• Title/Summary/Keyword: 4:2:1 Allocation Plan

Search Result 39, Processing Time 0.022 seconds

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

Analytical Study for the Plan of Unit Household in National Housing Scale - Oriented on the cases of Korea housing corporation since 2005 ; Focused on analysing area (국민주택규모 단위세대 평면 분석 연구 - 2005년 이후 대한주택공사 사례를 면적분석 중심으로 -)

  • Lee, Jeong-Ho;Lee, Chan
    • Korean Institute of Interior Design Journal
    • /
    • v.19 no.1
    • /
    • pp.180-189
    • /
    • 2010
  • Since collective houses are started to be supplied, the housing market has been transformed from supplier to demander oriented, and various type with same area of unit households have been deigned and started to be distributed. It can be expected that such transfer phenomenon would be continuously sped-up, and unit household will be more subdivided and varied. Thus, we analysed and studied the planes with subject of unit households in national housing scale ($85m^2$) that is treated as supply standard and has biggest volume in construction by Korean housing corporation. The analysing method is investigating the area of each room within unit household, calculating their minimum, maximum, and average values, studying the efficiency of unit household plane according to the structure of each room by comparative analysis these values, and analysing changing matter by investigating any change of each room area. The analysing results of which are followings. At first, number of BAY on face is increasing. Second, allocation of each room has been vary. Third, area ratio among bedroom1, livingroom, diningroom/kitchen become similar. Fourth, the area of diningroom/kitchen become somewhat bigger. Fifth, the space for passage way is efficiently allocated. Sixth, service area is reduced, Seventh, stereotyped phenomenon Is appeared. Based on many studies so far, any improvements of unit householder in national housing scale are followings. First, in terms of forming style, unit householder in national housing scale is unfolded in various way though, the form of each room is not more than typical style. Second, it shows stereotyped phenomenon. Especially, bathroom 1, 2 show stereotyped feature in terms of their type and area across entire research years, also LDK allocation method is stereotyped, as well as stereotyped trend in bedroom 2, 3, allocation for 4 BAY type.

Asset Allocation Strategies for Long-Term Investments

  • Kim, Chang-Soo;Shin, Taek-Soo
    • The Korean Journal of Financial Management
    • /
    • v.25 no.4
    • /
    • pp.145-182
    • /
    • 2008
  • As the life expectancy increases resulting in the aged society, the post-retirement life became one of the most important concerns of people. The long-term investment vehicles such as retirement savings and pension plans have been introduced to meet such demand of society. This paper examines the impact of asset allocation strategies on the long-term investment performance. Because of the unusually long investment horizon and the compounding effect, a suboptimal asset mix in a retirement plan can be a very costly and irreversible mistake. Instead of relying on anecdotal evidence to evaluate the merits of different allocation strategies, this paper performs various tests including stochastic dominance tests using both actual data and Monte Carlo simulated data that best fit the historical experience. The results indicate 1) the long-term investments perform better than the short-term investments, 2) the optimal asset allocation strategy for the long-term investments should be highly equity dominated.

  • PDF

A Study on Optimal Design of Accelerated Life Tests (가속수명시험의 최적 설계)

  • Jeong, Hai-Sung
    • Journal of Applied Reliability
    • /
    • v.7 no.2
    • /
    • pp.57-72
    • /
    • 2007
  • This paper suggests an approach for using ALTA 7 PRO to design accelerated life test plans. Conducting a accelerated life test requires finding life distributions at different stress levels and determining an appropriate life-stress relationship. Moreover, a test plan needs to be developed. In its optimal test plan, stress levels are determined and the proportions of test units are assigned at each stress level so that asymptotic variance of the maximum likelihood estimate of a (log) percentile of the life distribution at the design stress is minimized. Examples are presented for usage.

  • PDF

Pension Risk Analysis in DC plans using Stochastic Simulation (시뮬레이션을 활용한 DC형 퇴직연금의 Pension Risk 분석)

  • Han, Jong-Hyun;Sung, Joo-Ho;Seo, Dong-Won
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.4
    • /
    • pp.163-170
    • /
    • 2014
  • This study calculates the employee receives severance pay scale are paid from the company in the DC system. In addition, by utilizing the reserve growth model were studied in accordance with shortfall risk levels generated by stochastic asset allocation. For the analysis, from 2004 to 2013 using the KOSPI returns and total bond yields were simulated. Scenario 1 is when compared to the severance reserve is insufficient. Scenario 2 is the same as if toy reserve this severance pay. During one period, depending on the asset allocation of stocks and bonds was confirmed that the probability pension risk does not occur. And we suggest that members of DC pension risk endeavor with the government and companies to avoid.

