to create a digital twin of the land in order to effectively manage smart cities. In the perspective of integrating BIM data into GIS systems, this study performs literature reviews on georeferencing techniques and identifies limitations in carrying out the georeferencing process using attribute information associated with absolute coordinates probided by Industry Foundation Classes(IFC) as a BIM standard. To address these limitations, an automated georeferencing process is proposed as a pilot study to position a IFC model with the Local Coordinate System(LCS) in GIS environments with the Reference Coordinate System(RCS). An evaluation of the proposed approach over a BIM model demonstrates that the proposed method is expected to be a great help for automatically georeferencing complex BIM models in a GIS environment, and thus provides benefits for efficient and reliable BIM and GIS integration in practice.

A Study on the Improvement of Interoperability Construction Process (BIM 건설정보 상호운용성 개선에 관한 연구)

  • Oh, Jeong-Keun;Ha, Ran
    • Journal of KIBIM
    • /
    • v.4 no.2
    • /
    • pp.10-16
    • /
    • 2014
  • Interoperability in the BIM construction information is the information management technology, which allows user to control and effectively use construction's lots of information that occur and disappear through construction life cycle. And it is information interchange through accurate and rapid decision-making to get the participants' wanted value. In this study, we will present plan to improve productivity and quality through effective BIM operation. And we will present improvement plan after deduce existing process's problem.