• Title/Summary/Keyword: 3D drawings

Search Result 207, Processing Time 0.025 seconds

Efficiency Improvement Plan for Output Management at the Design Phase in BIM-Based Projects (국내 BIM 기반 건설 프로젝트에서의 설계단계 성과물 작성 효율화 방안에 관한 연구)

  • Kim, Ki-Nam;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.261-264
    • /
    • 2010
  • As construction projects get bigger and more complex, communication and information flow among participants become key success factors of a project. Accordingly, construction projects to respond to these changes being made in the introduction of BIM (Building Information Modeling). But as 2D drawings are still to be widely used in practical fields, it is very important that 2D drawing information could be easily and clearly projected from 3D BIM data. In this study suggest that efficiency of design phase in BIM-based construction projects for can cause confusion and additional work in traditional to BIM.

  • PDF

Artificial Intelligence Image Segmentation for Extracting Construction Formwork Elements (거푸집 부재 인식을 위한 인공지능 이미지 분할)

  • Ayesha Munira, Chowdhury;Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.12 no.1
    • /
    • pp.1-9
    • /
    • 2022
  • Concrete formwork is a crucial component for any construction project. Artificial intelligence offers great potential to automate formwork design by offering various design options and under different criteria depending on the requirements. This study applied image segmentation in 2D formwork drawings to extract sheathing, strut and pipe support formwork elements. The proposed artificial intelligence model can recognize, classify, and extract formwork elements from 2D CAD drawing image and training and test results confirmed the model performed very well at formwork element recognition with average precision and recall better than 80%. Recognition systems for each formwork element can be implemented later to generate 3D BIM models.

A Study of Implementation of Defense Configuration Management System based on PLM (PLM 기반의 국방 형상관리 정보체계 구축 사례연구)

  • Lim, Chae-O
    • Korean Journal of Computational Design and Engineering
    • /
    • v.13 no.4
    • /
    • pp.305-313
    • /
    • 2008
  • A configuration management system was implemented by applying PLM to the defense field. The PLM system has recently been incorporated in a wide range of industries, and it has allowed for improvements in work productivity and expansion of related services by comprehensively managing and securing connection regarding configuration information in the defense field. Implementations include acquisition of configuration related information and reinforcement of BOM-oriented configuration management function, securing compatibility among 3D drawings of different agencies, improvement of drawing and document management functions, comprehensive systematic configuration management focused on product structure, strengthened configuration control functions, a management system according to the work flow and life cycle functions, an integrated configuration management system of 3D model CAD resources and an enhanced management system. This paper covers a case study reviewing the implementation of a PLM-based configuration management information system and its results, so that the information can be made available to other agencies and companies seeking to apply PLM in their organizations.

Development of Plastic Injection Mold Design System on the CAD Environment (캐드 환경에서 플라스틱 사출 금형 설계 시스템의 개발)

  • ;K. K. Wang
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.15 no.2
    • /
    • pp.68-74
    • /
    • 1998
  • In this work, we have been concerned with developing an intelligent mold design system for plastic injection molding on the AutoCAD. We have concentrated on building a viable environment, including a mold parts database and a menu-driven user interface. This provides a more interactive and interface for selection of optimal mold-base and mold parts in mold design system. This work presents a method which allows the designer to select the mold parts and mold-base directly within an AutoCAD environment. It can also automatically generate detailed 3D drawings of the mold parts and mold-base. The system shows its potential capability for future enhancement. Since the system is independent of the data, it could easily be extended to other mold-bases and mold parts. In addition, it can be linked to the molding analysis system by creating subtracted 3-D models.

  • PDF

Applying the Cloud Computing Technology for Mobile BIM based Project Management Information System (모바일 BIM 공사관리시스템을 위한 클라우드 컴퓨팅 기술 활용 방안)

  • Lee, Jong-Ho;Eom, Shin-Jo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.145-148
    • /
    • 2011
  • As a futuristic construction model, building information model(BIM) based project management system(PMIS) and mobile PMIS have been showing visible sign. However, researches on the 3D BIM based PMIS using mobile device are hard to find, result from limitation of mobile device application(slow speed at huge BIM file, display size, and etc.) and undefined standard of business processes. Therefore, this research aims at studying feasibility of mobile BIM PMIS based on cloud computing as a business model. In case of applying mobile BIM PMIS, 3D drawings and integrated building informations are possible on mobile devices in real time. it would support increasing the productivity of project participants as designer, engineer, supervisor, and etc. Globally, BIM based PMIS and Mobile BIM system, cloud computing based mobile BIM simulator are in the concept or experimental phase, therefore it is possible to secure global leading technology of IT and construction merger in the mobile BIM.

  • PDF

A Study on the Modeling of Three-Dimensional Work Structure Using Web 3D in Cyberspace (Cyberspace에서 Web 3D를 이용한 3차원 공사 구조물 모델링의 활용성 제언)

  • Lee Hui-Chul;Lee Tai-Sik;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2002
  • Complexity in construction projects has increased over the years, which has led to an increase in the number of organizations involved in those projects. In today's environment, these organizations operate in different parts of the world requiring their personnel to be geographically distributed. So, these organizations construct and utilize the information systems. However, looking into this systems' content, those use two-dimensional planes such as pictures and drawings to check the scheduling etc., which cause the defect of communication and problems such as change order. Accordingly, this study introduces the Web 3Ds and 3D Libraries, intends to present the effect on modeling of three-dimensional work structure using Web 3D in cyberspace.

