• Title/Summary/Keyword: 터널 라이닝 콘크리트

Search Result 218, Processing Time 0.023 seconds

Numerical Analysis on the Crack Control of Concrete Lining Reinforced by Composite Fibers (복합섬유보강 콘크리트 라이닝 부재의 균열제어를 위한 수치해석적 연구)

  • Yang, Woo-Shik
    • Journal of the Korean Geosynthetics Society
    • /
    • v.9 no.2
    • /
    • pp.41-50
    • /
    • 2010
  • The concrete lining of a tunnel constructed by NATM used to be regarded as facing material which does not support any load from the surrounding ground. But the recent appraisal of the decrepit tunnels revealed that rockbolts and shotcrete deteriorate with time resulting in loss of supporting capability. Consequently, concrete lining has to support part of the load which used to be supported by rockbolts and shotcrete, and thus should be regarded as the final supporting structure in a tunnel. One of the common, and perhaps the most serious problem in concrete lining is the longitudinal cracks taking place at the tunnel crown. The longitudinal cracks, mostly related to the construction procedures, can be developed by many reasons such as the lack of thickness, wrong materials, bad curing environment, and excessive external forces. Many efforts has been made to control and suppress these cracks but efficient and economic way is yet to be found. For efficient crack control in concrete lining, reinforcement by composite fibers, which is the mixture of steel fiber and nylon fiber, is suggested in this study.

  • PDF

라이닝콘크리트의 양생시스템 개선

  • Yu, Yeong-Seon;Kim, Yong-Ha;Mun, Byeong-Tak;Lee, Hyeon-Gu;Gwon, Gi-Hwal;Im, Ju-Yeong
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.13 no.2
    • /
    • pp.41-49
    • /
    • 2011
  • 양북터널은 굴착과 동시에 라이닝콘크리트를 타설하였다. 터널굴착과 라이닝콘크리트의 동시시공을 위한 적정시공 Cycle을 결정하고, 이에 따른 양생기간과 양생온도를 설정하는 순으로 시험하였다. 라이닝콘크리트는 품질관리를 위해 보온장치를 탑재한 Sliding form과 양생대차를 운영하고, 균열을 최소화하기 위해 양생온도와 양생시간 및 탈형강도 등을 시험에 의해 결정하였다. 시험과정은 터널내부와 라이닝콘크리트 내부온도를 계절별로 측정하고, 양생온도별로 콘크리트의 강도를 측정하였다. 거푸집 탈형시 콘크리트 온도가 터널내부의 온도로 수렴하기까지는 $15{\sim}20^{\circ}C$의 차이로 측정되었고, 거푸집 탈형을 위한 콘크리트 초기강도 4MPa을 발현하는데는 양생온도에 따라 차이가 발생하지만 시공 Cycle에 적합한 양생시간은 약 20시간이고, 이 때의 양생온도는 $23^{\circ}C$ 이상이었다. 위의 시험결과대로 현장에서 라이닝콘크리트를 양생한 결과 시공 Cycle과 압축강도 및 콘크리트면의 외관 등이 만족한 결과를 나타내었다.

  • PDF

Improvement of Concrete Lining Construction Method in Large Section Tunnel (대단면 터널 라이닝 콘크리트 타설 기법 개선에 관한 연구)

  • Kim, Sang-Whang;Ra, Kyong-woong;Koh, Sung-Yil
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.1
    • /
    • pp.77-86
    • /
    • 2006
  • Although the adverse critisism have been continued that the concrete lining need or not, most tunnel engineer agree that the concrete lining needs to increase the tunnel safety To establish the concrete lining's quality improvement method, we grasp the basic problems in lining construction process and propose the lining construction methods to increase the concrete quality This paper present a reason of initial crack occurrence in the large section tunnel (4 lane wide span tunnel), lining and an improved method for crack minimization in construction process. It is also verified verify that the proposed method can give qualified concrete lining by carrying out the concrete injection model test and the numerical analysis of concrete flow.

  • PDF

A Study on Crack Control of Tunnel Lining Concrete with Large Section (대단면 터널 라이닝 콘크리트의 균열저감 연구)

  • Kim, Wan-Young
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • The lining concrete of water tunnel is a much capability to occur crack due to drying shrinkage and vibrator compaction etc. Because of crack of concrete induce structural problem and decrease durability of concrete, it is need to reduce crack of concrete. In this an Analytical study to analyze the effect of curing of concrete and compaction on the lining concrete. As the results, it was found that control of construction condition into curing of concrete and compaction improve on construction efficiency of the lining concrete.

  • PDF

A Study on Controlling of Cracks Occurred at Crown of Tunnel Concrete Lining using Model Test (모형 실험에 의한 터널 콘크리트 라이닝의 천단부 균열 제어에 관한 연구)

  • Jeon, Joong-Kyu;Jeon, Chan-Ki;Kim, Nag-Young;Kim, Su-Man;Lee, Jong-Eun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.8 no.3
    • /
    • pp.227-235
    • /
    • 2006
  • The problematic issue of cracking, water shedding in tunnel is recently coming out in the view of the structural stability. Hence, the assessment is required for the existing tunnels to achieve the structural soundness of tunnels, and their safety and maintenance. In this study, fracture behaviour and displacement of a tunnel concrete lining using steel fiber reinforcement concrete was investigated. The specimens were fabricated in single lining for a model of real road tunnel. As parameters, load condition, thickness of lining, whether or not rear cavity in crown, and a ratio of steel fiber in concrete were taken. From these factors, the load for crack and fracture, displacement, and the pattern of crack were looked into for the structural stability of a tunnel concrete lining.

