An Evaluation of the Impact of Integration and Computerization on Construction Projects (인테그레이션과 컴퓨터 사용이 건설프로젝트에 미치는 영향 평가)

  • Kim Chankyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.92-97
    • /
    • 2001
  • The level of awareness and actual implementation of integration and computerization in the construction industry is growing. However, it is not clear at this point how to assess the extent of their impact and to identify in which ways they better support the construction projects related to their success. The objectives of this research are the development of a model to evaluate the impact of integration and computerization on construction projects and the recommendation of guidelines for companies in identifying suitable ways for them to incorporate integration and computerization Into their operation. The developed conceptual model has been found robust enough to be used as a benchmarking tool in evaluating the performance of the construction process and to strategize its future operation.

  • PDF

A Study on the Key Factors Influencing the Reliability of Conceptual cost estimates in Building Construction Projects (건축 프로젝트 개산견적 신뢰도에 영향을 미치는 주요 인자에 관한 연구)

  • An, Sung-Hoon;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.4
    • /
    • pp.53-59
    • /
    • 2008
  • Cost estimates are very important to their decision-making in the early stages of a construction project. So Clients have wanted not only to know the results of conceptual cost estimates but also to assess their quality Conceptual cost estimates process is very complex process, so the results of cost estimates are influenced by various factors. So the purpose of this study is to reveal the key factors which influence the reliability of conceptual cost estimates in building construction projects. The analytic hierarchy process is used to determine the relative important weights of elements influencing the conceptual cost estimates. And factor analysis is used to reveal the key factors from the elements that influence the conceptual cost estimates. The results showed that the key factors is an experience level, available data level, level of will for winning the bid, difficulty level of conceptual cost estimate, uncertainty level.

A Study of a Scheme to Assess and Improve ESB-based SOA Applications from the S/W Architecture Perspective (ESB기반 SOA Application에 대한 S/W Architecture 관점의 평가와 개선 방안에 대한 연구)

  • Im, Chol-Hong;Hong, Do-Seok;Choi, Jeong-Joon
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2006.05a
    • /
    • pp.547-554
    • /
    • 2006
  • 국내외적으로 차세대 아키텍처인 SOA에 대한 관심이 높아지고 있으며, 수년 내에 SOA가 일반적인 아키텍처가 될 것으로 전망 되고 있다. 하지만, 여전히 많은 기업들이 막연하게 SOA가 현실화 되기 에는 아직은 많은 위험 요소가 있는 것으로 판단 하고 있다. 본 논문에서는 SOA기반 차세대 Architecture에 대한 시나리오 기반의 정성적, 정량적인 검증을 수행 하여 아키텍처적인 관점에서 타당성을 제시하고, SOA를 실제 구축 프로젝트에 적용하기 위한 방안을 제시하여, 이론 및 사상적인 측면에서 벗어나 현실화된 Architecture로써 SOA가 도입 될 수 있도록 하고자 한다.

  • PDF

A Study on Risk Analysis and Relevant Measures for the Successful Performance in Overseas Construction Projects - Including Case Analysis on A Overseas Construction Project - (해외건설 프로젝트의 성공적 수행을 위한 위험요소 및 대처방안에 대한 연구 - 해외건설 사례분석을 포함하여 -)

  • Kim, Sang-Man
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.50
    • /
    • pp.215-250
    • /
    • 2011
  • Korean won overseas construction projects worth 71.6 billion US Dollars in 2010, which exceeded that of 2009 by 45.6%. An overseas construction project is a transaction of large scale, long term project, many parties participating, deferred payment, and of high-technology. It contributes to foreign currency earning, and also leads the nation's export restructuring work towards high value-added one. There are various kinds of risks towards the relevant parties respectively, which are key elements in successfully performing the overseas construction project. There are completion risk, financing risk, operating risk, revenue risk etc, in an employer's place. A contractor may be confronted with payment risk, issuance risk of performance bond, financing risk, performance risk of sub-contractors, and exchange rate risk. In lenders place there are repayment risk, completion risk, and political risk in the host country. In order to mitigate risks, the parties shall take relevant measures or require relevant securities. A contractor needs to evaluate the credibility of an employer in respect of payment risk, and can also request export insurance cover by the Korea Trade Insurance Corporation(the former 'Korea Export Insurance Corporation"). An employer can require a contractor to provide performance bond in respect of completion risk, and employ a well-known first class bank as a mandated arranger to arrange financing with regard to completion risk. Lenders needs to evaluate the credibility of an employer and accomplish feasibility study of the project. Lenders can request insurance cover from export credit agency. Once the parties assess the respective risks and obtain relevant securities, the project will be successfully completed. The success of the project will be sure to bring the parties involved enormous profits and another opportunity to participate in overseas construction project afterwards.

