• Title/Summary/Keyword: Automatic Construction System

Search Result 507, Processing Time 0.027 seconds

Development of an Optimal Trajectory Planning Algorithm for an Automated Pavement Crack Sealer

  • Yoo, Hyun-Seok;Kim, Young-Suk
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.35-44
    • /
    • 2012
  • In the last two decades, several tele-operated and machine-vision-assisted systems have been developed in the construction and maintenance area, such as pavement crack sealing, sewer pipe rehabilitation, and excavation. In developing such tele-operated and machine-vision-assisted systems, trajectory plans are very important tasks for the optimal motions of robots whether their environments are structured or unstructured. This paper presents an optimal trajectory planning algorithm used for a machine-vision-assisted automatic pavement crack sealing system. In this paper, the performance of the proposed optimal trajectory planning algorithm is compared with the greedy trajectory plans, which are used in the previously developed pavement crack sealing systems. The comparison is based on the computational cost vs. the overall gains in crack sealing efficiency. Finally, it is concluded that the proposed algorithm plays an important role in the productivity improvement of the developed automatic pavement crack sealing system.

The developing direction of korean gas pressure welding machine (철근 가스압접공법 활성화를 위한 한국형 철근자동가스압접기 기술개발방향)

  • Seo, Deok-Seok;Song, Ki-Jun;Hwang, Kee-Tae;You, Beong-Taek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.131-138
    • /
    • 2005
  • The study is focused on the settling the developing direction of korean gas pressure welding machine which can be applied in korean construction sites with moderate and high performance. Gas pressure welding is more economical and has good performances than other steel bar jointing methods, as arc welding and mechanical joint etc. Therefore in Japan, the gas pressure welding, which has less loss of steel bars and low performance of joints, when connecting the D29 and thicker steel bars, Is one of the typical connection of steel reinforcement. But in Korea, the gas pressure welding method is not widely used caused by the shortage of skilled workers, and this situation in Korea can not be solved in short period. The training of the skilled workers takes long period(around $6\~10$ years), and there is no certification system for gas pressure welding. So to activate the gas pressure welding in Korea, the development of the automatic gas pressure welding machine is necessary, which gives regular performance of the steel bar joints and can be operated by not sufficient skilled workers. The automatic gas pressure welding machine was developed in Japan, but this machine has many problems when applied in korean construction sites. Therefore, it is necessary to develop a korean automatic gas pressure welding machine to overcome this problems. To develop korean automatic gas pressure welding machine, the problems, which shows when applied in korean construction sites, need to be investigated. According to the investigation, counterproposals are presented for the pragmatical development of the korean automatic gas pressure welding machine.

A Basic Study on Review the Classification System and the Process of BIM Information for an Automatic Review of Building Code (건축법규 자동검토를 위한 BIM정보의 분류체계 검토 및 프로세스에 관한 기초연구)

  • Lee, Chang-Yoon;Shim, Un-Jun;Ahn, Yong-Sun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.45-52
    • /
    • 2012
  • Recently, BIM is used at several areas actively because of introduction of BIM in the construction industry. In particular, the recent many studies on activation of BIM information sharing is underway and it is the future direction of BIM. Moreover, it should be clearly realized. In the BIM levels of domestic construction phase, Interference Review, calculating volume estimates in part based on the active research is underway. However, still interested in reviewing building codes have relatively little interest. As BIM enabled, The methods of reviewing building codes should be transformed into a automated system by using information of BIM. In overseas, they are already using diverse softwares for reviewing modeling. Thus, For an automatic review of building regulations research is needed. this study is research on the development Domestic building codes as an automatic review process by using BIM. In order to Automatic review of the current building regulations by using BIM, this study analyzes the characteristics of each piece of information.

Knowledge-Based Approach for Computer-Aided Simulation Modeling (컴퓨터에 의해 수행되어지는 시뮬레이션 모델링을 위한 지식베이스 접근방법)

  • Lee, Young-Hae;Kim, Nam-Young
    • IE interfaces
    • /
    • v.2 no.2
    • /
    • pp.51-62
    • /
    • 1989
  • A computer-aided simulation modeling system has been developed to allow the automatic construction of complete discrete simulation models for queueing systems. Three types of knowledge are used in the specification and construction of a simulation modeling: Knowledge of queueing system, simulation modeling, and a target simulation language. This knowledge has been incorporated into the underlying rule base in the form of extraction and construction rule, and implemented via the expert system building tool, OPS5. This paper suggested a knowledge based approach for automatic programming to enable a user who lacks modeling knowledge and simulation language expertize to quickly build executable models.

  • PDF

A Study on the Development of an Automated Freeform Fabrication System and Construction Materials (자동화 적층 시공 시스템 및 재료 개발에 관한 연구)

  • Jeon, Kwang Hyun;Park, Min-Beom;Kang, Min-Kyung;Kim, Jung-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1665-1673
    • /
    • 2013
  • Recently, the interest and demand on free formed structure providing aesthetic value as well as functionality has been increasing. Formwork has numerous advantages such as high strength, convenience, accuracy and good quality of surface roughness. Nevertheless, it increases construction cost and period to build complex shapes. For these purpose, deposition construction systems such as Contour Crafting and Concrete Printing have been developed with active collaboration between university and industry by applying the rapid prototyping technology to the construction industry in USA and England. Since there has been no related research in Korea, the possibility of spin-off technology and its fusion cannot be expected. In this paper, design elements including mechanical system and control system related to automatic deposition construction system prototype for constructing a free curved structure without mold are described. As for an appropriate material for the system, fiber reinforced mortar was selected by experiments on compressive strength, fluidity, viscosity and setting time. By performing transfer and extrusion experiments, the possibility of the development of deposition construction system was demonstrated. Based on this research results, it is required to keep the automatic deposition construction system improve and extend it into the new application area in construction industry.

