• 제목/요약/키워드: Annual cost

검색결과 704건 처리시간 0.026초

여행비용접근법을 통한 대구 우방타워랜드의 편익가치 측정 (Estimation of Users대 Benefit Value for Woobang Tower Land in Taegu Using Travel Cost Method)

  • 김수봉;심애경;권기찬
    • 한국환경과학회지
    • /
    • 제10권3호
    • /
    • pp.173-178
    • /
    • 2001
  • The aim of this paper is to evaluate users benefit values of theme park using Travel Cost Method with special reference to Woobang Tower Land in Taegu for the estimation of economic values. This research is mainly based on questionnaire survey of 100 users of the theme park. Socio-economic factors such as income, year of education, annual income, age and money(travel cost) are analysed from 5 residential areas of the respondents. Multiple regression analysis was used for the evaluation of annual number of park visitings based on the analysis. The regression model shows NV = $\alpha$+$\beta_1$TC+$\beta_2$INC+$\beta_3$EDU+$\beta_4$AGE (NV : Annual Number of Visitings, TC : Travel Cost, INC : Annual Income, EDU : Years of Education, AGE : Age). Regarding to visitors demand curve based on the equation showed that annual economic values of Woobang Tower Land was estimated as 50billion Korean Won.

  • PDF

다단계 재고 시스템의 안전재고의 결정 (Determination of Safety Stock in a Multi-Echelon Inventory System)

  • 김정자;최규탁
    • 한국경영과학회지
    • /
    • 제15권1호
    • /
    • pp.63-72
    • /
    • 1990
  • This problem in this paper concerns the determination of safety stock for multi-echelon invenetory system. In this model the criterion is to minimize system safety stock subject to a service level constraint and expected annual total cost. Then, safety stock is determined by minimizing expected annual total cost and satisfying given service level. This expected annual total cost is obtained by expected total inventory holding cost plus the expected total stockout cost. Numerical example is given in a three-echelon inventory system. The results obtained by the use of the Hill Algorithm.

  • PDF

발사체 개발의 연차별 비용 추정을 위한 비용모델 개발 (Cost Model for Annual Cost Spread Estimation of Space Launch Vehicle Development)

  • 김홍래;유동서;최종권;장영근
    • 한국항공우주학회지
    • /
    • 제39권6호
    • /
    • pp.576-584
    • /
    • 2011
  • 성공적인 발사체 개발을 위해서는 개발비용을 정확하게 추정하는 것도 중요하지만 연차별 예산 배분을 적절히 계획하는 것도 중요하다. 본 논문에서는 통계적 기법을 이용하여 개발기간 중 연차별 예산 배분에 대하여 분석하였다. 연차별 비용 모델링을 위해서 통계적 모델의 분석을 통해 적합성을 판단하여 베타분포모델을 선택하였고, 프로젝트의 설계와 기술의 성숙도로 추정이 가능한 모델을 개발하였다. 연차별 비용 모델의 타당성을 검증하기 위하여 우주왕복선 주 엔진(Space Shuttle Main Engine)의 실제 개발비용 분포와 본 모델을 통한 개발비용 분포의 비교 연구를 통해 적합성을 확인하였다. 또한, 본 논문의 개발 비용 모델을 한국형발사체 개발에 적용하여 연차별 소요 비용을 추정하였다. 본 논문에서 제시하는 연차별 분포 모델은 발사체뿐만 아니라 다른 대형복합시스템의 개발에도 활용이 가능할 것으로 예상된다.

