Earned Value based Construction Project Control System (Earned Value 기반 프로젝트 관리체계 및 사례연구)

  • Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.123-130
    • /
    • 2002
  • Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.

  • PDF

A Review of Structure and Application of Unified Medical Language System(UMLS) (통합의학언어 시스템(UMLS)의 구성 및 적용에 대한 고찰)

  • Kim, Hye-Sun
    • Journal of Information Management
    • /
    • v.32 no.2
    • /
    • pp.26-39
    • /
    • 2001
  • Various controlled vocabularies such as thesaurus and classification used for effective information retrieval contain different terms in expressing the same concept or meaning. National Library of Medicine has developed the Unified Medical Language System(UMLS) to solve the problems of information retrieval and integration resulted from the difference of concepts between different sources. The UMLS development was initiated in 1982 as a long-term project, and the 2001 edition of the UMLS consists of three parts : Metathesaurus, Semantic Network, and SPECIALIST Lexicon. This paper reviews background and structure of the UMLS including applications in PubMed, NLM Gateway.

  • PDF

Product modelling and cae (제품모델링과 CAE)

  • 강원수
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.34 no.4
    • /
    • pp.33-38
    • /
    • 1997
  • 국내의 조선업계는 생산성 향상을 위해 10여년전 부터 CAD/CAE/CAM 시스템을 한 선박 설계 및 생산 시스템의 전산화/자동화를 꾸준히 추진해 왔으며 최근에는 CIM(Computer Integrated Manufacturing)구축을 위한 노력을 경주하고 있다. 국외에서도 CIM을 구축하기 위한 노력이 계속적으로 지속되고 있는데, 한 예로서 일본의 Hitachi 조선소는 1993년 부터 PHI(Product model by Hitachi zosen)프로젝트를 통해 CIM을 CAE, CAD, CAM, 공장 자동화(FA), 생산계획/관리 및 경영관리 등의 요소로 구성되는 컴퓨터 지원에 의한 정보의 통합적 관리라는 개념으로 정의하고, 이들 각 구성요소를 network을 통해 유기적으로 연결하므로서 설계 및 생산에 관계되는 정보를 서로 교환하고 공유할 수 있도록 추진하고 있다. 이처럼 CIM을 실현하기 위해서는 서로 다른 시스템들간의 정보를 원활히 교환하고 공유할 수 있는 환경이 구축되어야 한다.

  • PDF

Design of Concurrent Engineering Framework for the Quality Management with Real Time Enterprise Portal (실시간 전사적 통합 품질경영 활동을 위한 동시공학적 프레임워크 설계)

  • Lee, Myeong-Ho
    • Proceedings of the KAIS Fall Conference
    • /
    • 2006.05a
    • /
    • pp.457-461
    • /
    • 2006
  • 디지털 융합(Digital Convergence)이 모든 분야에서 급속히 전개됨으로서 기업들은 전략적으로 IT를 전사적으로 활용하면서 글로벌 시대의 경쟁 기업들에 비해 보다 빠른 신기술 습득을 적용함으로써 생존 경쟁의 우위 확보 전략이 점차 강화되고 있는 실정이다. IT 기술의 발전 방향도 전사적 데이터 및 비즈니스 프로세스의 통합을 통하여 전 영역에 걸쳐 신기술을 이용하여 표준화와 통합화로 진보되고 있다. 그러나 글로벌 경쟁체제인 세계화가 가속화 되고 있는 기업들의 품질 경영 활동이 실시간으로 처리되지 못함에 따라 각종 경영혁신 활동에 대한 통제/관리와 비용 절감 노력이 기업 역량 강화에 유기적인 효과를 거두지 못하고 있는 실정이다. 따라서 본 연구에서 일반적으로 제조 부문이나 사무간접(관리)부문에서도 적용 가능한 6시그마 추진 방법론을 기반으로 목표관리 및 방침관리인 Top-Down 프로세스인 순공학 품질경영 활동인 뿐만 아니라, 현장의 창의적인 품질경영 활동을 통한 Bottom-Up 프로세스인 역공학 품질경영 활동에서도 적용 가능한 실시간 동시공학적인 품질경영 활동의 프레임워크를 설계하도록 한다. 또한 가치 흐름 분석을 통해 낭비 요인을 철저하게 제거하고, 프로세스의 흐름을 최적화하여 원하는 품질경영 활동이 프로젝트로 발전하여 기업경영에 실시간으로 반영될 수 있는 전사적 통합 품질경영 활동 시스템을 제안하도록 한다.

