Earned Value Management Systems Using 4D-CAD
4D CAD 활용을 통한 공정-원가 통합 시스템
- Published : 2003.11.01
Abstract
Cost and schedule are the major concerns for the successful construction project management. The four dimensional CAD (4D CAD) integrating graphical data and scheduling data has also been an area of research interests for improving construction controls. In order to achieve the benefits from these areas in an integrated way, this study proposes a 4D-EVMS system for the owners. Managerial requirements for cost and schedule control for the owners are identified first. A 4D-EVMS model is then proposed which provides functional flexibility in order to enhance the efficiency of the system. Lessons learned and practical implications are briefly summarize.
최근 공정관리와 원가관리의 중요도 인식에 기인하여 공정/원가 통합관리 및 공정정보와 3차원 설계정보를 연계할 4차원 설계 정보 연구가 활성화되고 있다. 공정과 원가를 통합할 수 있는 EVMS의 관리적 효과와 도형정보와 공정관리를 통합을 통하여 일정관리의 편의 및 효율을 극대화 하는 4차원 CAD(4D CAD)의 시각적 효과를 통합하는 4D-EVMS는 프로젝트 관리의 중요한 도구가 될 수 있다. 이러한 맥락에서, 본 연구의 목적은 발주자 공정/원가 총합관리를 위한 기본요건 도출 및 구현방안 제시에 있다. 이러한 연구의 결과물은 발주자 공정/원가관리의 업무효율 증대뿐만 아니라 실적자료 축적 및 홍보 관점에서도 기대효과를 가진 수 있을 것으로 판단된다.