• Title/Summary/Keyword: Application schedule

Search Result 398, Processing Time 0.034 seconds

A Study oil the Application of EVMS in Defense R&D Programs (국방연구개발 사업에 EVMS 적응방안 연구)

  • Choi Seok-Cheol;Kim Jong-Pil
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.8 no.1 s.20
    • /
    • pp.62-68
    • /
    • 2005
  • In this paper, we review the general technique of Earned Value Management System(EVMS) which is the integrated management for cost, schedule and performance, and suggest an application of the integrated management of cost and schedule in the research and development(R&D) programs for defense acquisition.

A Study on the Automation of the Pass Schedule Design in Shape Rolling (형상압연 공정설계의 자동화에 관한 연구)

  • 문호근;전만수;이진현;이성우
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1995.10a
    • /
    • pp.7-15
    • /
    • 1995
  • An application-oriented approach to automatic pass schedule design in shape rolling was presented in this paper. The design approach and its related program are composed of several modules for input data, graphic display, data processing, calculation of design information, drawing of detailed pass shapes, database management and finite element analysis for design verification. The developed program was applied to automatic pass schedule design for a square-to-round bar shape rolling.

  • PDF

Development of an Application Software for the Die-Production Information Management (금형 생산관리를 위한 응용 소프트웨어의 개발)

  • Kong, Myung-Dal;Kim, Jung-Ja
    • IE interfaces
    • /
    • v.9 no.2
    • /
    • pp.143-158
    • /
    • 1996
  • This paper deals with the development of a software module for production planning and scheduling activities of an actual die-production management system. Scheduling problems, such as master schedule and detailed schedule, are the focal point of the whole article and they are considered in terms of operation procedures. Schedule-explosion module and load levelling module are the essential components of schedule management. The scheduling module allocates the resources, determines the process priority and the planned start and completion dates of processes. Rescheduling can be done to manipulate unforeseen situations that schedule is delayed owing to inducing defectives, machine breakdowns and lumpy demands. This study indicates a practical model for the die-producation management and helps to apply it for jobs in the real situation.

  • PDF

A Study on Integration of Schedule Management and Risk Management (공정관리와 리스크관리의 통합을 위한 기초연구)

  • Jang, Myung-Houn;Youn, You-Sang;Suh, Sang-Wook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.105-110
    • /
    • 2006
  • It is more effective and more efficient to manage schedule and risk at a same time because many risks occur in construction phase in building construction projects. The objective of this paper is to propose a tool that manages risks in a project management software. The tool is implemented by VBA in Microsoft Project, and enables field managers of a construction project to make schedules and to help to predict risks.

  • PDF

Case Analysis on Application of Project Delay Analysis Method in Domestic Construction Project (국내 건설공사에서 공기지연 분석방법 적용 사례 분석)

  • Kim, Seon-Gyoo;Kwon, Soonwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.98-106
    • /
    • 2019
  • Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.

Speech Synthesis System for Detected Objects by Smart Phone (스마트폰으로 검출된 객체의 음성합성 시스템)

  • Kwon, Soon-Kak
    • Journal of Korea Multimedia Society
    • /
    • v.19 no.2
    • /
    • pp.469-478
    • /
    • 2016
  • This paper designs an application for detecting various objects using a smart phone with camera sensor, then implements the application that detects the number of faces in front of a user by using the Face API provided by android and generates a speech to the user. For implementing the application, the GoF strategy pattern is applied to design the application. It provides some advantages; first, the algorithm development schedule can separate the whole application development schedule; next, it makes easier to add the algorithm. For example, another detecting algorithm for the other objects (character, motion detection) that may be developed in the future, or it may be replaced by a more high-performance algorithm. With the propose method, a general smart phone can make some advantages that can provide information of various objects (such as moving people and objects, and detected character from signboards) to the person who is visually impaired.

Effect of Field Sanitation on the Pod and Stem Blight Caused by Phomopsis spp. in Soybean (포장위생 관리가 콩 미이라병의 발생에 미치는 영향)

  • 오정행
    • Korean Journal Plant Pathology
    • /
    • v.14 no.5
    • /
    • pp.526-530
    • /
    • 1998
  • The effect of field sanitation using ecological characters of the pathogen was investigated for controlling Phomopsis seed decay in soybean. Field sanitation which was eliminated the inoculum by removing host debris, abscised petioles and cotyledones out of field, reduced remarkably infection percentage of pods and seeds by Phomopsis spp. as compared to the inoculated field. Neverthless, seed infection was 28.7% in the sanitized field. The fields sanitized by benlate application around the soybean plants also decreased seed infection with Phomopsis spp. Total seed infection including that with miscellaneous pathogens occurred as much as 75∼79% to the no application and their control values were 34∼42% over the routine application schedule. Even though it was not satisfactory, field sanitation seemed to be effective in controlling Phomopsis seed decay when infection pressure was low level. Diaporthe phseolorum va. sojae, D. phaseolorum var. caulivora and Phomopsis longicolla were mostly identified from soybean seeds and Colletotrichum truncatum, Cercospora kikuchiana were also isolated in sequence. Field sanitation did not significantly increase in soybean yield over the no application, while routine application schedule did in field.

  • PDF

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.

Efficacy by Application Schedule of Fungicides before Harvest Stage for Control of Strawberry Powdery Mildew (딸기 흰가루병 방제를 위한 수확전 약제 처리 시기)

  • Nam, Myeong-Hyeon;Jung, Suck-Kee;Jang, Chang-Soon;Song, Jeong-Young;Kim, Hong-Gi
    • Research in Plant Disease
    • /
    • v.11 no.1
    • /
    • pp.39-42
    • /
    • 2005
  • Powdery mildew, caused by Sphaerotheca aphanis var. aphanis, is an economically significant disease of strawberry in Korea. When powdery mildew is not controlled adequately, it often spreads rapidly through strawberry plants and damage is associated with reduced yields. Proper timing of fungicide applications is, therefore, essential for effective disease control. This study evaluated the efficacy by application schedule of fungicides before harvest stage for preventing powdery mildew in 2001-2003. The systemic fungicides, azoxystrobin, kresoxim-methyl, and cupper fungicide DBEDC were applied preventively during the first part of the cultivating season. Preventative applications of DBEDC by dipping treatment before transplanting and kresoxim-methyl by foliar spray before blooming stage were one of the most effective control schedule tested to prevent and manage this disease. This research demonstrated the significance of application time to control of powdery mildew, particularly provided elimination unnecessary sprays of agrochemicals and reduction costs for strawberry growers.

THE ROOT CAUSE ANALYSIS PROCESS FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석 프로세스)

  • Ji, Kun-Chang;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.138-148
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity, and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay, and the range of analysis method of the cause structure of schedule delay has been multifarious from industrial views to views of specific work. Moreover, the classifying system and analysis method did not consider the trait, which cause the schedule delay, in constructing projects. For this reason, it is difficult to compare the cause of delay factors of the projects and to understand the effect of schedule delay by each factor. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.