  • PDF

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Baek, Young-In
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.695-699
    • /
    • 2009
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

An Aplication Model to Ensure Practical Usage in Construction Management (공사관리의 실용성 확보 전략과 적용 모델의 개발)

  • Chang Young-Bae;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.401-404
    • /
    • 2002
  • To manage a construction project efficiently, it is essential to ensure the practical usage in construction management. The purpose of this study is to develop a practical model, which will increase the efficiency of management. The followings are the method of this study: (1) Establishing a breakdown structure based on integration of CBS and WBS which is well acquainted (2) Developing and systemizing managerial standards and processes on such activities as calculating and marking progress rates & schedule, summarizing cost by activities level, making out project analysis reports. This study shall contribute to raising the efficiency in construction management after being verified in a pilot project and being developed into construction management system.

  • PDF

Improvement of Cost-Schedule integration based Progress Management through PMIS (비용-일정통합기반 진도관리 개선방안)

  • Yoon, You-Sang;Suh, Sang-Wook;Jang, Gyu-Seong;Choi, Jang-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.144-152
    • /
    • 2013
  • Recently construction projects become more bigger. So construction companies have being performed cost and schedule management task by using PMIS. In engineering and construction phase, progress management which occur the most frequent information I/O(input and output) should be managed effectively by PMIS. Although most information by PMIS manage efficiently, cost-schedule information for progress management is difficult to be managed due to recurrent information input. thus when changed by price fluctuation and change order, progress management could not connnect cost information with schedule information. So it caused inaccuracy of progress measurement and data increase in PMIS. To solve this problem, This study suggests improved module for progress management through integration of cost-schedule using quantity take-offs as progress measurement method.

A Case Study on Work Breakdown Structure(WBS) in Constructing the integrated computing environment of the e-Government (전자정부의 통합전산환경 구축을 위한 작업분할구조(WBS)의 사례연구)

  • Park, Jae-Won;Kim, Don-Gyu;Choi, Jae-Hyun;Lee, Nam-Yong
    • The Journal of Society for e-Business Studies
    • /
    • v.12 no.2
    • /
    • pp.31-45
    • /
    • 2007
  • Over the past decades, there have been numerous studies for approaches to build and operate electronic government systems. Among those studies, work breakdown structure(WBS) has been gained attention increasingly. As a general system engineering techniques. WBS is a kind of methods to engineer and manage electronic government systems effectively. WBS is to organizes tasks and data items for management and engineering for electronic government systems. In this paper, the authors proposed a conceptual WBS model for management and engineering electronic government systems. Also, the authors conducted a case study based on the conceptual WBS model. The results of this study provide useful insights and guidelines for applying the WBS to management and engineering for electronic government systems. The authors believed that the conceptual WBS models will be widely used to management and engineering an electronic government systems.

  • PDF

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

An Infrastructure System for Efficient Management of Software Development Environment in a Large Scale Organization (대규모 조직에서의 효율적인 소프트웨어 개발환경 관리를 위한 인프라 체계 구축)

  • Park, Myeong-O;Lee, Eun-Seok
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.05a
    • /
    • pp.265-268
    • /
    • 2008
  • 임베디드 시스템에서의 소프트웨어 비중과 규모의 지수적 증가로 인해 관련 개발 프로젝트의 경우 많은 개발 지원도구를 활용한 개발활동이 이루어 지고 있다. 하지만 각 개발 조직간 상이한 개발 지원도구의 사용과 관리로 인해, 협업 개발체제에 문제가 발생하고 있으며, 단위 개발조직의 개발 지원도구의 추가 소요량 산정시 정량적인 데이터에 근거하지 않은 부정확한 구매 예측으로 인해 많은 개발 예산의 낭비가 발생하고 있다. 이에 본 연구에서는 개발 조직간 개발 효율성을 높이기 위한 효율적인 인프라 환경을 구축하기 위해, 통합 도메인 환경하에 개발 지원도구의 일원화된 관리와 개발조직간의 라인센스 사용량 측정을 위한 모니터링 시스템 개발로, 개발 지원 도구 추가 소요 발생시 정확한 소요량 예측과, 사용량에 근거한 공정한 비용 분배 절차를 제시하고자 한다.