  • PDF

A Study on public renewal of abandoned space by public sector -Focused on KAMCO pilot projects- (공공주체에 의한 국내 유휴공간의 공공적 재생방향에 관한 연구 -한국자산관리공사의 국유지 위탁 시범 개발사업을 중심으로-)

  • Oh, Joon-Gul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.6
    • /
    • pp.3005-3012
    • /
    • 2013
  • This study investigates the space, use, and procedural aspects that should be considered in securing the publicity in space renewal of unused lands by analyzing the characteristics of relevant projects conducted by The Korea Academia-Industrial Corporation Society, a party representative of a public agent. The findings reveal the following conclusions. 1. There should be a required procedure that guarantees the adequate qualities of public organizations or publicity for projects run by KAMCO. 2. When the public agent plans a project, there should be an effort to clarify the profit limitations and adequate guarantee of consigned fees charged by the consigned organizations in an attempt to ensure that certain proportions are used to enhance the public goods. 3. There is a need to diversify the ways KAMCO discloses information. A professional organization and separate budget should be required to assess the autonomy of KAMCO to guarantee publicity.

Community-Based Learning and Capstone Design (지역사회경험학습과 공학설계교육)

  • Lee, Joo-Sung;Jeong, Bong-Ju
    • Journal of Engineering Education Research
    • /
    • v.13 no.6
    • /
    • pp.180-187
    • /
    • 2010
  • Design and management of information and industrial engineering (DMIIE) is a project-oriented junior/senior class that integrates the methodologies of industrial and information engineering in order to solve real-world problems. It examines social issues, engineering approaches to solve the problems and business models that can generate sustainable value for society. This course help students use their engineering knowledge to assess and solve the problems faced by local community. By conducting real-world projects, students get an opportunity to refine their oral and written communication skills. In this paper, the experience of DMIIE course is presented. The effects of the community-based learning for a senior design course are discussed. The possibility of using this blended type of design course to meet the ABEEK outcomes is also stated.

  • PDF

Methods of Establishing the Optimal Performance Measurement Baseline and Evaluating the Progress for Implementing EVMS (EVMS 적용을 위한 최적 성과측정기준선 설정 및 진도율 산정 방법)

  • Won Dong-Soo;Kim WooYoung;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.395-400
    • /
    • 2001
  • In construction projects, it is very important to evaluate the performance of works in comparison with the cost and schedule plans. So, on the first of July, 2000, the Ministry of Construction and Transportation announced the EVMS will be applied in public sector soon. However there are still many arguments about how to establish the Performance Measurement Baseline(PMB) and how to evaluate the progress with accuracy. And many people confuse the meaning of EVMS with that of cost and schedule management. So, the purpose of this research is to propose the new useful methods to set up the PMB and to assess the exact progress in consideration of cost, schedule, and float time for successful implementation of EVMS.

  • PDF

A Study on the Teaching Method of Mobile Platform App Development for Improving Computing Thinking (컴퓨팅 사고력 향상을 위한 모바일 플랫폼 앱 개발 교수·학습 방법 연구)

  • Jeon, Mi-Yeon;Kim, Eui-Jeong;Kang, Shin-Cheon;Kim, Chang-Suk;Chung, Jong-In
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.190-192
    • /
    • 2019
  • Not only learners majoring in computer science, but also non-engineered learners want to implement their ideas as apps through real-life problems. In response, first-year university students with little experience in creating apps studied how to develop mobile platform apps to improve computing thinking skills. We applied the teaching and learning procedures of the Discovery-Design-Development among the software teaching and learning models, and used Android Studio Unified Development Environment (IDE) as a development tool to design mobile platform app development projects and assess whether they helped improve computing thinking skills. The application of the designed teaching and learning method found that the project output was implemented as an app through emulator, which gave students high interest in class and satisfaction, and was effective in improving their computing thinking ability.

  • PDF

Development of an Artificial Intelligence Integrated Korean Language Education Program

  • Dae-Sun Kim;Eun-Hee Goo
    • Journal of the Korea Society of Computer and Information
    • /
    • v.29 no.2
    • /
    • pp.67-78
    • /
    • 2024
  • Amidst the onset of the Fourth Industrial Revolution and the prominence of artificial intelligence, societal structures are undergoing significant changes. There is a heightened global interest in AI education for nurturing future talents. Consequently, this research aims to develop an AI-integrated Korean language curriculum for first-year high school students, utilizing the ADDIE model for instructional program development. To assess the program's effectiveness, pre-post assessments were conducted on future core competencies (Collaboration, Communication, Critical Thinking, Creativity) and knowledge information processing skills. The curriculum, spanning nine sessions and incorporating four small projects, sought to provide students with a new experience of AI-integrated Korean language education. As a result, students who participated in the program demonstrated improvement in future core competencies across all areas, and positive outcomes were observed in satisfaction levels and qualitative analysis. Through these findings, it is suggested that this program successfully integrates artificial intelligence into high school Korean language education, potentially contributing to the cultivation of future talents among students.

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.