• 제목/요약/키워드: BIM based information Management

검색결과 347건 처리시간 0.024초

클라우드 컴퓨팅 기반 항만 BIM 서비스를 위한 브라우저 설계 (Design of Browser for The Harbor BIM Service Based on Cloud Computing)

  • 장재열;문현석
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.60-71
    • /
    • 2018
  • The port BIM technology has many problems such as lack of relevant system, high cost of BIM infrastructure construction, and process difference of existing domestic inter-industry. Since the port facilities as national key industries are managed and operated by public organizations, it is necessary to integrate IT resources and have a system that needs collective construction and joint utilization management. In this paper, we proposed the convergence of cloud computing technology and BIM as a way to reduce the infrastructure cost required for port BIM operation and to provide various BIM services for domestic process. To do this, we collected system requirements based on demand surveys of port staff and designed a BIM browser that provides IFC-based BIM server and customized services to reduce infrastructure cost in cloud computing environment. In terms of infrastructure, we designed cloud-based IaaS to support cost reduction, which is an essential component, and designed SaaS to support customized services in terms of services. We will perform performance verification with focus on whether port BIM servers and browsers have reached a level where they can manage four BIM models with different types and capacities.

철도인프라 BIM 성과관리를 위한 업무 및 성과기록 표준 템플릿 개발 (Development of Business and Performance Record Standard Template for Rail Infrastructure BIM Performance Management)

  • 신민호;김환용;최영우;한상천
    • 한국BIM학회 논문집
    • /
    • 제10권4호
    • /
    • pp.50-59
    • /
    • 2020
  • Recently, the government has actively promoted the introduction of BIM at the national level to improve the efficiency and productivity of the construction industry, and private interest in the application of BIM has also increased. However, despite the large amount of references and information, not much research has been done in quantitative ways to accurately measure the performance of BIM projects. The purpose of this study is to review performance measurement cases using ROI, investment effect analysis, and queue model analysis using domestic and overseas BIM guideline research and to present standard templates that can quantitatively measure BIM performance records according to domestic conditions based on this. Performance measurement trends and cases according to the application of BIM were analyzed, and nine quantification elements were derived from this, and based on this, a performance measurement data collection template at the BIM life cycle stage was prepared. Detailed items and contents were prepared for the nine quantification elements, and the final template consisted of a total of 43 questions, divided into the entire stage (15), the beginning (8), the middle (8), and the latter (12) areas. It is expected that by using the standard template of railway BIM performance records developed in this study, the BIM design stage will be diagnosed and the deficiencies will be supplemented, which will be the basic data for measuring actual quantitative performance in all life cycle performance of future BIM projects.

MODEL-BASED LIFE CYCLE COST AND ASSESSMENT TOOL FOR SUSTAINABLE BUILDING DESIGN DECISION

  • Iris X. Han;W. Zhou;Llewellyn C.M. Tang
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.311-317
    • /
    • 2011
  • There is a growing concern in reducing greenhouse gas emissions all over the world. The U.K. has set 34% target reduction of emission before 2020 and 80% before 2050 compared to 1990 recently in Post Copenhagen Report on Climate Change. In practise, Life Cycle Cost (LCC) and Life Cycle Assessment (LCA) tools have been introduced to construction industry in order to achieve this such as. However, there is clear a disconnection between costs and environmental impacts over the life cycle of a built asset when using these two tools. Besides, the changes in Information and Communication Technologies (ICTs) lead to a change in the way information is represented, in particular, information is being fed more easily and distributed more quickly to different stakeholders by the use of tool such as the Building Information Modelling (BIM), with little consideration on incorporating LCC and LCA and their maximised usage within the BIM environment. The aim of this paper is to propose the development of a model-based LCC and LCA tool in order to provide sustainable building design decisions for clients, architects and quantity surveyors, by then an optimal investment decision can be made by studying the trade-off between costs and environmental impacts. An application framework is also proposed finally as the future work that shows how the proposed model can be incorporated into the BIM environment in practise.

  • PDF

교량의 유지관리를 위한 BIM기반 자산관리 모델 개발에 관한 연구 (A Study on Development of BIM-based Asset Management Model for Maintenance of the Bridge)

  • 강종민;이동열;박종범;이민재
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.3-11
    • /
    • 2012
  • 국내 교량의 사용 수명은 대부분 30년 미만으로 향후 유지보수에 투입되어야하는 예산이 증대될 것으로 예측할 수 있다. 그러나 교량에 투입할 수 있는 예산은 한정되어 있기 때문에 효과적인 예산 투입을 통한 교량의 요구 성능 달성을 목표로 수행되고 있는 자산관리에 대한 필요성이 증대되고 있다. 교량의 효과적인 자산관리를 수행하기 위해서는 건설사업 수행 전 단계에서 발생하는 정보들을 효과적으로 활용해야한다. 따라서 효과적인 정보관리를 통해 자산관리를 지원할 수 있는 시스템과 DB의 구축이 요구된다. 본 연구에서는 현재 건설사업의 정보관리에 활용되고 있는 BIM을 활용하여 교량의 유지관리에 적용할 수 있는 BIM기반 교량 자산관리모델 개발을 목표로 설정하였으며, 선행연구조사를 통한 BIM 기능 및 자산관리 세부구성항목 도출을 수행하고 상호간의 연계성을 고찰하였다. 이를 기반으로 구축된 자산관리 모델은 유지보수 대안별 소요예산과 정체시간을 산정하는 모델로 구성하였다. 또한 구축된 BIM기반 교량 자산관리 모델의 타당성 및 적용성 검증을 위해 사례연구를 수행한 결과, 본 연구에서 제안된 BIM기반 교량 자산관리모델은 현행 교량 유지관리 업무절차에 적용이 가능한 모델로써 한정된 예산 내에서 효율적인 교량 유지관리 업무를 지원할 수 있을 것으로 사료된다.

