• Title/Summary/Keyword: 4D CAD system

Search Result 197, Processing Time 0.027 seconds

Development of a Similarity Evaluation System for Offshore Plants' 3D Piping CAD Models Created Using Aveva Marine and SmartMarine 3D (Aveva Marine과 SmartMarine 3D 간의 해양 플랜트 3D 배관 CAD 모델 유사도 평가 시스템 개발)

  • Lee, Jaesun;Kim, Byung Chul;Kim, Hyungki;Cheon, Sanguk;Cho, Mincheol;Lee, Gwang;Kim, Jin-Hyun;Mun, Duhwan;Han, Soonhung
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.40 no.4
    • /
    • pp.397-406
    • /
    • 2016
  • Diverse stakeholders engaged in design, construction, and operation and maintenance of offshore plants typically operate heterogeneous plant 3D CAD systems. Engineering, procurement, and construction (EPC) companies are required to submit plant design result to the owner in the form of a plant 3D CAD model, as specified in the contract. However, because of the limitations of data interface of plant 3D CAD systems, EPC companies frequently perform manual remodeling to fulfill the terms and conditions of the contract. Therefore, comparison should be performed between the source plant 3D CAD model and the remodeled plant 3D CAD model to prove the validity of the remodeled plant 3D CAD model. To automate the comparison process, we have developed a system for quantitatively assessing the similarity of the plant 3D CAD models. This paper presents the architecture and detailed functions of the system. In addition, experimental results using this system are explained.

Methodologies for Effective Construction Information Management of Railway Facilities through Linking 4D CAD to IETM (4D CAD와 IETM 연계를 통한 철도시설의 효율적인 공사정보관리 방안)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Park, Seo-Young;Kim, Hyun-Soo;Ahn, Jae-Gyu
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.139-142
    • /
    • 2008
  • Construction Management by using 4D CAD system analyzes operations information based on 3D and 4D objects. But it is difficult to provide a variety of documents linked by 4D objects in a lump from 4D CAD system based on visual object, and to get an optimal decision-making information to conduct business. Therefore, it is necessary to construct effective construction information management systems and to organize integrated information through linking non-objects to objects. This study suggests methodologies of effective construction management for railway facilities through building of framework for practical application and methodologies to link 4D objects to IETM documents. Accordingly, it is possible to establish a systematic decision-making for an effective construction management of railway facilities, and this provide integrated methodology for linking non-objects to objects.

  • PDF

Sharing Ship Design Model Based on STEP methodology (STEP 방법론을 이용한 선박설계 모델의 공유)

  • Yong-Jae Shin;Soon-Hung Han
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.35 no.4
    • /
    • pp.98-108
    • /
    • 1998
  • Hull design data is currently prepared by a 2D CAD system and re-input to 3D CAD systems specialized for detail design or to a structural analysis system. In this paper, sharing design data among different CAD systems has been studied. Based on STEP methodology, a neutral model is generated from 2D AutoCAD drawings. To handle a geometric data of this model, the non-manifold model of ACIS is used because it can support various CAD data representation such as 2D graphic entities, 3D wireframe, 3D surface model, and solid B-Rep/CSG model. It is observed that a mon-manifold model can easily be transformed to a 3-D wireframe model for the hull detail design system AutoDef or a FE model for the structural analysis system Nastran.

  • PDF

Function Organization of nD CAD System for Plant Project by Linking Cost and Resource Information (비용과 자원을 연계한 플랜트공사 nD CAD 시스템 기능 구성 방안)

  • Kang, Leen-Seok;Ji, Sang-Bok;Moon, Hyoun-Seok;An, Jae-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.809-812
    • /
    • 2007
  • This study suggests a methodology for organizing functions of nD CAD model which 4D object is linked with cost and resource information. And the suggested model is composed of process analysis function of plant project based on visualized scenario analysis. That is, it is possible to manage effectively not only construction schedule plan, but also resource and cost information by integrating construction management information into nD CAD object. And the suggested model can be utilized as information of a effective decision-making tool through analyzing of optimal process scenario and sharing of an analyzed information.

  • PDF

Study on die plate design and machining using the 3D CAD/CAM system (3D CAD/CAM을 활용한 다이 플레이트의 설계 및 가공)

  • Chio Kye-Kwang
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.7 no.4
    • /
    • pp.550-553
    • /
    • 2006
  • This study used the 3D CAD/CAM system in manufacturing die plates to improve productivity. UG NX 3.0 was used as 3D CAD/CAM software, with the created NC code transmitted to the CNC Milling and Wire Cut Electric Discharge machine. The die plate was then automatically machined.

