Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- autumn
- /
- Pages.500-503
- /
- 2003
A Study on the Efficiency of Earned Value Management System for Practical Application
공정${\cdot}$ 공사비 통합관리시스템의 실무적용 효율화 방안
Abstract
Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.
현재, 국내 건설업에서 공정과 공사비 정보를 통합관리할 수 있는 공정
Keywords