청소년 수련관의 열원설비 대안별 생애주기 비용에 관한 연구 (Analysis of Life Cycle Cost for Heat Source Equipments in Buildings for Adolescent Trainees)

  • 안창환;방승기;백용규
    • KIEAE Journal
    • /
    • 제5권3호
    • /
    • pp.25-31
    • /
    • 2005
  • Computer simulations were performed for Heating Ventilating and Air-Conditioning (HVAC) systems to figure out more efficient maintenance methods for the building used for adolescent trainees. This study aims at suggesting design alternatives for optimum operation and performing life cycle cost (LCC) for each alternative. First, the capacity of the heat source equipment was determined using annual maximum heating and cooling loads. Annual loads were calculated and applied to the alternative for the purpose of calculating annual energy cost. Second, several types of data were collected to predict energy cost. Finally, the pay back period for each alternative was calculated using total cost estimation during standard duration period. This study indicates that the absorption chiller that does not occupy most part of a mechanical room, and does not need much operation cost was most economical.

Optimal Replacement Scheduling of Water Pipelines

  • Ghobadi, Fatemeh;Kang, Doosun
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2021년도 학술발표회
    • /
    • pp.145-145
    • /
    • 2021
  • Water distribution networks (WDNs) are designed to satisfy water requirement of an urban community. One of the central issues in human history is providing sufficient quality and quantity of water through WDNs. A WDN consists of a great number of pipelines with different ages, lengths, materials, and sizes in varying degrees of deterioration. The available annual budget for rehabilitation of these infrastructures only covers part of the network; thus it is important to manage the limited budget in the most cost-effective manner. In this study, a novel pipe replacement scheduling approach is proposed in order to smooth the annual investment time series based on a life cycle cost assessment. The proposed approach is applied to a real WDN currently operating in South Korea. The proposed scheduling plan considers both the annual budget limitation and the optimum investment on pipes' useful life. A non-dominated sorting genetic algorithm is used to solve a multi-objective optimization problem. Three decision-making objectives, including the minimum imposed LCC of the network, the minimum standard deviation of annual cost, and the minimum average age of the network, are considered to find optimal pipe replacement planning over long-term time period. The results indicate that the proposed scheduling structure provides efficient and cost-effective rehabilitation management of water network with consistent annual budget.

  • PDF

컨테이너부두의 건설원가와 연간투자비 회수에 관한 연구 (A Study on the Calculation of Construction Costs and Their Annual Equivalent Recovery at PECT and GCT)

  • 이태우;임종길
    • 한국항만학회지
    • /
    • 제14권2호
    • /
    • pp.165-173
    • /
    • 2000
  • Major factors that are considered to determine lease charges of container terminals are, among others, construction cost of berth, discount rate, financing cost, and size of annual equivalent recovery. This paper aims to calculate construction costs at PECT and GCT and their annual equivalent recovery on the basis of historical data, and to identify whether or not the relationship of the above result and current lease charges at the two terminals are justifiable.

  • PDF

공동주택단지 난방시스템들에 대한 경제성 평가 (Economic evaluation on heating systems of apartment complex)

  • 조금남;윤승호;김원배
    • 설비공학논문집
    • /
    • 제10권6호
    • /
    • pp.773-783
    • /
    • 1998
  • The heating system for apartment complex may be classified as old systems including central system with steam boiler(S1), gas engine driven heat pump system(S2), system using waste heat(S3) and new systems including mechanical vapor re-compression system with flashing heat exchangers(S4), system using methanol(S5), system using metal hydride (S6). The purpose of the present study is to suggest optimal heating system by technically, economically and environmentally evaluating old and new heating systems of apartment complex from 500 to 3,000 households. Economic evaluation based on the technical evaluation results which estimated heat transfer area of heat exchangers and capacity of equipments was estimated initial investment cost, annual operating cost and relative payback period by considering annual increasing rates of energy cost and interest. Environmental evaluation provided annual generation rate of carbon dioxide. Initial investment cost was cheap in the order of S6, S5, S3, S2, S4, S1, annual operating cost was cheap in the order of S1, S2, S4, S5 and relative payback period was short in the order of S6, S5, S2, S3 and S4. Relative payback period was within 8 years for all scenarios of 3,000 households, and was increased as annual increasing rates of energy cost and interest were increased. As transportation pipe length was increased twice, payback period was increased by 1.4~2.6 time. The effect of temperatures of waste gas and waste water on the relative payback period was small within 0.8 years. The annual generation rate of carbon dioxide was big in the order of S4, S2 and S1. S4 was the most economic system among whole scenarios when S1 was replaced with other scenarios.