A Study of Policy Change on K-ETS and its Objective Conformity (한국 배출권거래제 정책 변동의 목적 부합성 연구)

  • Oh, Il-Young;Yoon, Young Chai
    • Journal of Climate Change Research
    • /
    • v.9 no.4
    • /
    • pp.325-342
    • /
    • 2018
  • The Korea Emissions Trading Scheme ( K-ETS), which manages roughly 70% of the greenhouse gas emissions in South Korea, was initiated in 2015, after implementation of its 1st basic plan and the 1st allocation plan (2014) for the 1st phase (2015-2017). During the three and a half years since the launch of K-ETS, there have been critical policy change such as adjustment of the institutions involved, development and revision of the 2030 national GHG reduction roadmap, and change in the allocation plans. Moreover, lack of liquidity and fluctuation of carbon prices in the K-ETS market during this period has forced the Korean government to adjust the flexibility mechanism and auction permits of the market stability reserve. To evaluate the policy change in the K-ETS regarding conformance to its objectives, this study defines three objectives (Environmental Effectiveness, Cost Effectiveness and Economic Efficiency) and ten indicators. Evaluation of Environmental Effectiveness of K-ETS suggests that the national GHG reduction roadmap, coverage of GHG emitters and credibility of MRV positively affect GHG mitigation. However, there was a negative policy change implemented in 2017 that weakened the emission cap during the 1st phase. In terms of the Cost Effectiveness, the K-ETS policies related to market management and flexibility mechanism (e.g. banking, borrowing and offsets) were improved to deal with the liquidity shortage and permit price increase, which were caused by policy uncertainty and conservative behavior of firms during 2016-2018. Regarding Economic Efficiency, K-ETS expands benchmark?based allocation and began auction-based allocation; nevertheless, free allocation is being applied to sectors with high carbon leakage risk during the 2nd phase (2018-2020). As a result, it is worth evaluating the K-ETS policies that have been developed with respect to the three main objectives of ETS, considering the trial?and?error approach that has been followed since 2015. This study suggests that K-ETS policy should be modified to strengthen the emission cap, stabilize the market, expand auction-based allocation and build K-ETS specified funds during the 3rd phase (2021-2025).

Analysis of the Impact of Key Design Elements for the EU-ETS Phase 4 on the K-ETS in the Future (EU ETS 4기의 주요 제도 설계가 향후 국내 배출권거래제 운영에 미칠 영향 분석)

  • Son, Insung;Kim, Dong Koo
    • Environmental and Resource Economics Review
    • /
    • v.30 no.1
    • /
    • pp.129-167
    • /
    • 2021
  • The emission trading system is an essential policy for reducing greenhouse gas emissions and converting low-carbon society. EU ETS is a good benchmark that is ahead of Korea's emission trading system in terms of operating period and design know-how. Therefore, this study focused on the key design elements of EU ETS phase 4 such as total emission allowances issued (Cap), free allocation method, carbon leakage list, market stability reserve, and innovation supporting system. In addition, we analyzed the impact of key design elements and their changes during EU ETS Phase 1 to 4 on the design and operation of Korea emission trading system in the future. First of all, the expected impact on the design of Korea emission trading system is to increase three demands: preparing benchmark renewal plans, establishing criteria for selecting free allocation industries that reflect domestic industrial structure and characteristics and introducing two-stage evaluations for free allocation industries, and preparing specific plan to support innovation and industries using allowance auction revenues. The next three impacts on the operation of Korea emission trading system are the increased needs for objective and in-depth impact assessment of plan and amendments, provision of system stability and response opportunities by quickly confirming plan and amendments prior to the implementation, and coordination of the emission trading system governance and stakeholder participation encouragement.