  • PDF

A Study on the Productivity Analysis of 3D BIM-based Fabrication Documents Extraction (3D BIM 기반 철골 제작도면 산출 생산성 분석)

  • Ham, Nam-Hyuk;Yang, Jung-Hye;Yuh, Ok Kyung
    • Journal of KIBIM
    • /
    • v.9 no.3
    • /
    • pp.30-40
    • /
    • 2019
  • Extraction of fabrication documents is very important because it provides information related to tasks of fabrication and construction. Therefore, in the case of a prefabricated member such as a steel structure, it is necessary to improve the productivity of fabrication documents through 3D BIM. However, research and evidence data on direct comparison analysis of 3D BIM-based documents extraction versus 2D CAD-based documents extraction are hard to find. Thus, this study focuses on productivity analysis of 3D BIM based fabrication documents extraction. In this study, the productivity data of fabrication documents extraction for module construction of EPC project was analyzed. For the productivity analysis, a case study on the fabrication documents of Module A (1,965 sheets) and Module B (1,216 sheets) was conducted. Fabrication documents for each module include general arrangement drawing, assembly drawing, single part drawing and single plate drawing. Comparison of 2D CAD based fabrication documents extraction and 3D BIM based fabrication documents extraction, the productivity for the entire work was improved from 17 hours to 16 hours for Module A and 12 hours to 7 hours for Module B. Especially, the productivity of the assembly drawings, which occupies a large part of the fabrication documents, was improved by about 48.75% from the total time required from 281 hours to 144 hours.

Development of Web-based Sharing System for Inquiring Civil BIM Libraries Based on Standardized 2D Drawings (표준도 기반 BIM 라이브러리 검색지원을 위한 웹기반 공유시스템 개발)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Guen-Ha;Ju, Ki-Beom
    • Journal of KIBIM
    • /
    • v.6 no.1
    • /
    • pp.25-32
    • /
    • 2016
  • In BIM environments for infrastructures, civil structures such as road, bridge and tunnel etc., created into 3D objects, integrated with their properties, securing BIM design productivity is very critical during 3D modeling. To solve this issue, configuring BIM libraries so that the users can utilize prefabricating in advance 3D objects that have been applying repeatedly during BIM design is essential so much. Current BIM libraries have made focused on Ready-Made for architectural facilities. However, establishing environment for delivering BIM library for civil facilities is very sparse. Accordingly, this study developed a web-based sharing system for delivering BIM library contents based on standardized drawing for civil area. To do this, we have analyzed core features and operation system of BIM library sharing system in domestic and overseas. Besides, functional requirements that are necessary for developing BIM library sharing system was derived, and through operation scenario configuration, the web-based system was developed according to the detailed mechanism. It is expected that this system can enhance BIM design productivity during library based modeling, and can be utilized as construction supporting tools that can help construction managers to make a design change.

A Study on the Elements of the Environmentally Friendly Design of the Courtyards in Elementary Schools -Focused on the Open Direction and D/H Ratio- (초등학교 중정공간에서의 친환경요소도입에 관한 연구 -중정의 열린 방위와 D/H비를 중심으로-)

  • Kim, Chan-Ju;Kim, Hak-Rae;Park, Young-Ki
    • KIEAE Journal
    • /
    • v.2 no.3
    • /
    • pp.3-10
    • /
    • 2002
  • The objectives of this research are to find the problems in the courtyards of the elementary schools and to provide the new design guidelines on the environmental design applicable to the court yard of the elementary schools. To analyze the current usage condition of the court yards of the elementary schools, sixty-three elementary schools in Seoul were investigated through the architectural drawings, and then nineteen of them were selected for the detailed investigations. The survey findings testified that the orientation of the courtyard's open direction and D/H ratio would be critically important for the architectural design of the courtyard in elementary schools. From these analyses, the following guidelines would be proposed on the courtyards for the improved elementary school design. Firstly, to increase the environmental condition of the courtyard, the orientation of the courtyard's open side would not be north. Secondly, to make the environmentally friendly courtyard, it is necessary to increase the D/H ratio. Sooner or later, the courtyard of the elementary schools would be introduced very largely. Thus, it is important to figure out the elements of the environmental design of the courtyard in elementary schools. The continuous research on the elements of the environmentally friendly design of the courtyard will provide the proper direction for the better design of the elementary schools.

3-D Information Model for High-speed Railway Infrastructures (고속철도시설물을 위한 3차원정보모델)

  • Shim, Chang-Su;Kim, Deok-Won;Youn, Nu-Ri
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.241-246
    • /
    • 2008
  • Design of a high-speed railway line requires collaboration of heterogeneous application systems and of engineers with different background. Object-based 3D models with metadata can be a shared information model for the effective collaborative design. In this paper, railway infrastructure information model is proposed to enable integrated and inter-operable works throughout the life-cycle of the railway infrastructures, from planning to maintenance. In order to develop the model, object-based 3-D models were built for a 10km railway among Korea high-speed railway lines. The model has basically three information layers for designers, contractors and an owner, respectively. Prestressed concrete box-girders are the most common superstructure of bridges. The design information layer has metadata on requirements, design codes, geometry, analysis and so on. The construction layer has data on drawings, real data for material and products, schedules and so on. The maintenance layer for the owner has the final geometry, material data, products and their suppliers and so on. These information has its own data architecture which is derived from similar concept of product breakdown structure(PBS) and work breakdown structure(WBS). The constructed RIIM for the infrastructures of the high-speed railway was successfully applied to various areas such as design check, structural analysis, automated estimation, construction simulation, virtual viewing, and digital mock-up. The integrated information model can realize virtual construction system for railway lines and dramatically increase the productivity of the whole engineering process.

  • PDF