Forecasting the Effects of the Claims in the Korean Construction Industry (국내 중재사례를 통한 주요 건설 클레임 예측 방안)

  • Kim, Jihye;Im, Haekyung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.35-44
    • /
    • 2016
  • Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.

Risk Analysis and Classification of Public-Private Partenership in Project Financing Process (민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석)

  • Park, Hye-Sung;Kim, Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.117-126
    • /
    • 2011
  • With Public-private partnership PF (project financing) deals saw explosive increase in quantity since its introduction to Korea in 2001, but, met with severe recession in the fallouts of the financial crisis that hit the global economy in 2008. This study intends to identify the risk factors corresponding to issues of public-private partnership projects financing structure and classify and analyze them by project phase. Outcomes of this research are expected to help recognize risk factors in each project phase during project planning and develop risk control and mitigation strategy during project implementation.

Construction Management Evaluation Model using Risk Index Modeling in Construction Phase (위험도 모델링을 이용한 시공단계의 감리업무 평가모델)

  • Ryu Jin-Young;Mo Yong-Woon;Kim Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.89-100
    • /
    • 2000
  • The purpose of this study is to maximize project efficiencies in construction management by analyzing hierarchical factors that effect in project supervision system, and consequently constructing managerial CSF(Critical Success Factors). For this study, the tools for evaluating operating and management abilities of site engineers are built from analyzing status and issues, deducing influence factors and rating cardinal scales of these factors from survey results. These evaluation tools are reflected to the construction supervision decision making process so that can improve project management effectiveness.

  • PDF

The Effective Risk Management of Academic Entrepreneurs' R&D Technology Transfer (학술적 기업가의 R&D 성과이전 위험의 효과적 관리)

  • Kim, Jai-Myung
    • Korean Business Review
    • /
    • v.16
    • /
    • pp.123-144
    • /
    • 2003
  • The transfer of R&D performance is the technology transfer in a narrow sense. This study aimed at fanning the effective managerial systems of the transfer of the academic entrepreneur's R&D performance. For this purpose, this study analysed the characteristics and success factors of R&D performance transfer based on the theory of project life cycle. This research classified the life cycle of academic entrepreneurs' R&D projects into six stages. And the risks associated with the transfer process was categorized using the case study about the establishing processes the mineral-related small finns. Especially, the risk of the technology transfer was investigated by the R&D project implementation stages. Based on this results, this paper suggested the strategic system such as the marketing-oriented thinking, the clear-cut statement of the role among the stake-holders of the R&D and commercialization processes, the dynamic system of the academic entrepreneurs' leadership, the formation of the transfer management system, and the usage of project risk management techniques.

  • PDF

Research of RFP Appropriateness for the Success of Public SI Projects (공공 SI 프로젝트의 성공적인 수행을 위한 RFP 적합성에 관한 연구)

  • Jung, JaeBong;Lee, SeoukJoo;Kang, JaeWoo
    • Annual Conference of KIPS
    • /
    • 2010.04a
    • /
    • pp.973-976
    • /
    • 2010
  • 제안요청서(RFP)는 사업목적 달성을 위해 발주자가 공급자의 제안을 받기 위한 요구사항을 정의한 문서로 프로젝트 목표 수행의 중요한 요소이고, 불명확한 요구사항과 요구의 변경, 외부 수행 작업의 문제, 일정과 예산의 비현실성 등은 프로젝트의 성공적인 수행을 저해하는 위험요인이다. 본 논문에서는 2005년부터 2009년까지 공공 SI(System Integration) 프로젝트의 RFP를 대상으로 첫째, 미국 프로젝트 표준규격인 PMBOK(Project Management Body of Knowleage) 지식 및 관리 프로세스 영역을 적용하여 현황을 분석하였고 둘째, Core와 Support 프로세스 영역을 비교분석하고, 셋째, Core 프로세스의 범위, 일정, 비용 영역에 대해 분석하였다. 연구결과로 공공 SI RFP의 범위, 일정, 비용을 의미한 항목에서 분명한 차이를 보여 보완이 요구되었다. 향후 본 연구를 통해 공공 SI 프로젝트의 RFP 작성시 명확성을 제고하여 프로젝트 성공 수행에 도움이 되도록 하고자 한다.