  • PDF

사업비 변동에 따른 공정계획 재수립을 위한 능동형 5D CAD 시스템 개발 (Development of Active 5D CAD System for Replaning Progress Schedule According to Change of Project Cost)

  • 김현승;강인석
    • 한국건설관리학회논문집
    • /
    • 제17권5호
    • /
    • pp.54-61
    • /
    • 2016
  • 건설프로젝트에서는 초기에 계획된 년차별 사업비가 공사 수행과정에서 빈번히 조정된다. 년차별 사업비가 초기 계획보다 감소되면 수행가능한 공정도 초기 공정계획대비 감소하게 되므로, 변동 사업비 내에서 수행가능한 적정한 공정을 재수립하여야 한다. 그러나 대다수 현장에서는 공정 재수립 없이 당초계획대로 공정을 진행하면서 사업비가 소진되면 현장 작업을 쉬는 경우가 많다. 이에 본 연구에서는 변동된 사업비 내에서 적정 공정계획을 재수립하고, 재수립된 일정에 따라 비용투입현황을 시각화하는 능동형 5D CAD 시스템을 개발한다. 이는 공정계획 재수립을 위한 의사결정 지원도구로 활용될 수 있고, 기존의 단순 시각적 정보제공에 중점을 둔 5D CAD시스템의 실무 적용성을 높일 수 있을 것이다.

이산화탄소 저감 효과의 경제적인 가치를 고려한 Cogeneration System의 경제성 분석 (Economic Analysis of Cogeneration System Considering Economical Value of $CO_2$ Reduction Effect)

  • 강율호;구본철;한영철;이재근
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 하계학술발표대회 논문집
    • /
    • pp.1117-1121
    • /
    • 2008
  • Recently energy consumption and $CO_2$ emission issue are important problem on international society. The present study has been conducted economic analysis considering economical value of $CO_2$ reduction effect. We analyze annual energy cost and annual $CO_2$ emission of the cogeneration system and gas boiler system in hotel. The first results shows that annual energy cost of cogeneration system (751,740,126 won) is more profitable than gas boiler system (801,128,408 won) by 6.2% (49,388,281 won). The second results shows that annual $CO_2$ emission of cogeneration system (3,297 ton) is less than gas boiler system (3,536 ton) by 6.8% (239 ton). The Economical value of $CO_2$ reduction effect is 4,773,898 won. The cost effect according to the reduction of $CO_2$ is corresponding to 9.7% of reduction cost for total energy cost. The result of this study means that $CO_2$ reduction effect is essential item in introduction and change of facility for economic analysis.

  • PDF

The Estimation Analysis Method of the Annual Operation Cost of Korean High-rise Condominiums

  • Ko, Eun Hyung;Choi, Jun Young
    • Architectural research
    • /
    • 제7권1호
    • /
    • pp.11-18
    • /
    • 2005
  • In today's building industry the emphasis has been geared more towards construction, thus building maintenance and life cycle have been neglected until now. A direct result of this neglect is the rapid aging of building, which leads to more cost-effective decision making methods for the prolongation of building life span. The following study is conducted in the area of Daegu and Seoul in order to develop the estimation analysis method of the annual operation cost of the Korean high-rise condominiums for the cost-effective decision making support through mathematical and statistical analyses including the present value and standardized measurement corrections. Based on the assumption that the life expectancy of the high rise condominium is 50 years, initial cost is ₩421,212/$m^2$, and a total sum of yearly operation cost during life expectancy is ₩2,154,499//$m^2$), yearly accumulated operation cost is shown as below: $AOC=0.7097t^4-38.803t^3+806.95t^2+11045t-496.52$ ($R^2=0.98$) (Here, AOC = Accumulated Operation Cost, t = given years)