• Title/Summary/Keyword: 프로젝트 담당자

Search Result 55, Processing Time 0.03 seconds

An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period (프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구)

  • Cho, Ji-Hun;Cho, Heung-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.131-139
    • /
    • 2009
  • It is critical to select the appropriate type of tower cranes for the construction of super tall buildings. However the selection is often made based on subjective personal experiences due to the lack of historical and analytical data. As a result, planning mistakes and efficiency errors sometimes occur. This research is to develop a system of hoisting analysis for appropriate tower crane selection and to provide a flexible statistical model based on the Burj Dubai project. In addition, this system hassupporting functions that can estimate the target construction period per floor, and a decision-making construction period computation method which is based on the characteristic of the selected tower cranes.

Proposal for Developed Procurement and Material management System On Using Previous System Analysis in Plant Engineering (플랜트 구매조달 및 자재관리 시스템 개발 요구사항 분석을 통한 개발 방향 제시)

  • Lee, Seung-Hun;Kim, Sun-Kuk;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.204-209
    • /
    • 2006
  • Despite the recent depression of the construction industry, overseas plant market especially Middle East plant market is booming owing to the high oil price. Since many Middle Eastern countries are placing orders of big scale projects based on the high oil price, Korean EPC contractor are trying to get over the depression through theses plants. Presently, since the plant market is in prosperous condition in general, it is not hard to get overseas orders; however the original licenses that requirehigher technology and high added values are exclusive for advanced engineering companies which great difficulty is predicted for developing countries like us to join the crowd. Therefore, the objective of this study is to propose establishment of material management system on the filed to gain optimized effect of material management in connection with procurement system that all the procurement related personals execute tasks in advanced level by systemizing the task operation within the knowledge and task ability in time for plant construction procurement as a method to strengthening the competitiveness of Korean companies.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Development of Estimation Model of Construction Activity Duration Using Neural Network Theory (건설공사 공정별 작업기간 산정을 위한 신경망 기반 모형 구축)

  • Cho, Bit-Na;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3477-3483
    • /
    • 2015
  • A reasonable process for the activity duration estimation is required for the successful construction management because it directly affects the entire construction duration and budget. However, the activity duration is being generally estimated by the experience of the construction manager. This study suggests an estimation model of construction activity duration using neural network theory. This model estimates the activity duration by considering both the quantitative and qualitative elements, and the model is verified by a case study. Because the suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project.

Log Analysis Method of Separate Security Solution using Single Data Leakage Scenario (단일 정보유출 시나리오를 이용한 개별 보안솔루션 로그 분석 방법)

  • Park, Jang-Su;Lee, Im-Yeong
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.4 no.2
    • /
    • pp.65-72
    • /
    • 2015
  • According to recent statistics published by the National Industrial Security Center, former and current employees are responsible for 80.4% of companies' technology leakages, and employees of cooperative firms are responsible for another 9.6%. This means that 90% of technology leakages are intentionally or mistakenly caused by insiders. In a recent incident, a credit card company leaked private information, and the person responsible was an employee of a cooperative firm. These types of incidents have an adverse effect not only on a company's assets but also on its reputation. Therefore, most institutions implement various security solutions to prevent information from being leaked. However, security solutions are difficult to analyze and distinguish from one another because their logs are independently operated and managed. A large number of logs are created from various security solutions. This thesis investigates how to prevent internal data leakage by setting up individual scenarios for each security solution, analyzing each scenario's logs, and applying a monitoring system to each scenario.

IS/IT 기술 및 지식에 대한 충북 지역 IS 실무자 재교육 수요 조사

  • Lee, Hyeon-U;Gyeong, Won-Hyeon;Min, Bong-Gyu;Go, Seok-Ha
    • Proceedings of the Korea Society of Information Technology Applications Conference
    • /
    • 2006.06a
    • /
    • pp.159-181
    • /
    • 2006
  • 본 연구에서는 청주와 그 인근 지역에서 정보시스템을 개발하거나 운영하고 있는 업체의 IS 실무자들에게 (1) IS 실무자의 업무 수행 성과, (2) 소프트웨서 및 IT 전문기술수준, (3) IS 지식 및 능력 수준, 그리고 (5) 재교육 수요에 대해서 설문 조사하였다. 본 연구의 조사 대상자들은 주로 Sl(system integration) 업체에 종사하는 IT(information technology) 실무자들과 e-Business를 수행하는 일반 기업에서 전산 업무를 담당하고 있는 실무자들이며, 구체적으로는 전산시스템 운영자, 시스템/데이터베이스 분석/설계자, 어플리케이션/웹 프로그래머, 최종사용자 지원 담당자, e-Business를 위한 IT 지원 인력 등이다. 조사 결과는 다음과 같다. 충북 지역에서 IS 실무자들은 자신들의 업무를 성공적으로 수행하기 위한 지식 및 기술의 다양한 영역에서 광범위하게 지식 및 기술의 결핍을 느끼고 있으며, 자신의 업무 성과가 전반적으로 좋지 않다고 판단하고 있고, 업무 관련 지식 및 기술에 대한 재교육의 필요성을 강하게 느끼고 있다. 또한, 충북 지역의 IS 실무자들은 주된 활동이나 업무가 시스템 개발과 유지보수, 최종 사용자 지원 등의 활동이며, 이에 대한 최신의 기술과 고객 중심의 시각화된 도구(GUI)를 제공하는데 많은 시간을 투자하며, 기존의 반복적인 개발 업무에서 점차 경력이 쌓임에 따라 고객 중심적인 새로운 시스템 개발을 위한 기획과 관리에 많은 관심을 기울이고 있으나, 조직 운영 및 의사결정 등과 같은 기술/지식들에는 낮은 관심을 보였다. IT전문 기술들 중 IS 실무자들이 필요로 하고 보유해야 한다고 응답한 기술들은 대다수가 웹 개발에 관련된 기술이며, IS 실무자들은 대규모 프로젝트의 수행에 필요한 공동 작업 수행 능력의 제고와 그를 위한 재교육에 높은 관심을 나타내었다. 본 조사는 충북의 IS 실무자들을 위한 대학 교육과 재교육을 포함하는 최적의 평생 교육계획 수립을 위한 기초적이고 필수적인 정보를 제공할 것으로 기대된다.

