An Empirical Study on Pricing Model for Software Operation (소프트웨어 운영 대가산정 방식에 대한 실증적 연구)

  • Kim, Heungshik;Kim, Choong Nyoung;Seo, Yongwon
    • Journal of Information Technology Services
    • /
    • v.18 no.4
    • /
    • pp.67-82
    • /
    • 2019
  • The purpose of this study is to improve the calculation method of the software operation pricing proposed by the software business price calculation guide from 'input manpower method' to 'rate calculation method'. The software operation pricing of the input manpower method is not objectively calculated in the domestic IT outsourcing situation where the statistical data based on the activity based estimating is insufficient and it is decided by agreement between the owner and the client. In addition, there was no standard for adjusting the productivity according to the characteristics of the operation service. In order to improve this, an operational correction factor item that can affect the software operation productivity was selected based on foreign and domestic standards, and it was confirmed through the first questionnaire to IT operation managers. In order to determine the level of difficulty of the fixed operational correction factors, the operational correction factor using AHP technique was confirmed through a second questionnaire for pairwise comparison. The operational difficulty calculation table was developed with reference to COCOMO and ITIL standards. Finally, we propose a new pricing scheme that reflects the operating rate. Regression analysis was carried out by collecting the data of the domestic public institutions on the estimated cost and the actual cost calculated from the new rate method software operation pricing. The results of the regression analysis show that the estimated cost and the actual cost are related to each other. Mean magnitude of relative error(MMRE) and PRED[25] analysis were added for accuracy analysis. MMRE and PRED also showed satisfactory results, confirming the possibility of replacing the rate method software operation pricing.

Data Standardization of Construction Performance for Optimized Process Management in High-rise Curtain-wall Operations (초고층 커튼월 공정관리 최적화를 위한 건설성능 데이터 표준화)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.283-284
    • /
    • 2012
  • High-rise building construction has been increasing for the recent years and the construction process has become more complicated. This suggests a need for precise planning based on reliable data to prevent cost overruns and delays. However, the process planning is implemented based mainly on the experience of engineers that can result in critical damage in cost and time. Accurate productivity estimation and unit cost analysis must be considered important matter to prevent such disaster. This study estimates productivity and unit cost of curtain wall operations in high-rise building construction by simulation techniques and statistical methodologies. This study suggests a decision making methodology for the site personnel that enables to compare various combinations of productivity and unit cost based on reliable data that has been collected in actual construction sites. It is expected that this study contributes to the following research of developing an optimized construction performance assembling model for the site personnel.

  • PDF

A DECISION MAKING FRAMEWORK FOR REDUCING PROJECT DURATION BY APPLYING CONCURRENT ENGINEERING IN CONSTRUCTION

  • Han, Jin-Taek;Choi, Do-Seung;Lee, Jae-Seob
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1540-1547
    • /
    • 2009
  • Steel frame factories were surveyed in this study in order to explore the possibility of shortening the construction time and save on construction cost through overlapping at the stages of design or construction. In the survey, construction professionals were interviewed in order to collect quantitative data. Hypotheses were then formulated, and the data was thereby analyzed using the simulation technique in order to analyze the effects of the concurrent engineering method on shorter construction time and cost saving. In addition, actual cases were analyzed to determine the overlapping rates of major processes in terms of shorter construction time and cost saving and to analyze the relationship between time and cost due to overlapping.

  • PDF

Development of a Computer-assisted Cost Accounting System Prototype for Hospital Dietetics (병원 영양과의 재무관리 시스템 전산화 모델에 관한 연구)

  • 최성경
    • Journal of Nutrition and Health
    • /
    • v.20 no.6
    • /
    • pp.442-455
    • /
    • 1987
  • The purpose of the study were to assist foodservice managers in complex decision making by utilizing computerized cost accounting system and to relieve managers from repetitive and routine tasks so that more adequate patient care and consultation can be provided. The scope of the computer-assisted cost accounting system consists of budget, menu planning, purchasing, inventory, cost control and financial reporting. The content of the computerized system are summarized as follows ; 1) For budgeting monthly income was estimated by calculating unit cost of each meal and forecasting serving numbers. The actual serving numbers for patients and employees were totaled everyday, and utilized as the basic data base for estimating income and planning menu. The monthly lists of meal sensus were generated. 2) for menu planning concersion factors were computed based on the standarized recipe for 50 servings. Daily menus for patients and employees which include total amounts of each ingredient and cost analyzed information were generated. 3) Daily and monthly purchasing report for each food item classified by patient and employee meals were generated. 4) Inventory transactions such as recipts and issues were totalized daily for each stocked item, and monthly inventory reports were generated. 5) Cost analysis reports for each menu item were generated into two ways based on the budget coat as well as the purchasing cost. 6) Editing new recipes and updating food costs change to the data base were carried out. 7) Financial reports were generated monthly, first-half and second-half of the year, and yearly basis.

