• 제목/요약/키워드: 조력발전

검색결과 146건 처리시간 0.023초

조력발전용 수문케이슨의 통수성능에 관한 수리모형실험 (Physical Experiment on Water Discharge Capability of Sluice Caisson for Tidal Power Plant)

  • 이달수;오상호;이진학;박우선;조휴상;안석진
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.514-517
    • /
    • 2008
  • An hydraulic experiment was carried out in an open channel flume in order to investigate the water discharge capability of the sluice caisson for tidal power generation, which greatly affects the economical efficiency of the construction of a tidal power plant. To predict the influence of change in the major design parameters relating to the sluice shape on the water discharge capability of the sluice, the experiment was carried out very precisely. The experiment was carried out for the six different sluice models of different widths and bottom heights of the sluice throat section. The experimental data showed that the water discharge generally increased by increasing the width of the throat section if the side shape of the sluice was the same. In addition, the coefficient of discharge was larger when the bottom height of the throat section was higher for the two bottom heights that were tested.

  • PDF

조력발전 구조물 설계를 위한 지반조사;인천만 지반조사 사례 (Geotechnical Site Investigation for Designing of Tidal Power Plant Structures)

  • 오명학;이광수;박진순;염기대;차대욱;양근훈
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.613-616
    • /
    • 2007
  • The main structures that comprise a tidal power plant are turbine structure, sluice structure, tide embankment and gate. Since these structures are founded on seabed ground, an extensive geotechnical site investigation to evaluate the engineering properties of field soils must be conducted prior to design and construction. According to the results of geotechnical site investigation conducted at the planned site for construction of Incheon bay tidal power plant, soft ground generally lie 7 meters below the seabed surface level. This research suggests the reliable and economical design of foundations and ground improvements required for construction of main structures in Incheon bay tidal power plant, with considerations on field conditions.

  • PDF

가로림만 조력발전소 가동에 따른 조석체계 변화 예측 (Prediction of Tidal Regime According To Garolim Tidal Power Plant operation)

  • 강석구;이광수;박진순;염기대
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2007년도 춘계학술대회
    • /
    • pp.639-643
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

조력발전소 조위 제약사항을 고려한 발전기 효율시험에 관한 연구 (A Study of a Generator Efficient Testing Method that Incorporates Tidal Limitations)

  • 김현한;전정표;김광호
    • 산업기술연구
    • /
    • 제33권A호
    • /
    • pp.23-30
    • /
    • 2013
  • Tidal power generation is to produce electrical energy from fluctuations of the ebb and flow in a constructed embankment. More specifically, the sinusoidal variations of tidal flow, along with the periodicity and changes in the height of waves over time make the tidal power generation possible at a certain tidal level. This paper proposes a more practical efficiency test method for tidal power plant generator that utilizes the axis torque changing values rather than the retardation method which is commonly used. The proposed method was compared with the conventional method and the test result shows that proposed method provides a similar accuracy with the conventional retardation method and a better efficiency.

  • PDF

가로림만 조력발전소 가동에 따른 조석체계 변화 예측 (Prediction of Tidal Regime According To Garolim Tidal Power Plant operation)

  • 강석구;이광수;박진순;염기대;정경태;장찬주
    • 신재생에너지
    • /
    • 제3권2호
    • /
    • pp.3-10
    • /
    • 2007
  • Tidal regime change with general hydrolic condition change is examined, according to Garolim Tidal Power Plant (TPP) operation. Numerical model has been developed for the Yellow and East China Seas region, in order to consider the tidal regime change by the TPP operation. The changes of tidal elevation and tidal current inside the Garolim bay are also investigated in details, along with examining the change of the tidal flat area with operation. The field measurement for the tide and current have been carried out for the validation of the numerical model and for understanding the state of current system in the present state.

  • PDF

분산전원용 1MW급 권선형유도발전기 제어 (Control of a 1MW-class Doubly-fed Induction Generator for Distributed Resources)

  • 박정우;이기욱;김동욱;염기대;이광수;박진순
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.483-486
    • /
    • 2005
  • 국내에서 대체에너지 공급 비율을 보면 청정에너지로 분류할 수 있는 태양열에너지, 태양광 에너지, 풍력에너지를 모두 합하여 대체에너지의 10% 이하이며, 대체에너지 비율의 90% 이상을 폐기물로부터 얻은 에너지가 차지하고 있는 실정이다. 신재생에너지원에는 여러 종류가 있지만 해양에너지원에 대해 대상을 설정하고 이에 대한 부존량을 살펴보면 진도 주변의 해역에서 조류발전 부존량이 약 362만 kW가 되며, 시화호와 새만금 등지에서의 조력발전 부존량이 650만 kW, 동해안 후포 연안을 비롯한 파력발전 부존량이 20만 kW가 되는 것으로 알려져 있다. 이에 따라 해양에너지를 실용화하기 위한 연구가 국내외에서 연구되고 있다. 본 논문은 권선형유도발전기를 갖는 조류발전 시스템을 대상으로 연구한 결과로 권선형유도발전기를 제어하기 위한 전력변환장치 개발과 관련한 내용이다. 신재생에너지원이 발전 단가 측면에서 경제성을 갖기 위해서 발전기 용량은 5MW 급까지 대용량화 되어 있는 단계이지만 국내에서는 아직 MW급 이상이 되는 권선형유도발전기와 권선형유도발전기를 제어하는 전력변환장치에 대한 연구 실적이 없는 상황이다. 이에 본 논문에서는 IMW급의 권선형유도발전기에 대한 개발 사례를 소개하면서 유효전력제어, 역률제어 특성과 운전 속도에 따라 변동되는 회전자 측에서의 피상전력 제어 특성에 대해 고찰하고자 한다.