  • PDF

A Study on Overseas Business Archives Professional Organization (해외 기업 아카이브 전문가조직에 관한 연구)

  • Kim, hyosun;Kim, Jihyun
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.19 no.4
    • /
    • pp.139-173
    • /
    • 2019
  • At present, no outside organization provides systematic support for business archives, even though there are companies that operate their own. To resolve this situation, this study suggested that overseas business archives professionals organization could apply in Korea by analyzing the form of organizations and functional roles. As such, the organization of professionals in overseas business archives was analyzed through their website, literature research, and email interviews of the staff. Based on the analysis, overseas organizations of business archives professionals were established in the form of sections and independent organizations to systematically support business archives through long-term projects. Thus, this study proposed an organizational structure of professionals organizations for the development of domestic business archives and the functional role of supporting activities, educational activities, and publishing activities. In addition, the ultimate development of business archives is clearly no longer the only solution to the change in perception and strategy of individual companies' business records. Moreover, this study is significant as a starting point for discussion on the establishment of business archives professionals or organizations.

The Types and Characteristics of Educational Programs in Major Natural History Museums of the World (세계 주요 자연사 박물관의 교육 프로그램의 유형 및 특징)

  • Lee, Sun-Kyung;Choi, Ji-Eun;Shin, Myeong-Kyeong;Kim, Chan-Jong;Lee, Sun-Kyung;Im, Jin-Young;Byun, Ho-Seung;Lee, Chang-Zin
    • Journal of The Korean Association For Science Education
    • /
    • v.24 no.2
    • /
    • pp.357-374
    • /
    • 2004
  • This paper described the types and characteristics of educational programs in major natural history museums of the world. Data were collected from the websites, annual reports, and written materials of the Natural History Museum at London, Australian Museum at Sydney, Field Museum of Natural History at Chicago, Smithsonian Museum at Washington D.C, Royal Tyrrell Museum at Canada and American Museum of Natural History at New York. As the result of this study, we presented ten types of educational programs, which were moveable museums, workshops, lecture/courses, festival/events, discovery activities, scientific exploration/research projects, field trips, youth curators/internship, loan materials and camp/tours. We also described the examples equivalent to each program type. The characteristics of educational programs provided by museums as informal learning settings were analyzed in terms of their themes, participation levels, connection with exhibition, relation to curriculum, and learning activity levels. Information in this paper will assist science teachers, museum educators and curators: (1) to design and implement various types and contents of educational programs; (2) to use characteristics of educational programs to assess and develop them; (3) to make important contributions to science education that involves the introduction of various scientific aspects and collections to the public, and the use of programs for science learning and teaching coherent to existing curricula.

A Study on Software Fault Analysis and Management Method using Defect Tracking System (결함 추적 시스템에 의한 소프트웨어 결함 분석 및 관리기법 연구)

  • Joon, Moon-Young;Yul, Rhew-Sung
    • The KIPS Transactions:PartD
    • /
    • v.15D no.3
    • /
    • pp.321-326
    • /
    • 2008
  • The software defects that are not found in the course of a project frequently appear during the conduct of the maintenance procedure after the complete development of the software. As the frequency of surfacing of defects during the maintenance procedure increases, the cost likewise increases, and the quality and customer reliability decreases. The defect rate will go down only if cause analysis and process improvement are constantly performed. This study embodies the defect tracking system (DTS) by considering the Pareto principle: that most defects are repetitions of defects that have previously occurred. Based on the records of previously occurring defects found during the conduct of a maintenance procedure, DTS tracks the causes of the software defects and provides the developer, operator, and maintenance engineer with the basic data for the improvement of the software concerned so that the defect will no longer be manifested or repeated. The basic function of DTS is to analyze the defect type, provide the measurement index for it, and aggregate the program defect type. Doing these will pave the way for the full correction of all the defects of a software as it will enable the defect correction team to check the measured defect type. When DTS was applied in the software configuration management system of the W company, around 65% of all its software defects were corrected.