  • PDF

MULTIPLE LINEAR REGRESSION APPROACH FOR PRODUCTIVITY ESTIMATION OF BULLDOZERS

  • Abbas Rashidi;Hoda Rashidi Nejad;Amir H. Behzadan
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1140-1147
    • /
    • 2009
  • Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.

  • PDF

A Concept of Probabilistic Maintenance Cost Analysis Considering Risk Factors of Aged Multi-Family Housing (노후 공동주택의 위험요인을 고려한 확률적 유지관리비 분석 개념)

  • Park, Moon-Sun;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.246-247
    • /
    • 2019
  • This study was conducted to provide useful information to enable planned repair and cost planning during the operation and maintenance phase of aged multi-family housing. For this purpose, The concept of probabilistic maintenance cost analysis considering the risk factors of the aged multi-family housing is presented in the following six steps. 1. Risk factor investigation and analysis 2. Classification and deriving of maintenance cost 3. Investigation and deriving cost maintenance cost of old apartment house 4. Analysis of expert questionnaire 5. Analysis of Monte -Carlo simulation 6. Probabilistic maintenance cost Deriving the result. This study has limitations that need to be verified by applying actual data.

  • PDF

PSEUDO-RELIABILITY MODEL OF COMBAT TANK SYSTEM

  • Lie, Chang-Hoon
    • Journal of the military operations research society of Korea
    • /
    • v.3 no.1
    • /
    • pp.137-150
    • /
    • 1977
  • The effectiveness of an actual combat tank system is analyzed. A measure of effectiveness which includes performance and reliability called pseudo-reliability is introduced. A model is introduced to optimize the design of the system in which the system pseudo-reliability is maximized subject to cost constraint. This model is a nonlinear programming problem and is solved by the sequential unconstrained minimization technique (SUMT). A numerical exampl with actual data from the test evaluation of five combat tanks is used to illustrate the model.

  • PDF

Cost Estimating Method of Public Building Construction through Construction Scale (공사규모에 따른 공공건축물 공사비의 산정방법)

  • Yim, Jin-Ho;Park, Jun-Mo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.307-316
    • /
    • 2015
  • As there are a lot of differences in the public building construction cost depending on the construction scale of actual construction cost system, a lot of problems occur in the estimation of the cost. So, the development of a predictive model depending on the construction scale shall be used in a way that it is applied to the case selectively and differently. This study drew a cost estimating model through a regression analysis. For this, 42 construction sites which were ordered during 2011 to 2012 by Public Procurement Service data were selected as a historical data. Based on the application of the model to new construction and the verification of its effect, the reasonable model for estimating the construction cost has been suggested.

A Study on the Estimation Method of Operational Delay Cost in Bus Accidents using Transportation Card Data (교통카드자료를 이용한 버스 사고 시 운행지연비용 산정 방법론에 관한 연구)

  • Seo, Ji-Hyeon;Lee, Sang-Soo;Nam, Doohee
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.5
    • /
    • pp.29-38
    • /
    • 2018
  • This study aims to propose a method for the estimation of operational delay cost using transportation card data in bus accidents. Average operational delay time from bus accidents was surveyed among 12 bus companies through an interview method. Then, the operational delay cost was estimated using actual traffic accident data and transportation card data. Results showed that average loss time per bus accident was found to be 45 minutes. In addition, total occupancy of 659 was estimated for the accidents investigated using transportation card data, resulting a total loss time of 494.25 hours. An estimated operational delay cost was 186.9 thousand won per accident, which was 6.37% of social agency cost. The magnitude of this number implied that operational delay cost may have a significant impact on traffic accident cost if included.

A Study on the Development of the Minimization Algorithm of Total Operating Cost in a Multi-stage Distribution System by the Partial Delivery Method (분납조달 방법을 통한 다단계 분배시스템의 총운전비용 최소화 알고리즘 개발에 관한 연구)

  • 최진영
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.139-144
    • /
    • 1997
  • The objective of this study is to establish an actual optimization strategy for the traditional multi-stage distribution system which consists of factory warehouse, central distribution warehouse, and regional distribution warehouse under the basic assumption of distribution system. A minimization algorithm of total operating cost in a multi-stage distribution system was developed by expanding the previously existing algorithm through consideration of additional transportation environment. Alternative non-linear transportation costs for the same travel distance can be applied for the multi-stage distribution system by estimating the corresponding characteristic values through the collection of the actual data representing the change of transportation circumstances.

  • PDF