  • PDF

1980년대의 전력수급전망

  • 이주희
    • 전기의세계
    • /
    • 제25권1호
    • /
    • pp.17-20
    • /
    • 1976
  • 전원공급원으로서 발전시설용량은 표1과 같이 변천하였는데 1963년까지는 발전방식의 대종이 수력발전으로서 30%이상을 점하였으나 유리한 수력발전지점의 미개발로 이의 점유율은 점차적으로 하강하여 1973년부터는 10%이하로 되어 화력발전 즉 수입연료에 의한 발전방식으로 대체되었다. 전원연료의 수입의존도는 탈석유를 촉진할 수 있는 대체연료로서 원자력발전 또는 조력발전등이 본격적으로 개발되기 이전까지는 앞으로 계속하여 심화될 것으로 믿어진다. 이상과 같이 1970년대의 전반기까지 실적은 수요의 고도성장지속과 전원연료의 수입의존도를 심화시켰다. 이와 같은 실적을 기반으로 다음에 1980년대의 수급변모를 예상하고저 한다.

  • PDF

인천의 조차 변동 (Variability Of Tidal Range At Inchon)

  • 한상복
    • 한국해양학회지
    • /
    • 제15권2호
    • /
    • pp.123-128
    • /
    • 1980
  • 인천을 포함한 경기만 일대는 우리나라에서 조차가 가장 큰 곳으로 오래전부터 조력발전의 가능성에 대하여 논의되고 있는 곳이다. 조력발전의 타당성을 논하거나 오염물질을 바다에 버릴 때 그 확산문제를 풀기 위해서는 해수의 유출입량을 정확하게 결정해야 하는데 이때 조차는 가장 중요한 요소가 되며 나아가서 평균유속을 구할 수 있게 된다. 그러므로 조차의 변동범위를 가능한대로 정확하게 파악하고 있으면 좀 더 슬기롭게 자연환경을 이용할 수 있게 된다. 인천에서 조차를 정량적으로 조사하기 시작한 것은 1876년 7월∼8월 일본해군에 의하여 부근 해역의 원점측량시부터이며 1882년 영국인 Hoskyn이 이곳의 해도를 작성할 때 좀 더 자세히 조사된 것으로 믿어진다. 인천항 해도는 그후 각국에서 다투어 가면서 작성하게되는데 1884년에는 독일이, 1887년에는 러시아가, 1891년에는 일본이, 1893년에는 미국이 해도를 작성하였다. 영국인 Eldridge와 Allen은 각기 1893년과 1896년에 1해리를 12인치와 5.5인치로 하는 대축척 해도를 작성하기에 이르렀으며 한국수산지(농상공부 수산국, 1908)에 기재된 인천의 대조승 31척 1/4 및 소조승 21척 1/2은 해도작성시에 조사된 조석자료를 종합하여 정리한 것이다.

  • PDF

해양 신.재생에너지 개발이 생태계에 미치는 영향 (Effect of Ocean Renewable Energy on the Ecosystem)

  • 명철수;유정규;이광수;구본주;최중기
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.138-140
    • /
    • 2006
  • 해양 신 재생에너지 개발에 의해 생태계에 미치는 영향을 최소화하기 위한 방안을 모색하기 위하여 환경변화 사례와 예측하였다 해양에너지의 개발은 필수적으로 해양환경 및 생태계에 변화를 초래하여 조력발전시설의 경우 조간대에 서식하는 저서생물의 종다양성을 감소시키고 철새 등의 조류의 종수 및 개체수의 변화를 가져오고 조력 및 조류발전 터빈시설은 수생생물의 기계적 충돌에 의한 사망률을 증가시킨다 이러한 해양 신 재생에너지의 개발과 더불어 생태계의 영향을 최소화하기 위한 조사 및 연구가 병행되어야 개발 후 상용화단계에서 가장 합리적인 자연보전의 방안을 제시하고 지역사회와의 갈등을 최소화 할 수 있는 과학적인 자료를 도출 할 수 있다.

  • PDF

시화 조력발전 접속에 따른 발전량 예측 (Generation Forecast for Integrating Sihwa Tidal Power into Power Systems)

  • 김규호;송경빈;권석기;김태훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.375-377
    • /
    • 2006
  • This paper presents a method to calculate generation power for integrating Sihwa tidal power into power systems. The sea levels of 1 minute interval using cubic interpolation based on the forecasted levels of high and low water offered from Nori(National Oceanographic Research Institute) are calculated. If the sea level is greater than the lake level and the difference between sea level and lake level at high tide is over the default value, it begins to calculate the tidal power. It is seen that tidal power can supply power to demand side stably and economically from assessment of effect for integrating tidal power into power systems.

  • PDF