Introducing and Surveying 4D Models in AEC Industry (4D 공정관리시스템의 개발현황 조사연구)

  • Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2001
  • The traditional schedule management system provides project manager with analysis reports, such as progress control, earned value management and resource management, including schedule chart. However, the reports and functions in the traditional system are still limited in 2D concept. Recently, the scheduling method is using 4D concept that time of construction schedule is linked to space of drawings. This study presents the limitation of those systems and an improved method for developing 4D system through the comparative analysis of representative 4D systems that are developed up to date.

  • PDF

Development of Telepresence System for Schedule Management in Railway Construction Project (철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Park, Jin-Jung;Moon, Hyoun-Seok;Shin, Min-Ho
    • Journal of the Korean Society for Railway
    • /
    • v.13 no.1
    • /
    • pp.23-30
    • /
    • 2010
  • In the construction phase, the existing schedule management system by 4D CAD has been difficult to check for a status and progress of construction product in real-time because it simulates only VR (virtual reality) object based on a planned schedule. This study suggests a construction schedule management system by telepresence technique that can visualize progress status in real-time by using 4D CAD system based on remote monitoring. The telepresence methodology and system were developed in the study and they were verified for a railway construction project. The developed system can examine the status and progress of construction because it can compare 4D simulation based on planned schedule with real-time site images through web-camera.

Development of Major Functions of Visualization System for Construction Schedule Data in Plant Project (플랜트공사 관리 효율화를 위한 공정정보 시각화 시스템의 주요 기능 구성방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Ji, Sang-Bok;Lee, Tae-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.66-76
    • /
    • 2008
  • Plant project is a complex project that consists of civil engineering, building, mechanical and electronic works. The schedule management is one of important factors in plant project because the construction duration of the project is very short comparing with the other construction projects. Specially, 4D CAD system needs to visualize construction schedule information in those complex projects. This study suggests methodologies for improving 4D CAD functions by considering those project characteristics. To develop a plant 4D CAD system, this study includes to develop new functions by analyzing actual schedule information from the plant construction sites.

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

Simplified Methodology to Generate 2D/3D Object in 4D system for Civil Engineering Projects (토목시설물 4D구현을 위한 2D/3D 객체 생성 간편화 기법)

  • Lee Syeung-Youl;Lee Yong-Soo;Kim Chang-Hak;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.585-588
    • /
    • 2003
  • This study attempts to develop a skeleton model to link construction schedule and 3D object for drawings in 4D system. Generally, the construction schedule and 3D object can be linked in 4D system by imported files which are made in specific S/Ws such as CAD S/W and scheduling S/W. Those methods have a difficulties for operating 4D data because extra work needs to link 4D data for each activity. This study develops a 4D model which the 4D data can be self-generated within the system. The suggested model can reduce the initial input data for new project by integrating schedule and 3D object in 4D system.

  • PDF

Earned Value Management Systems Using 4D-CAD (4D CAD 활용을 통한 공정-원가 통합 시스템)

  • Park Ji-Ho;Jung Young-Soo;Kim Sung-Mo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-508
    • /
    • 2003
  • Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Improved Link System of Schedule and 3D Object for Visualizing Effective 4D Model on Plant Project (플랜트 4D의 효율적 공정연계체계를 위한 일정 및 도면의 개선된 연계방법론 구축)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Yoon, Sun-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.559-562
    • /
    • 2006
  • Existing 4D systems are using the 1:1 link system that directly links a schedule and a 3D model object. But considering that plant facility includes various kinds of schedule and 3D model object, this study suggests an improved link methodology of multi-selected objects and two-way link system for minimizing link errors which generated in case of multi-selected objects. For the link system, this study introduces a new concept called as interface board. Interface board can be used as an information center for representing all information of link items in the current project. It may be expected that 4D model can build an effective and rapid link system of plant project by this new approach.

  • PDF

Development of 4D System Linking AR and 3D Printing Objects for Construction Porject (AR과 3D 프린팅 객체를 연계한 건설공사 4D 시스템 구성 연구)

  • Park, Sang Mi;Kim, Hyeon Seung;Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.181-189
    • /
    • 2021
  • In order to increase the practical usability of the virtual reality(VR)-based BIM object in the construction site, the difference between the virtual image and the real image should be resolved, and when it is applied to the construction schedule management function, it is necessary to reduce the image gap between the virtual completion and the actual completion. In this study, in order to solve this problem, a prototype of 4D model is developed in which augmented reality (AR) and 3D printing technologies are linked, and the practical usability of a 4D model linked with two technologies is verified. When a schedule simulation is implemented by combining a three-dimensional output and an AR object, it is possible to provide more intuitive information as a tangible image-based schedule information when compared to a simple VR-based 4D model. In this study, a methodology and system development of an AR implementation system in which subsequent activities are simulated in 4D model using markers on 3D printing outputs are attempted.

BIM Utilization Plan for Schedule Risk Management (공정리스크 관리를 위한 BIM 적용 방안)

  • Lee, Gye-Hyun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.143-144
    • /
    • 2012
  • A number of construction projects tied to the concerns and decision-making is also very complicated. In addition, more than any other industry, is inherent in many risk factors. In the course of the construction project on risk factors that exist in the early stages of project risk factors to predict in advance and prepare a project by shortening the construction period and project cost as you can to maximize performance. In this study, I proposed risk management processes and how they are used in web-based schedule risk in the process of change management system, and between 3D CAD, 4D CAD taking into account the linkages, risk management strategy process in the BIM environment.

  • PDF