  • PDF

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

Evaluation of internal fit of interim crown fabricated with CAD/CAM milling and 3D printing system

  • Lee, Wan-Sun;Lee, Du-Hyeong;Lee, Kyu-Bok
    • The Journal of Advanced Prosthodontics
    • /
    • v.9 no.4
    • /
    • pp.265-270
    • /
    • 2017
  • PURPOSE. This study is to evaluate the internal fit of the crown manufactured by CAD/CAM milling method and 3D printing method. MATERIALS AND METHODS. The master model was fabricated with stainless steel by using CNC machine and the work model was created from the vinyl-polysiloxane impression. After scanning the working model, the design software is used to design the crown. The saved STL file is used on the CAD/CAM milling method and two types of 3D printing method to produce 10 interim crowns per group. Internal discrepancy measurement uses the silicon replica method and the measured data are analyzed with One-way ANOVA to verify the statistic significance. RESULTS. The discrepancy means (standard deviation) of the 3 groups are $171.6\;(97.4){\mu}m$ for the crown manufactured by the milling system and 149.1 (65.9) and $91.1\;(36.4){\mu}m$, respectively, for the crowns manufactured with the two types of 3D printing system. There was a statistically significant difference and the 3D printing system group showed more outstanding value than the milling system group. CONCLUSION. The marginal and internal fit of the interim restoration has more outstanding 3D printing method than the CAD/CAM milling method. Therefore, the 3D printing method is considered as applicable for not only the interim restoration production, but also in the dental prosthesis production with a higher level of completion.

CAD/CAM fabricated complete denture using 3D face scan: A case report (3D face scan을 이용한 CAD/CAM 제작 의치 증례)

  • Eom, Dae-Young;Leesungbok, Richard;Lee, Suk-Won;Park, Su-Jung;Ahn, Su-Jin
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.55 no.4
    • /
    • pp.436-443
    • /
    • 2017
  • In the past, computer-aided design / computer-aided manufacturing (CAD/CAM) technology was the closed system that users had to use the components of only one manufacturer. At present, it has changed to the open system with the flexibility to select and use the components of various manufacturers' components according to their needs. Despite the development of dental materials and prostheses manufacturing methods, denture manufacturing has followed conventional manufacturing methods for nearly 100 years. However, studies on CAD/CAM fabricated denture have been recently carried out to overcome the disadvantages of conventional denture manufacturing. Some commercialized products using milling or 3D printing have already been applied clinically. This case report confirms the possibility of CAD/CAM dentures using 3D face scan and compared them to conventionally fabricated dentures.

A Comparative Analysis of the Different between CLO 3D Avatar Sizing and Actual Body Measurement Shapes (CLO 3D 아바타 사이징과 실제인체간의 치수 및 형태 차이 비교 분석)

  • Lee, Min-Jeong;Sohn, Hee-Soon
    • Journal of Fashion Business
    • /
    • v.16 no.4
    • /
    • pp.137-151
    • /
    • 2012
  • This study aims to use the avatar sizing system of the 3D apparel CAD program instead of the existing 3D body scanners, and to commercialize 3D personal avatars. Towards these ends, the study examined a difference between a 3D avatar and actual body was determined to verify the 3D avatar sizing system. For the experiment, three subjects were selected, were measured as they were, and were made to undergo 3D body scanning and photographing. Then, using avatar sizing system on the 3D apparel CAD program, three types of virtual bodies, namely 3D avatars. The 3D avatar and actual body measurements were compared, and 3D avatars and 3D body-scanned shapes were likewise compared. As a result, the three types of actual bodies and their 3D avatars that were created based on the sizing system of the 3D apparel CAD program were overall similar. but, the thin body-YY type and the normal body-A type were different from their avatars. In the case of type B, who had a bulging abdomen, the 3D avatar was bigger than the actual body as measured. Also, in all body shapes, the girths around the chest, waist and abdomen were produced with exaggerated muscular amounts compared to their actual muscular amounts.

Usability Improvement of BIM for Construction Projects Using Active BIM Functions (능동형 BIM 체계에 의한 토목 및 건축분야 BIM 활용성 개선 연구)

  • Kang, Leen-Seok;Moon, Hyun-Seok;Kim, Hyeon-Seung;Kwak, Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.74-83
    • /
    • 2013
  • Most current BIM systems are focused on the visual information of work status in the design and construction stages. In a passive BIM system, 3D CAD tool can visualize the interference elements of design drawings, however, it cannot suggest a solution to solve the interference status. And 4D CAD tool in the construction stage can simulate the appearance of each activity by construction schedule, however, it cannot suggest an optimized schedule plan considering specified schedule condition of the project. Recently, many organizations need BIM solutions that can improve the work status beyond the level of simple visual information from BIM system. Active BIM system can provide the solutions to the project manager. This study suggests active BIM functions for the solutions and attempts to develop a 4D CAD engine to validate the usability of the functions.