Quitline Activity in Rajasthan, India

  • Gupta, Rakesh;Verma, Vinit;Mathur, Pankaj
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.17 no.sup2
    • /
    • pp.19-24
    • /
    • 2016
  • Quitline activity in Rajasthan, India is a voluntary activity of Rajasthan Cancer Foundation (RCF) since April 2013. To kick-off, it took the benefit of the State Government- PIRAMAL SWASTHYA (PS)1 collaborative 104 Health Information Helpline that existed already in public-private partnership. It is a reactive quitline that helps callers through the counselors and nursing staff trained specifically through the weekly sessions held by the first author, the RCF resource on quitline. Besides structuring of the scripts for primary intervention and follow-ups after 1 week, 1 month, 6 months and a year, he also monitors calls, advices and coordinates with the supervisors to manage and analyze the data base, and reports to the PS lead at the Jaipur Center on overall performance and to plan strategic communication with the State Government on its outcomes. The quitline has limitations of its informal existence through a voluntary effort of RCF, no specific resource allocation, suboptimal data management, minimal awareness in the masses due to poor IEC (Information, Education and Communication; except its efforts made by RCF in last 1 year through the government-run State TV and City Radio) and staff shortage and its attrition due to lack of plan for career advancement. Despite these challenges in the year 2013, the quit line has registered a quit rate (for complete abstinence) of 19.93% amongst 1525 callers. The quit rate were 58.01% (304/ 524) among the responders at the 3rd follow-up at 18 months (in September 2014)2. In view of an increase in quit rate by 5- 9 times over the prevailing quit rate in the former ever daily users [both smokers and the users of smokeless tobacco (SLT)], efforts are being made by RCF in concurrence with PS to have this cost-effective model established formally with optimal resource allocation in collaboration with willing agencies (the State and Central Governments and the International Quitline Agencies) and its replication in 4 more states where PS is collaborating with the respective state governments similarly (Assam, Chhattisgarh, Jharkhand and Karnataka).

A Study on the Effective Health Examination Center Distribution and Space Coordination using Agent based Model (행위자 기반 모형을 활용한 효율적 검진센터 서비스배분 및 공간조정에 관한 연구)

  • Kim, Suktae;Hong, Sachul
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.24 no.2
    • /
    • pp.15-25
    • /
    • 2018
  • Purpose: The important things in space plan of a screening center are improving the spatial awareness by space systemization and minimizing the examination time for customers, and reducing the required time of screening work and maximizing the capacity for the screening center. Therefore, we tried to solve the problem of improving spatial awareness and reducing the examination time by using the pedestrian based discrete event simulation at the minimum cost. Methods: We have analyzed the drawbacks and the supplement points by comparing the floor plan at the time of opening and the current floor plan. Based on the analysis, we propose an improved plan which changes the location of the examination rooms and the number of services, and we also verify the improved plan based on simulation analyses. Results: 1) Through the analyses, we derived the drawbacks of the floor plan at the time of opening, and we realized that the current floor plan reflects the drawbacks. 2) The major reasons of the long examination time are the human traffic jam and the occurrence of queues due to unreasonable allocation of services. 3) Through the discrete event simulation analyses, it was possible to specify the place of the queues manually so as to use the given space fairly. 4) Using the discrete event simulation, it was possible to reduce the examination time and to improve the spatial awareness effectively at the minimum cost. Implications: Although the proposed simulation methodology in this paper is an analysis of the existing screening center, we expect that the proposed methodology will be used to develop a more efficient architectural design process by pre-applying the method to the course of designing a screening center and finding the suitability of the proposed method with the matched number of services.

Analysis of the Construction Plan and Enforcement Condition of the Port Circular Highway for Cargo Transportation of the Pusan Port (부산항 물동량 처리를 위한 광역배후수송도로의 건설계획과 시행실태 분석)

    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.313-322
    • /
    • 1999
  • Pusan the principal port of South Korea, has opened its door since 1876. Currently, the four-stage port construction project is under way to handle ever-growing marine transportation volume. While the port unloading capabilities are increasing the infrastructure to deal with all the transportation volume failed to catch up with them. Accordingly the city had to suffer from worst traffic congestion on due to the increasing container traffic volume causing logistical costs to rise. This study was designed to inspect the enforcement of infrastructure construction plan and suggest systematical and effective ways to improve the plan. The study focused on :\circled1The decision-making procedure, \circled2Financial resource for the plan, \circled3Effectiveness of the project enforcement, and \circled4Who will be in charge of the project. As a result from the study, these followings were suggested to improve the plan. First, Pusan Port Infrastructure consisting of (Inter-city Free way, Belt Highway and Outer Highway) should be immediately legally-regulation project. Second, the method to finance the project should be deter-mined and investment consultation among the central government the city government and private sector should be also made. Measures to make the central government budget allocation for the project mandatory should be discussed. Third, Effectiveness of the project can be doubled by gradually or partialyl opening the routes based on long-term or short-term operating plans. Fourth, The organizer of the project should be appointed, or a special task-force team in charge of the plan can be formed.

  • PDF