• Title/Summary/Keyword: 플랜트 시공

Search Result 138, Processing Time 0.02 seconds

Safety Management Factor Analysis of Expert Perceptions Based on 4M Method for Plant Construction Phase (플랜트 시설물 시공단계의 4M기법을 활용한 전문가 인식조사에 의한 안전관리요인 분석)

  • Kim, Kyujin;Choi, Byungsun;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.18-27
    • /
    • 2016
  • The purpose of this study is to classify main risk factors on a construction phase of a plant project and analyze importance by the risk factors. Plant Industry is continuing boom and the increase in overseas plant orders in 2014 has showed a performance increase of 61% of the total orders, as the plant industry are risk factors for the construction phase, safety management target recognition and variety of accident prevention and safety factors by importance, etc. a situation that requires the development and introduction of management. So, it is performed that collected disaster conditions data on a construction phase of a plant project, is questioned by plant construction professional and is classified by 4M. Then, it is performed that is questioned by plant construction and safety professional in order to apply AHP method, and is presented from analyzing the risk factors, which are results of the survey, by importance and priority. This study will recognize from identifying the main risk factors in advance and will be utilized as a basic data is to prevent the risk factors.

A Case Study on Construction Cost Comparison for On-Site Construction and Off-Site Construction of Plant Project (플랜트 건설의 현장시공 및 모듈시공에 대한 공사비 비교 사례연구 - Pipe Rack을 대상으로 공사비 산정 -)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.4
    • /
    • pp.25-34
    • /
    • 2023
  • The purpose of this study is to calculate and compare construction costs for On-Site Construction and Off-Site Construction in Plant Project. For this purpose, the target for calculating the construction cost was limited to the Pipe Rack(Steel Structure and Piping). The results derived according to the purpose of the study are as follows. 1)The direct construction cost for On-Site Pipe Rack construction was KRW 56 billion, with Steel Structure KRW 25.1 billion and Piping KRW 30.8 billion won. 2)Comparing the rate of change between On-Site Construction and Off-Site Construction, material costs increased by 1.9% and expenses by 192.1%, but labor costs decreased by -9.1%, resulting in a total direct construction cost increase of 8.4%. These results can be used as reference data to check the current status of the increase or decrease in construction costs when constructing Pipe Racks as Off-Site Construction.

Analysis Model on Risk Factors of RCB Construction in Nuclear Power Plant (원자력 발전 플랜트 RCB 시공의 리스크 요인에 관한 분석 모델)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.212-213
    • /
    • 2014
  • The purpose of this study is to suggest analysis model of RCB construction in nuclear power plant. For the objective, This study drew the risk factors of RCB construction from existing literature. The results of the study proposed analysis model made hierarchy in rebar, form, and concrete work. These will be baseline data for risk management in construction project of nuclear power plant.

  • PDF

현장탐방 - 하자없는 시공, 철저한 안전관리로 완벽 추구, 성창E&C(주) SK이노베이션 인천 V4-PROJECT

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.290
    • /
    • pp.53-59
    • /
    • 2014
  • SK이노베이션이 발주한 V-PROJECT는 이미 가동중인 SK에너지 인천COMPLEX 석유화학플랜트 기존 공장에 Condensate와 Crude를 처리하여 Benzene과 p-Xylene 생산시설 및 부대시설 증설 프로젝트이다. 이 시설에서 주로 생산되는 자일렌(p-Xylene)은 폴리에스터 섬유의 원료로서 국내를 비롯하여 중국, 인도, 남미 등의 섬유시장 성장으로 최근들어 수요가 많아짐에 따라 생산시설을 증설한 것이다. 이 프로젝트 완공으로 2015년부터는 기존보다 3배 증가한 벤젠 50만톤, 톨루엔 10만톤, 자일렌 130만톤이 연간 생산될 예정이다. 본지는 V4 Area의 기계설치 및 배관 철골제작 설치, 도장공사를 시공한 성창E&C(주)(대표 김기영)의 이종윤 소장을 만나 플랜트 현장 특성 상 기밀사항인 시공은 생략하고 현장 이야기를 들어 보았다.

  • PDF

종합건설업체 탐방-설계.시공 차별화로 삶의 질 향상을 추구하는 한일건설(주)

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.4 s.213
    • /
    • pp.69-73
    • /
    • 2008
  • 한일건설(주)은 1978년 설립 이래 건축, 플랜트, SOC사업, 주택사업 등 다양한 분야에서 입지를 다져왔으며 특히 건축분야에서 서울시립미술관 등 공간의 효율성을 높이고 예술적 가치를 더하는 건물을 선보이고 있다. 또한 방글라데시, 베트남 등 해외플랜트 건설에서 시공능력을 인정받아 캄보디아 사상최대 주거단지인 캠코시티 프로젝트와 괌 타무닝에 대규모 아파트 건설공사 수주 등 해외건설에서도 두각을 나타내고 있다. 한일건설(주)은 고품격아파트“베라체”런칭을 통해 자연과 인간, 문화가 어우러진 풍요로운 생활문화 공간 추구 등 타 건설사와 차별화된 설계와 시공으로 21세기 건설산업을 선도코자 오늘도 정진하고 있다.

  • PDF

Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project (LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구)

  • Kim, Yong-Tan;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.4
    • /
    • pp.80-85
    • /
    • 2009
  • LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.

  • PDF