A study on the automatic control technique of the microtunneling system by fuzzy logic (퍼지 로직을 이용한 터널 굴진기의 자동화 연구)

  • Han, Jeong-Su;Do, Jun-Hyeong;Bien, Zeungnam;Nam, Jang-Hyun;Park, Tae-Dong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.3
    • /
    • pp.269-278
    • /
    • 2003
  • Microtunneling techniques play a crucial role in the construction of pipelines. In this paper shows the automatic tunneling algorithm of microtunneling system by using fuzzy logic technology to assist operators assuring the quality of microtunneling construction. To have effective output value of fuzzy controller, we slightly modified the conventional defuzzificaton methods. The proposed automatic tunneling algorithm shows good tunneling results comparable with those of experts.

  • PDF

Development of an Imaging Based Gang Protection System

  • Grimm, M.;Pelz, M.
    • International Journal of Railway
    • /
    • v.1 no.4
    • /
    • pp.149-156
    • /
    • 2008
  • During maintenance or construction works in or at the tracks of railways, high risks for passengers and railway staff, especially for the workers on the construction site exist. The high risks result out of the movement of rail vehicles, like trains or construction vehicles, which must be faced by using any available technical and operational technologies for securing them against the environment. Therefore, it is necessary to evaluate the level of protection continuously and to identify new and innovative methods and technologies for the protection of the gang (construction worker, machines and material). Especially on construction sites at line sections with two or more parallel tracks but also with single tracks, there are still a lot of incidents and accidents mostly with seriously injured persons or fatalities. These were mainly gang members that breach the railway-loading gage. By using proper warning or protection systems, the avoidance of such accidents must be achieved. The latest developments. in gang protection systems concern on the one hand fixed barriers in the middle between the construction site and the operated track and on the other hand construction vehicles equipped with automatic warning systems. The disadvantage of such protection methods is that the gang can be warned against an approaching train but a monitoring of the gang members cannot be performed. Only one part of a potential dangerous situation will be detected. If the gang members will overhear the acoustic warning signal of the security staff and the workers will not leave the danger zone in the track, the driver of the approaching train had no chance to react to the dangerous situation. An accident is often inevitable. While the detection of acoustic warning signals by the gang members working on a construction site is very difficult, the acoustical planning of an automatic warning system has to be designed for an acoustic short range level of one meter besides the construction vehicle. The decision about the use of today's technical warning system (fixed systems, automatic warning systems, etc.) must be geared to the technical feasibility and the level of safety which is needed. Criteria for decision guidance to block a track should be developed by danger estimation and economical variables. To realize the actual jurisdiction and to minimize the hazards of railway operations by the use of construction vehicles near the tracks further developments are needed. This means, that the warning systems have to be enhanced to systems for protection, which monitor the realization of the warning signal as a precondition for giving a movement authority to a train. This method can protect against accidents caused by predictable wrongdoing. The actual state of the art technique of using a collective warning combined with additional security staff is no longer acceptable. Therefore, the Institute of Transportation System of the German Aerospace Center in Braunschweig (Germany) will develop a gang warning and protection system based upon imaging methods, with optical sensors such as video in visible and invisible ranges, radar, laser, and other. The advantage of such a system based on the possibility to monitor both the gang itself and the railway-loading gauge either of the parallel track or of the same track still in use. By monitoring both situations, the system will be able to generate a warning message for the approaching train, that there are obstacles in the track, so that the train can be stopped to prevent an accident. And also the gang workers will be warned, while they breach their area.

  • PDF

Test method for step-by-step construction of Autonomous station control system (자율분산 역 제어시스템 단계적 구축에 따른 테스트 방법)

  • Kim, Young-Hoon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1239-1243
    • /
    • 2007
  • Autonomous Station Control System is automatic route control system of large-scale station. The system has flexibility of system step-by-step construction and expandability. A method of step-by-step construction for Autonomous Station Control System has system expansion and subsystem software expansion. The system has autonomous controllability and autonomous coordinability for system step by step construction. With property for a basis, each of subsystem communicates data field. Also, Each subsystem has its own management system, Autonomous Data Manager to manage itself and coordinate with the others. This paper make clear test method for Autonomous Station Control System expansion and software expansion. The first test method of system increasing construction is single station construction test. The second of method is connecting test the neighbor's Autonomous Station Control System. The third of method is connecting test the Autonomous Line Management System. Also, the test method of software expansion take the case of route control subsystem.

  • PDF

A Study for Running Test Result of Train Automatic Driving Control by ATC/ATO/TWC System (차상 ATC/ATO/TWC 시스템의 열차 자동운전 구현의 현차시험 결과 고찰)

  • 강리택;이종성;김경식;박계서
    • Proceedings of the KSR Conference
    • /
    • 2000.11a
    • /
    • pp.578-585
    • /
    • 2000
  • ATC/ATO/TWC System is the used for the train operation instead of drivels. It is interfaced with train, train equipment, wayside facilities. In this paper described configuration signaling system, construction of signaling system software and structure of system safety. This paper describes the method of performing automatic driving by ATC/ATO/TWC. Also, reported test result for mainline static test and mainline running test.

  • PDF