Establishment of Construction Procedure on the Off Shore Piping Work of a LNG Unloading Project

LNG 하역 플랜트의 Off Shore 배관시공절차 확립에 관한 연구

  • Received : 2009.08.19
  • Accepted : 2009.09.28
  • Published : 2009.12.30

Abstract

LNG stevedoring plant offshore pipelines requires human power and the longest construction period in constructing LNG storing terminal and influences on the success of the project absolutely. In this paper, the constructing procedures of LNG stevedoring plant offshore pipeline was established. Establishment of constructing procedures of LNG stevedoring plant offshore pipeline includes procurement of main equipments, iron frame and pipelines. To predict any expectable problems, that may occur by the stage of construction the application to the field works with a base of theoretical and practical contents for the constructing procedures of LNG stevedoring plant offshore pipelines can be established.