An Exploratory Study on Conceptual Framework for Project-based Supply Chain Management : Focusing on Plant Engineering Firms (프로젝트형 SCM의 개념적 틀에 관한 탐색적 연구 : 플랜트 엔지니어링 기업을 중심으로)

  • Kim, Tae Ung
    • Journal of Digital Convergence
    • /
    • v.16 no.12
    • /
    • pp.123-135
    • /
    • 2018
  • The objective of this paper is to investigate the issues related to the supply chain management in plant engineering industry, and propose the framework to improve the project efficiency. The preliminary case study shows that EPC's fragmented nature, lack of coordination and information sharing, and lack of proper risk and change management contribute to project delay and cost overrun. To examine the level of informatization and information sharing in supply chain, survey responses from the suppliers and subcontractors have been collected. The statistical results show that information sharing, early involvement in design process and awareness in SCM have influenced the level of collaboration, but supplier assessment and informatization have no impact on the collaboration. A conceptual model is proposed in order to facilitate the integration of design, procurement and construction functions. Implications from the study are also provided.

봄날의 덫, 자외선을 막아라

  • Yang, Seong-Sik
    • 건강소식
    • /
    • v.32 no.5
    • /
    • pp.20-21
    • /
    • 2008
  • 따스한 봄볕은 여성들의 마음을 설레게 한다. 이 무렵은 덥지도, 춥지도 않은 날씨로 인해 외출이 잦아지는 때이기도 하다. 당신은 이제껏 거의 완벽한 화장법을 구사하면서도 피부 나이를 속일 수 없어 괴로워해 왔다. 왜일까? 바로 피부에 가차 없이 가해지는 자외선 때문일 것이다. 만개한 꽃은 여인의 판단력을 흐리기에 충분하다. 그만큼 햇볕에 피부가 노출되는 상황은 경우에 따라 위험할 수도 있다. 과연 자외선으로부터의 안전지대는 어디인가? 당신의 피부 노화방지 프로젝트, 지금부터 시작이다.

  • PDF

A Risk Quantification Study for Accident Causes on Building Construction Site by Applying Probabilistic Forecast Concept (확률론적 추정 개념을 적용한 건설 공사 현장의 사고원인별 리스크 정량화 연구)

  • Yu, Yeong-Jin;Son, Kiyoung;Kim, Taehui;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.3
    • /
    • pp.287-294
    • /
    • 2017
  • Recently the construction project is becoming large-sized, complicated, and modernize. This has increased the uncertainty of construction risk. Therefore, studies should be followed regarding scientifically identifying the risk factors, quantifying the frequency and severity of risk factors in order to develop a model that can quantitatively evaluate and manage the risk for response the increased risk in construction. To address the problem, this study analyze the probability distribution of risk causes, the probability of occurrence and frequency of the specific risk level through Monte Carlo simulation method based on the accident data caused at construction sites. In the end, this study derives quantitative analysis by analyzing the amount of risk and probability distributions of accident causes. The results of this study will be a basis for future quantitative risk management models and risk management research.

Project Risk Assessment Through Construction Sequence Analyses for Industrial Plant Construction Projects (산업플랜트 건설 프로젝트의 주요 공정 시퀀스 분석을 통한 리스크 평가)

  • Lee, Kyusung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.140-151
    • /
    • 2013
  • In 2011 and 2012, Korean construction firms awarded around $ 64.5. Billion each year from the overseas market in 2011. This contract value accounted for overwhelming portion of total overseas construction contract values, and this growth is expected to continue for the next decade. However, contract scopes awarded to the Korean construction firms mainly involve detailed design and construction phases due to their competitiveness for the construction techniques. In other words, front-end-engineering-design and construction project management are not considered part of core business due to the lack of project management skills and experience. The researchers focused on development of construction sequence model required to improve construction planning and scheduling skills for the Korean construction firms. The model identifies critical work items and the sequence throughout project execution process. In addition, the researchers developed a risk evaluation method by applying fuzzy theory to the critical construction activities for the industrial plant construction projects. Developed methodology will help project practitioners to develop project schedule in a timely and effe ctive manner and evaluate project risks associated with scheduling process for the industrial plant construction projects.

A Study on Risk Analysis Methode Using Case-Based Reasoning (사례기반 추론을 이용한 위험분석방법 연구)

  • Lee, Hyeak-Ro;Ahn, Seong-Jin
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.18 no.4
    • /
    • pp.135-141
    • /
    • 2008
  • The risk enlargement of cyber infringement and hacking is one of the latest hot issues. To solve the problem, the research for Security Risk Analysis, one of Information Security Technique, has been activating. However, the evaluation for Security Risk Analysis has many burdens; evaluation cost, long period of the performing time, participants’ working delay, countermeasure cost, Security Management cost, etc. In addition, pre-existing methods have only treated Analyzing Standard and Analyzing Method, even though their scale is so large that seems like a project. the Analyzing Method have no option but to include assessors’ projective opinion due to the mixture using that both qualitative and quantitative method are used for. Consequently, in this paper, we propose the Security Risk Analysis Methodology which manage the quantitative evaluation as a project and use Case-Based Reasoning Algorithm for define the period of the performing time and for select participants.