Journal of the Korean Society for Aviation and Aeronautics
/
v.18
no.3
/
pp.92-98
/
2010
The AHP methodology compares criteria, or alternatives with respect to a criterion, in a natural, pairwise mode. AHP has been applied in a wide variety of applications multi objective decision making being just one. If a group of expert with different aspect, they need some way to revise expert group. We proposed the concatenation of expert to survey the AHP pairwise question for multi-attribute decision making. In this paper, we suggest a way to revise the expert's priorities in hierarch using concept of different group opinion.
Proceedings of the Korea Society for Simulation Conference
/
2001.05a
/
pp.8-13
/
2001
다 단계 의사결정지원시스템, AHP(Analytic Hierarchy Process)는 다수 대안에 대하여 다 면적인 평가기준과 다수 주체에 의한 의사결정을 위해 설계된 의사결정지원방법의 하나이다. AHP 시스템은 먼저 주어진 시스템을 구성하고있는 요소를 세분하고 그 분할된 요소를 계층적으로 구성하며 다음으로 계층간 각 레벨에 있는 요소의 상대적 중요도에 대한 판단을 종합하는 과정을 거친다. 본 연구에서는 이러한 AHP방법을 실용화하기 위하여 사용자가 Web기반에서 활용하기 쉽도록 GUI-tyre 프로그램을 개발하고 이를 검증하였으며 예제를 들어 보였다. 본 연구에서 개발한 소프트웨어는 크게 다음과 같이 3 가지 구조로 구성하였다. 단계 1 : 대안 평가의 아이디어 창출 단계(Brainstorming), 단계 2 : 다 단계, 다 기준 의사결정지원시스템(AHP), 단계 3 우선 순위 종합모델(MRM)
HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
Nuclear Engineering and Technology
/
v.47
no.3
/
pp.362-379
/
2015
In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.
Purpose - An empirical analysis of various opinions of experts to build Busan's global city image. Based on this, we provide strategy establishment metrics using opportunities, strengths, and threats to build Busan's global city image. Research design, data and methodology - SWOT-AHP analysis are used in terms of methodology, and this study is based on experts' reviews and answers. In addition, AHP analysis is performed based on SWOT analysis to derive the result values for important priority factors. Result - As a result of the prioritization of SWOT-AHP results, a matrix of strategic development directions for Busan city brand building can be presented. As a result of the composite weighting, the factors related to opportunity were ranked as important. In addition, matrices on SO strategy, ST strategy, WO strategy, and WT strategy were derived. Conclusion - This study is an interdisciplinary study from the economic aspect, international management and international marketing aspect, administrative aspect, and architectural engineering aspect. Through this, the image of a global city of Busan that can overcome COVID-19 and cope with the 4th industry in the future will be built, and Busan will be able to build a global international city image by commercially attracting the 2030 World Expo.
Through rail transit has many merits as a safe, environmental harmonic and scheduled transit, there are many problems to construct railroads because of the public resentment. However, there is no reasonable way to settle the conflict properly and it causes enormous social and economic losses. This paper suggests a methodology to evaluate public complaint using the AHP technique, which is generally used as the methodology to evaluate public complaint using the AHP technique, which is generally used as the Multi-Criteria Decision Making (MCDM). However, the result from the AHP has some defects to control conflicts because the interests related to railroad projects are so complex that it is hard to make people persuaded easily. Therefore, this paper suggests 'the improvement ranking method', 'the sensitive analysis', and 'the assessment of independence relationship' which can aid the basic AHP to be robust. And the AHP. modified by fuzzy method, is also suggested to apply this methodology to example rail paths in Korea.
Journal of Korean Society of Industrial and Systems Engineering
/
v.45
no.4
/
pp.118-126
/
2022
This study attempts a comparison between AHP(Analytic Hierarchy Process) in which the importance weight is structured by individual subjective values and regression model with importance weight based on statistical theory in determining the importance weight of casual model. The casual model is designed by for students' satisfaction with university, and SERVQUAL modeling methodology is applied to derive factors affecting students' satisfaction with university. By comparison of importance weights for regression model and AHP, the following characteristics are observed. 1) the lower the degree of satisfaction of the factor, the higher the importance weight of AHP, 2) the importance weight of AHP has tendency to decrease as the standard deviation(or p-value) increases. degree of decreases. the second sampling is conducted to double-check the above observations. This study empirically checks that the importance weight of AHP has a relationship with the mean and standard deviation(or p-value) of independence variables, but can not reveal how exactly the relationship is. Further research is needed to clarify the relationship with long-term perspective.
Journal of Korean Society of Industrial and Systems Engineering
/
v.29
no.1
/
pp.26-33
/
2006
The potential needs as well as visible needs of customer should be considered in order to research and analyze of the customer data. The methods to analyze customer data is classified into customer segmentation, clustering analysis model, forecasting customer response probability model, analysis of the customer break rate model and new customer analysis model by the purpose. In this study, we developed the CW-CLV (Correlation Weight Customer Lifetime Value)method that used AHP(Analytic Hierarchy Process)rule for enhance the reliability of customer data and quantitative analysis of the customer segmentation, based on CLV(Customer Lifetime Value). We suggest to new variables and methodology from determined CW-CLV coefficients, because all of companies respect to the diversified customers classification and complexity of consumers needs. Finally, we unfolded any company's scheduling added new methodology using simulation and leaded conclusion about the new methodology.
The purpose of this paper is an application of AHP in the problem of exportable nuclear technology selection based on data gathered from nuclear experts. In this paper, the decision criteria for evaluating export competitiveness of nuclear technologies are identified and the hierarchical structure of decision making process is developed systematically. Subsequently the values of weights for relative importance among decision criteria are derived using AHP methodology, and the score of importance of nuclear technologies with respect to each criterion is evaluated. Finally the score indicating exportability of each nuclear technology is quantified in order to prioritize then. We discuss implications of our results with a viewpoint of national nuclear technology policy.
This paper aims to construct an effective decision making model on selection of product design in product development using fuzzy AHP technique. It is expected that this paper contributes to enhancement of company's market competitiveness by shortening the lead time to develop a new product and minimize initial investment. The proposed model using fuzzy AHP enables quick decision making by integrating and analyzing all customer requirements related to a product. In addition, it can deal with vagueness and uncertainty of decision making process using fuzzy set theory. Decision making processes for evaluating the best selection of product design are also constructed to describe the exact concept of development. A tennis racket is shown as an example. The proposed model is expected to be applied in various fields of managerial decision making processes as well as of product development process.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.