건축설계 성과물 품질향상을 위한 BIM활용에 관한 연구 (A Study on the Application of BIM for Improving the Quality of Architectural Design)

  • 정수진;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.35-36
    • /
    • 2012
  • BIM technology accomplished quantitative development being utilized in various disciplines. However, it is necessary to develop environment and requirement for qualitative improvement of BIM-based project in current transitional period of adopting BIM. The purpose of this study is to develop and apply of quality control requirement for improving the quality of BIM-based architectural design through case study. In particular, by focusing on BIM quality control and its relevant subjects, the minimum standards for BIM quality management are suggested. Also, BIM template is suggested to support the effective application of BIM-based architectural design.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF

BIM기반 상호적 유지관리 시스템 개념 제안 (A Study on Interactive Centered Apartment Maintenance System Based on BIM)

  • 송아름;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.232-233
    • /
    • 2015
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user and administrator viewpoint.

  • PDF

공동주택 이용자 중심의 BIM기반 유지관리 개선제안 (A Study on User Centered Apartment Maintenance System Based on BIM)

  • 송아름;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.240-241
    • /
    • 2013
  • The maintenance management in buildings has got more important by the increasing complexity of building sizes and use. Nowadays an expectation and a possibility of BIM technology become accepted as a new construction management method, therefore many studies and legal systems of it are being suggested actively. Although orders for BIM projects are supposed to be increasing, at present the BIM information accumulated from planning and design still doesn't have its continuity at the maintenance step after completion of construction in terms of LCC. Therefore according to bim information, we set a goal of developing apartment maintenance system which is able to maintain by user viewpoint.

  • PDF

한국과 중국의 BIM 수용영향요인 비교분석 (Comparative Analysis of BIM Acceptance Factors between Korea and China)

  • 송경욱;이슬기;유정호
    • 한국건설관리학회논문집
    • /
    • 제22권6호
    • /
    • pp.3-14
    • /
    • 2021
  • 중국건설업에서는 BIM (Building Information Modeling)의 활용을 통해 건설업의 비효율적인 상호운용성의 문제를 해결하여 건설업의 총생산액 증가시키고자 한다. 하지만 중국 주건부에서 2011년부터 건설업의 BIM활용을 촉진하였음에도 불구하고 중국에서는 BIM 활용률은 45% 미만인 것으로 나타났다. 한편 한국 건설업은 중국보다 먼저 BIM 도입을 하여 활용하고 있는 만큼, BIM 활용수준과 BIM 수용의지가 중국보다 높을 것으로 예상된다. 따라서 본 연구에서는 한국과 중국의 BIM수용영향요인 비교분석을 통해 중국의 BIM 활용률을 향상시킬 수 있는 방안을 제안하고자 한다. 한국과 중국의 BIM수용영향요인 비교분석을 위해 기술수용이론(Technology Acceptance Model; TAM)과 BIM 수용모델 관련 선행연구고찰을 통해 BIM 수용영향요인을 분류하고, 중국의 국가적 특성과 중국건설업만이 가진 특성을 반영한 BIM 수용영향요인을 추가하여 실제 BIM 사용자인 한국과 중국 건설사업 참여주체(시공사, 설계사, CM)를 대상으로 설문조사를 실시하였으며, 통계값을 유의미한 차이를 알아보기 위해 SPSS 22.00을 활용하여 t-test 실시하였다. 마지막으로 t-test 결과를 기반으로 중국의 BIM 활용률을 향상시킬 수 있는 개선방안을 제안하였다. 본 연구의 결과를 통해 중국 건설업에 적합한 BIM 활용 활성화 방향을 제시하고, 중국 건설업의 BIM 활용 활성화 연구의 이론적 기초를 제공할 수 있을 것으로 기대한다.

A Conversion Process to IFC Files for Integrated Use of Open and Web-based BIM Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Hwang, Hee-Suk
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권10호
    • /
    • pp.11-23
    • /
    • 2019
  • 본 연구에서는 토목분야의 다양한 상용 BIM 모델링 설계 소프트웨어의 사용자들에게 상호 호환성과 상호 운용성을 보장하기 위해 BIM 국제 표준 파일 포맷인 IFC 파일로의 파일 변환 프로세스를 새롭게 설계하여 제시한다. 제안된 프로세스는 상용 BIM 모델링 소프트웨어를 위한 add-in 방식의 컨버터(Converter)를 사용하여, 변환되는 IFC 파일의 3차원 객체 형상 정보에 수량 산출식 코드 속성과 토목 분야 CBS/OBS/WBS 표준분류체계 속성으로 구성되는 추가적인 속성들을 삽입한다. 또한, 개방형(Open) 웹 기반 수량, 공정(4D) 및 공사비(5D) 관리를 위한 IFC 파일의 통합 활용 프로세스를 추가로 설계하고 구축한다. 이러한 작업을 통해 토목 분야의 BIM 모델링 설계 단계에서 최종적인 시공 단계에 이르는 개방형 웹 기반 수량, 공정(4D) 및 공사비(5D)의 연계적 활용에 대한 새로운 프로세스를 제시하는 것이 본 연구의 궁극적인 목적이다.