Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project- (건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로-)

  • Kim, Hyeon-Seung;Moon, Hyoun-Seok;Choi, Gwang-Yeol;Kim, Chang-Hak;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.2
    • /
    • pp.11-24
    • /
    • 2012
  • Recently, BIM (Building Information Modeling) technique is being considered as a critical delivery condition for the public projects according to the increase of best practices by practical application of BIM. However, since existing BIM studies are focused on the design and construction phases, those results are not considering the life cycle of a construction project. Therefore, this study suggests an integrated BIM operation process that enables an application of BIM for each phase of a construction project from planning to maintenance phases and develops an integrated BIM system based on the suggested methodologies. This study developed basic BIM functions and its application process by analyzing information systems in each project phase for a bridge construction project. Besides, this study performed case study and survey analysis for construction managers to verify a practical applicability of the developed system. Therefore, it is expected that the integrated BIM system is going to be utilized as a 3D-based integrated information management system considering life cycle of construction projects.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

Development of the Spatial Indexing Method for the Effective Visualization of BIM data based on GIS (GIS 기반 BIM 데이터의 효과적 가시화를 위한 공간인덱싱 기법 개발)

  • Kim, Ji-Eun;Kang, Tae-Wook;Hong, Chang-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.8
    • /
    • pp.5333-5341
    • /
    • 2014
  • Recently, with the increasing interest in facility management based on indoor spatial information, various studies have been attempted to manage facility conversion between BIM and GIS. Visualization of the geometry data for a large-scale is one of the major issues to the maintenance system. Therefore, this study designed the spatial indexing algorithm through an IFC schema-based scenario for the effective visualization of BIM data based on GIS. A part of the algorithm was developed implementing the OcTree structure and this research has a test for the developed output with IFC sample data. Ultimately, we propose the spatial indexing method for the effective visualization of BIM data based on GIS.

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

A Study on BIM-based Facility Management System Architecture Development considering the heterogeneous solution data integration (BIM과 이기종 솔류션 데이터 통합을 고려한 시설물관리 시스템 아키텍처 개발에 관한 연구)

  • Kang, Tae Wook;Choi, Hyun Sang
    • Spatial Information Research
    • /
    • v.21 no.4
    • /
    • pp.25-34
    • /
    • 2013
  • The purpose of this study is to develop an efficient BIM-based FM(Facility Management) system architecture to integrate the heterogeneous solution data related to FM. The heterogeneous solution data can be an FM system, asset management system, or facility sensor database systems, as well as files created by a modeler. In this study, we define the consideration for the external heterogeneous data integration related to BIM-based FM and propose the methodology. To implement it, trends in related studies were reviewed and general use cases of BIM-based FM were derived to develop the architecture for the integration between BIM and the heterogeneous solution data. The component architecture was designed to implement the use cases, and the schema was developed for the prototype by using the proposed architecture.

BIM based Design of Steel Box Girder (STEEL BOX 교량 상부구조의 BIM기반 설계)

  • Lee, Jin-Kyoung;Lee, Heon-Min;You, Jae-Myoung;Shin, Hyun-Mock
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.6-11
    • /
    • 2011
  • In domestic construction industry, there is lack of the communication between planning, design, construction and maintenance. This problem makes the omission of information and the loss of cost. Therefore, the introduction of BIM can be a solution about that. BIM manages all information generated during all life-cycle of a structure and consequently maximizes the efficiency of utilizing information. This is done through 3D information model associated with a three-dimensional(3D) parametric CAD. This study proposes the design process of steel box bridge for structural design work of bridge construction project based on BIM. This process has 3D modeling progress done by using the information decided in design phase. When the subject for the proposed process is superstructure of steel box bridge in construction, the structural calculation sheet can be derived with the structural design process based on BIM.

A Method for Information Management of Defects in Bridge Superstructure Using BIM-COBie (BIM-COBie를 활용한 교량 상부구조의 손상정보 관리 방법)

  • Lee, Sangho;Lee, Jung-Bin;Tak, Ho-Kyun;Lee, Sang-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • The data management and the evaluation of defects in the bridge are generally conducted based on inspection and diagnosis data, including the exterior damage map and defect quantity table prepared by periodic inspection. Since most of these data are written in 2D-based documents and are difficult to digitize in a standardized manner, it is challenging to utilize them beyond the defined functionality. This study proposed methods to efficiently build a BIM (Building Information Modeling)-based bridge damage model from raw data of inspection report and to manage and utilize the damage information linking to bridge model through the spread sheet data generated by COBie (Construction Operations Building Information Exchange). In addition, a method to conduct the condition assessment of defects in bridge was proposed based on an automatic evaluation process using digitized bridge member and damage information. The proposed methods were tested using superstructure of PSC-I girder concrete bridge, and the efficiency and effectiveness of the methods were verified.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Creation of Crack BIM in Bridge Deck and Development of BIM-FEM Interoperability Algorithm (교량 바닥판의 균열 BIM 생성 및 BIM-FEM 상호 연계 알고리즘 개발)

  • Yang, Dahyeon;Lee, Min-Jin;An, Hyojoon;Jung, Hyun-Jin;Lee, Jong-Han
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.689-693
    • /
    • 2023
  • Domestic bridges with a service life of more than 30 years are expected to account for approximately 54% of all bridges within the next 10 years. As bridges rapidly deteriorate, it is necessary to establish an appropriate maintenance plan. Recent domestic and international research have focused on the integration of BIM to digitize bridge maintenance information and then enhance accessibility and usability of the information. Accordingly, this study developed a BIM-FEM interoperability algorithm for bridge decks to convert maintenance information into data and efficiently manage the history of maintenance. After creating an initial crack BIM based on an exterior damage map, bridge specification and damage information were linked to a numerical analysis that performs damage analysis considering damage scenarios and design loads. The spread of cracks obtained from the analysis results were updated into the BIM. Based on the damage spread information on the BIM, an automated technology was also developed to assess both the current and future condition ratings of the bridge deck. This approach can enable an efficient maintenance of the deck using the history data from bridge inspection and diagnosis as well as future information on cracks and defects. The expected early detection and prevention would ultimately improve the lifespan and safety of bridges.

Derivation of System Requirements and Scenario for Smart Bridge Facility Management System Development (스마트 교량 관리시스템 개발을 위한 요구사항 및 활용 시나리오 도출)

  • Hong, Sungchul;Kang, Taewook;Hong, Changhee;Moon, Hyounseok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.11
    • /
    • pp.7902-7909
    • /
    • 2015
  • The needs for smart city management technology has been increased for efficiently managing huge and complex social infrastructures. Thus, this research introduces smart bridge facility management system based on sensor and BIM technologies so that the inadequacy of current facility maintenance system and the limitations of data objectivity, consistency and expandability can be improved. For which, current trends on sensor and BIM technologies and standard information system were investigated to derive system develop requirements, and a scenario was suggested to discuss how to utilize the suggested system. Research outcomes are expected to be utilized as a preliminary research for developing the real application framework for bridge facility management.