• Title/Summary/Keyword: 3D spatial data

Search Result 849, Processing Time 0.024 seconds

D4AR - A 4-DIMENSIONAL AUGMENTED REALITY - MODEL FOR AUTOMATION AND VISUALIZATION OF CONSTRUCTION PROGRESS MONITORING

  • Mani Golparvar-Fard;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.30-31
    • /
    • 2009
  • Early detection of schedule delay in field construction activities is vital to project management. It provides the opportunity to initiate remedial actions and increases the chance of controlling such overruns or minimizing their impacts. This entails project managers to design, implement, and maintain a systematic approach for progress monitoring to promptly identify, process and communicate discrepancies between actual and as-planned performances as early as possible. Despite importance, systematic implementation of progress monitoring is challenging: (1) Current progress monitoring is time-consuming as it needs extensive as-planned and as-built data collection; (2) The excessive amount of work required to be performed may cause human-errors and reduce the quality of manually collected data and since only an approximate visual inspection is usually performed, makes the collected data subjective; (3) Existing methods of progress monitoring are also non-systematic and may also create a time-lag between the time progress is reported and the time progress is actually accomplished; (4) Progress reports are visually complex, and do not reflect spatial aspects of construction; and (5) Current reporting methods increase the time required to describe and explain progress in coordination meetings and in turn could delay the decision making process. In summary, with current methods, it may be not be easy to understand the progress situation clearly and quickly. To overcome such inefficiencies, this research focuses on exploring application of unsorted daily progress photograph logs - available on any construction site - as well as IFC-based 4D models for progress monitoring. Our approach is based on computing, from the images themselves, the photographer's locations and orientations, along with a sparse 3D geometric representation of the as-built scene using daily progress photographs and superimposition of the reconstructed scene over the as-planned 4D model. Within such an environment, progress photographs are registered in the virtual as-planned environment, allowing a large unstructured collection of daily construction images to be interactively explored. In addition, sparse reconstructed scenes superimposed over 4D models allow site images to be geo-registered with the as-planned components and consequently, a location-based image processing technique to be implemented and progress data to be extracted automatically. The result of progress comparison study between as-planned and as-built performances can subsequently be visualized in the D4AR - 4D Augmented Reality - environment using a traffic light metaphor. In such an environment, project participants would be able to: 1) use the 4D as-planned model as a baseline for progress monitoring, compare it to daily construction photographs and study workspace logistics; 2) interactively and remotely explore registered construction photographs in a 3D environment; 3) analyze registered images and quantify as-built progress; 4) measure discrepancies between as-planned and as-built performances; and 5) visually represent progress discrepancies through superimposition of 4D as-planned models over progress photographs, make control decisions and effectively communicate those with project participants. We present our preliminary results on two ongoing construction projects and discuss implementation, perceived benefits and future potential enhancement of this new technology in construction, in all fronts of automatic data collection, processing and communication.

  • PDF

Development of a Quality Check Algorithm for the WISE Pulsed Doppler Wind Lidar (WISE 펄스 도플러 윈드라이다 품질관리 알고리즘 개발)

  • Park, Moon-Soo;Choi, Min-Hyeok
    • Atmosphere
    • /
    • v.26 no.3
    • /
    • pp.461-471
    • /
    • 2016
  • A quality check algorithm for the Weather Information Service Engine pulsed Doppler wind lidar is developed from a view point of spatial and temporal consistencies of observed wind speed. Threshold values for quality check are determined by statistical analysis on the standard deviation of 3-component of wind speed obtained by a wind lidar, and the vertical gradient of horizontal wind speed obtained by a radiosonde system. The algorithm includes carrier-to-noise ratio (CNR) check, data availability check, and vertical gradient of horizontal wind speed check. That is, data sets whose CNR is less than -29 dB, data availability is less than 90%, or vertical gradient of horizontal wind speed is less than $-0.028s^{-1}$ or larger than $0.032s^{-1}$ are classified as 'doubtful', and flagged. The developed quality check algorithm is applied to data obtained at Bucheon station for the period from 1 to 30 September 2015. It is found that the number of 'doubtful' data shows maxima around 2000 m high, but the ratio of 'doubtful' to height-total data increases with increasing height due to atmospheric boundary height, cloud, or rainfall, etc. It is also found that the quality check by data availability is more effective than those by carrier to noise ratio or vertical gradient of horizontal wind speed to remove an erroneous noise data.

