References
- 김현승.문현석.최광열.김창학.강인석 (2012). "건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축." 한국건설관리학회 논문집, 제13권 제2호, 한국건설관리학회, pp. 11-24 https://doi.org/10.6106/KJCEM.2012.13.2.011
- 박찬식.박희택 (2010). "시공성 분석업무 개선을 위한 BIM 기술의 적용방안." 한국건설관리학회 논문집, 제11권 제2호, 한국건설관리학회, pp. 137-146 https://doi.org/10.6106/KJCEM.2010.11.2.137
- Akinci, B., Fischer, M., and Kunz, J. (2002). "Automated Generation of Work Spaces Required by Construction Activities."Journal of Construction Engineering and Management, 128(4), pp. 306-315 https://doi.org/10.1061/(ASCE)0733-9364(2002)128:4(306)
- Alan, Russell., Sheryl, Staub-French., Ngoc, Tran., and William, Wong. (2009). "Visualizing high-rise building construction strategies using linear scheduling and 4D CAD."Automation in Construction, 18(2), pp. 219-236 https://doi.org/10.1016/j.autcon.2008.08.001
- Ashwin, Mahalingam., Rahul, Kashyap., and Charudatta, Mahajan. (2010). "An evaluation of the applicability of 4D CAD on construction projects." Automation in Construction, 19, pp. 148-159 https://doi.org/10.1016/j.autcon.2009.11.015
- Chin, S. Y., Yoon, S. W., Choi, C. H., and Cho, C. Y. (2008)."RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings." Journal of Computing in Civil Engineering, 22(2), pp. 74-89 https://doi.org/10.1061/(ASCE)0887-3801(2008)22:2(74)
- Dawood, N., and Mallasi, Z. (2006). "Construction Workspace Planning: Assignment and Analysis Utilizing 4D Visualization Technologies." Computer-Aided Civil and Infrastructure Engineering, 121, pp. 498-513
- Hartmann, Timo. Gao, Ju., and Fischer. Martin. (2008). "Areas of Application for 3D and 4D Models on Construction Projects." Journal of Construction Engineering & Management, 134(10), pp. 776-785 https://doi.org/10.1061/(ASCE)0733-9364(2008)134:10(776)
- Kang, L. S., Moon, H. S., Park, S. Y., Kim, C. H. (2013). "Improved 4D CAD System for Visualizing Construction Work by Using WBS as Interface Code."KSCE Journal of Civil Engineering, 14(6), pp. 803-814
- Kang, L. S., Moon, H. S., Dawood, N., and Kang, M. S. (2010). "Development of Methodology and Virtual System for Optimized Simulation of Road Design Data."Automation in Construction, 19(8), pp. 1000-1015 https://doi.org/10.1016/j.autcon.2010.09.001
- Senouci, A. B., and Eldin, N. N. (2004). "Use of Genetic Algorithms in Resource Scheduling of Construction Projects."Journal of Construction Engineering and Management, 130(6), pp. 869-877 https://doi.org/10.1061/(ASCE)0733-9364(2004)130:6(869)
- Tantisevi, K., and Akinci, B. (2007). "Automated generation of workspace requirements of mobile crane operations to support conflict detection." Automation in Construction, Vol.16, No.3, pp. 262-276 https://doi.org/10.1016/j.autcon.2006.05.007
Cited by
- A Study on 3D Indoor mapping for as-built BIM creation by using Graph-based SLAM vol.17, pp.3, 2016, https://doi.org/10.6106/KJCEM.2016.17.3.032
- An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project vol.17, pp.4, 2016, https://doi.org/10.6106/KJCEM.2016.17.4.103
- Development of Parametric BIM Libraries for Civil Structures using National 2D Standard Drawings vol.15, pp.4, 2014, https://doi.org/10.6106/KJCEM.2014.15.4.128
- Workspace Generation and Interference Optimization Algorithm by Work-type using 3D Model Object in a Construction Project vol.34, pp.6, 2014, https://doi.org/10.12652/Ksce.2014.34.6.1911