A study on the reduction of concrete lining re-bar according to the tunnel design factors (터널 설계인자 평가에 따른 콘크리트 라이닝 철근량 절감에 관한 연구)

  • Kang, Si-On;Lim, Young-Duck;Shin, Jeong-Ho;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.197-209
    • /
    • 2018
  • This paper presents a study on the reduction of concrete lining re-bar according to the tunnel design factors. The design of the concrete lining increases the reinforcing re-bar according to the application of excessive load, and the economical efficiency is reduced. In order to improve the economical efficiency of tunnel construction, rational standards are required for the design factors of concrete lining. Therefore, this research analyzed the characteristics and problems of the design factors applied to the design of concrete lining. Also, the economical review of the concrete lining for design factor application was compared with the amount of reinforcing re-bar calculated from the section design using numerical analysis. The results show that the amount of re-bar is varied according to the design factors. That is, the required amount for re-bar in the tunnel concrete lining could be reduced in the design stage. The results of this study may be useful for economic design of concrete lining in the future.

Characterization of deterioration of concrete lining in tunnel structures (터널 콘크리트 라이닝 구조물의 성능저하 특성)

  • Kim, Dong-Gyou;Jung, Ho-Seop;Bae, Gyu-Jin;Shin, Hyu-Soung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.11 no.4
    • /
    • pp.387-394
    • /
    • 2009
  • The objective of this study is to evaluate the durability and deterioration of concrete lining in the seven conventional tunnels. These tunnels were constructed about 40~70 years ago, and closed about 10~40 years ago. The field investigation and various laboratory testings were performed for this study. It was observed from the visual, examinations that the concrete linings of 7 tunnels were severely deteriorated, such as, cracks, leakages, desquamation, and exploitations. The compressive strengths obtained from rebound hardness method and uniaxial compressive strength test on core specimens largely differed depending on the locations in the tunnel. The maximum compressive strength of concrete lining was greater about 2 times than the minimum compressive strength of concrete lining in the same tunnel. The results of micro-structural analysis showed that the substances deteriorating the concrete lining, such as ettringite and thaumasite, were detected in the concrete lining of tunnel.

A Study on the Design Loads of NATM Tunnel Concrete Lining (NATM 터널 콘크리트라이닝 설계하중에 관한 연구)

  • 천병식;신영완
    • Tunnel and Underground Space
    • /
    • v.11 no.2
    • /
    • pp.96-108
    • /
    • 2001
  • A concrete lining of NATM tunnel is the final product of a process that involves planning and evaluation of user needs, geotechnical investigations, analysis of ground-lining interaction, construction, and observations and modifications during construction. The designer must consider the lining in context of the many function, construction, and geotechnical requirements. Also, the loss of supporting capacity of shotcrete lining due to poor rock qualities and shotcrete erosion must be considered. The values, shapes, and estimating methods of rock load and water pressure are very different with every designers. Estimating methods of rock loads used in the design of NATM tunnel concrete lining are investigated. Structural analyses are done in various load combinations, and the member forces(moment, axial force and shear force) are compared. The adequate load combination of rock load and water pressure is proposed.

  • PDF

Performance Evaluation of Organic and Inorganic Fiber Reinforced Concrete in Tunnel Lining Structure (유·무기 섬유 혼입 터널 라이닝 콘크리트 부재의 성능 평가)

  • Lee, Jong-Eun;Kim, Tae-Won;Kim, Su-Man;Jeon, Joong-Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.3 s.55
    • /
    • pp.110-118
    • /
    • 2009
  • The tunnel structure is widely used for transportation in the mountain area. To reduce the duration of construction and thus the expense, a tunnel excavation is often performed simultaneously with a tunnel lining in in-situ. However, cracking of the tunnel lining may occur arising from the vibrating impact in the excavation process. The present study concerns the role of steel fiber and nylon fibers in tunnel lining concrete to reduce the vibrating impact. As a result it was found that both the nylon fiber and steel fiber improved the durability and physical properties of concrete.

Prediction of ling concrete thickness for cable tunnel by GPR and impact-echo method (지중레이다와 충격반향기법에 의한 지하 통신구 터널의 라이닝 두께 추정)

  • Kim Hyung-Woo;Han Jin-Woo;Choi Kwang-Chul;Kang Ho-Kyung;Park Jong-Ho
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.382-384
    • /
    • 2003
  • 지하 30m 암반에 건설된 통신구 터널의 안전성을 검토하기 위하여 콘크리트 라이닝 두께를 지중레이다(Ground Penetrating Radar)와 충격반향기법(Impact-Echo Method)으로 추정하였다. 지중레이다에 의한 콘크리트 라이닝 단면의 연속적인 화상으로부터 라이닝 두께의 상대적인 변화를 파악하였으며, 라이닝 두께가 얇은 구간은 충격반향 기법에 의해 일정 간격으로 두께를 추정하였다. 터널 천장의 라이닝 두께는 31.85cm, 좌측 및 우측 측벽부의 라이닝 두께는 각각 32.45cm. 32.97cm로서 설계 값인 30cm와 비교적 잘 일치하는 것으로 파악되었다. 지중레이다와 충격반향기법을 조합한 본 방법은 터널 라이닝 콘크리트 두께를 추정하는데 있어서 매우 효율적이고 신뢰성 있는 방법으로 분석되었다.

  • PDF