Sub-surface imaging and vector precision from high resolution down-hole TEM logging

  • Chull, James;Massie, Duncan
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2005.09a
    • /
    • pp.11-18
    • /
    • 2005
  • Filament inversion routines are highly effective for target definition whenever total-field DHTEM vectors can be obtained using three-component logging tools. However most cross-hole components contain significant noise related to sensor design and errors in observation of probe rotation. Standard stacking methods can be used to improve data quality but additional statistical methods based on cross-correlation and spatial averaging of orthogonal components may be required to ensure a consistent vector migration path. Apart from assisting with spatial averaging, multiple filaments generated for successive time-windows can provide additional imaging information relating to target geometry and current migration. New digital receiver systems provide additional time-windows to provide better tracking options necessary for high-resolution imaging of this type.

  • PDF

Epipolar Resampling from Kompsat-2 and Kompsat-3 (아리랑 위성 2호와 3호를 이용한 이종 영상 간 에피폴라 영상 생성)

  • Song, Jeong-Heon;Oh, Jae-Hong
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.17 no.4
    • /
    • pp.156-166
    • /
    • 2014
  • As of 2014, KARI (Korea Aerospace Research Institute) operates two high-resolution satellites such as Kompsat-2 and Kompsat-3. Kompsat-3 has capability of in-track stereo images acquisition but it is quite limited because the stereo mode lowers the spatial coverage in a trajectory. In this paper we analyze the epipolar geometry from the heterogeneous Kompsat-2 and Kompsat-3 image combination to epipolar resample them for 3D spatial data acquisition. The analysis was carried out using the piecewise approach with RPCs (Rational Polynomial Coefficients) and the result showed the parabolic epipolar curve pattern. We also concluded that the third order polynomial transformation is required for epipolar image resampling. The resampled image pair showed 1 pixel level of y-parallax and can be used for 3D display and digitizing.

the fusion of LiDAR Data and high resolution Image for the Precise Monitoring in Urban Areas (도심의 정밀 모니터링을 위한 LiDAR 자료와 고해상영상의 융합)

  • 강준묵;강영미;이형석
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.04a
    • /
    • pp.383-388
    • /
    • 2004
  • The fusion of a different kind sensor is fusion of the obtained data by the respective independent technology. This is a important technology for the construction of 3D spatial information. particularly, information is variously realized by the fusion of LiDAR and mobile scanning system and digital map, fusion of LiDAR data and high resolution, LiDAR etc. This study is to generate union DEM and digital ortho image by the fusion of LiDAR data and high resolution image and monitor precisely topology, building, trees etc in urban areas using the union DEM and digital ortho image. using only the LiDAR data has some problems because it needs manual linearization and subjective reconstruction.

  • PDF

Study on the Development of Open Interfaced Geospatial Information Service Platform (개방형 인터페이스 기반 국토정보 서비스 플랫폼 개발 연구)

  • Chang, Yoon-Seop;Kim, Jae-Chul;Choi, Won-Geun;Kim, Kyung-Ok
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.1
    • /
    • pp.17-24
    • /
    • 2009
  • Recently many of earlier GIS services are changing to the form of user-participated dynamic geoweb service like many new impressive web 2.0 services substitute for earlier old-fashioned web 1.0 services. Many relevant technologies are necessary to be developed so as to integrate a number of geospatial data and functions all around into the useful geoweb services. It is also necessary to make the integration easy and to cope with the rapid changes in geoweb environment. In this study, the trend of relevant geoweb technologies were reviewed before, and the development of open geospatial service platform were carried out. As a result, open 2D/3D map service engine, user-participated mashup engine, Open API search engine and so on were im plemented as the core components of that platform. The platform will be able to be used as the common platform among a number of applications in the fields such as public/private GIS integration, u-city projects and GIS/LBS services etc.

  • PDF

Spatiotemporal Routing Analysis for Emergency Response in Indoor Space

  • Lee, Jiyeong;Kwan, Mei-Po
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.6
    • /
    • pp.637-650
    • /
    • 2014
  • Geospatial research on emergency response in multi-level micro-spatial environments (e.g., multi-story buildings) that aims at understanding and analyzing human movements at the micro level has increased considerably since 9/11. Past research has shown that reducing the time rescuers needed to reach a disaster site within a building (e.g., a particular room) can have a significant impact on evacuation and rescue outcomes in this kind of disaster situations. With the purpose developing emergency response systems that are capable of using complex real-time geospatial information to generate fast-changing scenarios, this study develops a Spatiotemporal Optimal Route Algorithm (SORA) for guiding rescuers to move quickly from various entrances of a building to the disaster site (room) within the building. It identifies the optimal route and building evacuation bottlenecks within the network in real-time emergency situations. It is integrated with a Ubiquitous Sensor Network (USN) based tracking system in order to monitor dynamic geospatial entities, including the dynamic capacities and flow rates of hallways per time period. Because of the limited scope of this study, the simulated data were used to implement the SORA and evaluate its effectiveness for performing 3D topological analysis. The study shows that capabilities to take into account detailed dynamic geospatial data about emergency situations, including changes in evacuation status over time, are essential for emergency response systems.

A Study on Airborne LiDAR System Calibration and Accuracy Evaluation (항공LiDAR 시스템 검정 및 정확도 평가 연구)

  • Choi, Yun-Soo;Kong, In-Ku;Lee, Kang-Won
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.4
    • /
    • pp.359-366
    • /
    • 2005
  • Airborne LiDAR integrated with on-board GPS/INS and scanning technology is a state-of the-art system for direct 3D geo-spatial data acquisition. In this study, LiDAR data were calibrated using ground points in calibration site for the higher system accuracy. The accuracy results are ${\pm}15{\sim}30\;cm$ in horizontal and ${\pm}15\;cm$ in vertical. The results show that LiDAR system has capability for precise DEM and contour generation, 3D urban modeling and engineering design.

The Application of Geospatial Information Acquisition Technique and Civil-BIM for Site Selection (지형공간정보취득기술과 토목BIM을 활용한 부지선정 연구)

  • Moon, Su-Jung;Pyeon, Mu-Wook;Park, Hong-Gi;Ji, Jang-Hun;Jo, Jun-Ho
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.28 no.6
    • /
    • pp.579-586
    • /
    • 2010
  • Due to the recent development of measuring technology and 3D programs, it has become possible to obtain various spatial data. This study utilizes the 2-dimensional data and 3-dimensional data extraction technology based on the existing empirical and statistical DB. The data obtained from geospatial data technology are integrated with civil engineering BIM to conduct the modeling of the topography of the target region and select the optimum location condition by using the cut and fill balance of the volume of earth. The target area is the land around Tamjin River, Jangheong-gun, Jeolla-do. The 3-dimensional topology linked with 3-dimensional mapping technology by using the orth-image and aerial LiDAR that uses aerial photo of the target area is visualized with Civil3D of AutoDesk. By using Civil3D program, the Thanks to the recent development of measuring technology and 3D programs, target area is analyzed through visualization and related data can be obtained for analysis. The method of using civil engineering BIM enables to obtain various and accurate information about the target area which is helpful for addressing the issues risen from the existing methodology. In this regard, it aims at searching for the alternatives and provides suggestions to utilize the information.

Power based scheduling for Collaborative MIMO system (Collaborative MIMO 시스템을 위한 전력기반 스케줄링 방식)

  • Kim, Young-Joon;Lee, Jung-Seung;Baik, Doo-Kwon
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.12A
    • /
    • pp.1209-1216
    • /
    • 2008
  • In order to maximize spectrum efficiency and data rate MIMO(Multiple Input Multiple Output) is adopted to wireless system. OFDM-based WiMAX and LTE accommodate MIMO as mandatory technology. STC(Space Time Coding) and SM(Spatial Multiplexing) are used in downlink while in uplink C-MIMO(Collaborative MIMO) is used to improve data throughput. In this paper conventional pairing schemes, RPS(Random Pairing Scheduling) and DPS(Determinant Pairing Scheduling) are analyzed. From the analysis the performance of DPS algorithm is better than that of RPS because DPS measures orthogonal factor between paired users. However, there are potential problems such as hardware complexity and performance. To overcome the issues Power-Based Scheduling(PBS) algorithm is proposed for C-MIMO. PBS can provide higher performance compared to RPS and dramatically reduce hardware complexity compared to DPS