This study aims to empirically verify the positive impacts of PB(performance-based) HRM on the organizational effectiveness in a public corporation. The independent variables are 'PB staffing', 'PB appraisal', 'PB compensation'. The dependent variables are 'JS(job satisfaction)', 'OC(organizational commitment)'. The results are as follows. 'PB staffing' shows positive impact on both 'JS' and 'OC', but 'PB compensation' doesn't show positive impact on both 'JS' and 'OC'. Also, it is found that both 'PB appraisal' and 'PB compensation' do not show positive impact on 'OC'. 'PB appraisal' shows positive impact on 'JS', though. From the empirical analysis, the positive effects of the PB-HRM on the organizational effectiveness are partially verified. It is thought that these mixed results are originated from the particular situation in which the surveyed corporation is placed. After the merger of the corporation in 2009, even though it has introduced various PB-HRM systems, it has been through a harsh time such as wage freeze and return as measures of business normalization. This organizational situation may influence the verification of effectiveness of the normal PB-HRM.
The delay in the construction permit for the building, which obtained the approval of business proposal, may lead to a difference in the maintenance cost ranging between 20% and 30% in the neighborhood where the residents moved in, along with the new project under construction in the surrounding area amidst rigorous regulations that aim to promote energy-saving and the heightened interest of the public in energy conservation, and such problem would become the major source of serious public complaints. Thus, the energy-saving plan needs to be prepared when the approval is granted to the business plan. In order to prevent public complaints or ensure effectiveness of government's energy plan, it may be effective to apply the energy-saving plan based on current standards upon the award of construction permit when two years have elapsed since the date of the scheduled commencement of construction or when the start of construction is delayed as stipulated in the Article 18 of the Enforcement Decree of Housing Act. If the energy-saving plan and related technologies are merely the parts of license and permit process without fully serving their purposes and functions, it would be waste of time to deploy a lot of workforce and review and seek consultation. The government or owners of buildings need to fully understand the energy-saving aspects and exert effort to enhance the energy efficiency of buildings.
Impermeable surfaces such as transportation land uses including roads and parking lots accumulate high heavy metals and particulate matters concentration especially during dry season which worsens the river water quality and distort the water circulation system during rainfall events. Recently, the government has been promoting policies to install Low Impact Development (LID) facilities such as permeable pavements or grass blocks in parking lots or pavements. However, transition of asphalt-paved surfaces to permeable pavement generated asphalt wastes which are detrimental to the environment and has cost implications due to its removal and disposal. Therefore this study was conducted to provide a method of constructing a cost-effective permeable pavement to reduce waste generation and cost. In this study, comparative analysis of the water circulation capacity and economic efficiency of the traditional construction method and new method proposed in this study through the lab-scale experiment. The proposed method was to make holes in existing asphalt pavements, layout geotextile fabric and permeable base media such as sand before compaction. After compaction, layout grass blocks on the compacted base media then layout sand in between each grass blocks before compaction. Apparently, there was no significant difference between the traditional installation method of permeable pavement and the proposed method in this study considering surface runoff, infiltrated volume, stored volume, and rainfall-runoff delay time. The proposed method in this study generated 86% less wastes compared to the traditional installation method and has 70% cost reduction considering asphalt removal and disposal. The construction method proposed in this study yielded similar performance compared to the traditional installation method and water circulation effect, but was proven to be less complicated and economical.
This paper examines the characteristics and status of the major development policies for under-developed region by ministries and studies how the awareness or perspective of public officials on such policies impact the policy environment. This paper aims to redefine the goal and strategy of regional development policy so that it can effectively contribute to enhancing the quality of life of residents and improving competitiveness of the region. The problems and improvement direction found out through a documentational and practical research on the development policy for underdeveloped region can be summarized as follows: Firstly, more streamlined and integrated policies which are currently fragmented being implemented by different ministries are needed to enhance the effectiveness of policy execution. Secondly, improvements on the process of securing government funding and operating systems are needed to guarantee the rational standard of providing state subvention, the expansion of comprehensive subsidy and the independence of policy execution. Thirdly, amendments on the policy measures are needed to support the development and execution of the customized projects, strengthen cooperation among those projects by establishing a system for effective regional development project.
The trends of Green growth and environmentally-friendliness came to be the key development indicator for sustaining global environment for the future. Korean government reflected these trends in the main flows of the national development index. Korean construction industry is concentrating investment on fields related to these trends such as technologies for carbon dioxide deduction, materials or products for environmentally-friendly building and alternative energy development, as well. However, efforts to follow these trends during the construction process as a step for production phrase are not being considered enough. In this study, we analysed current status and points to be improved of on-site environment management by surveying major project owners and representatives of the environmental affairs in the leading companies of those fields. Also, we suggested organizational structure and operation model as a solution for enhancing environmentally-friendliness for systematic approach to manage on-site environment in public construction sites. In addition to these solutions, further approaches such as shifting paradigm of project owners and contractors, securing workforce and practical budget for efficient management activities, developing environmental management manuals, setting standards for evaluation of activities are needed for the stable settlement of on-site environmental management.
This comparative analysis on the project scheme of property-led regeneration of UK and Japan aimed to suggest the implications for economy-based urban regeneration of Korea. Property-led regeneration attract private capital by deregulation and public investment since 1980s' neoliberalism. Its effectiveness for creating job and economic growth is demonstrated through last decades. The cases of property-led urban regeneration of 2000s, such as Stratford, King's Cross, Otemach and Shinonome, show decrease of public direct investment, promoting deregulation. It also proved that property-led urban regeneration has a great ripple effect to local economy. And the partnership among central and local governments, public development corporations, private developers and other local interest groups is emphasized for delivering successful urban regeneration. Especially, human empowerment of local government and responsibility of public organization are also required to deliver urban regeneration.
In this era of smart convergent environment wherein all industries are converged on ICT infrastructure and industries and cultures come together, the information and communication construction business is becoming more important. For the information and communication construction business to continue growing, it is very important to ensure that technical manpower is stably supplied. To date, however, there has been no theoretically methodical analysis of manpower supply and demand in the information and communications construction business. The need for the analysis of manpower supply and demand has become even more important after the government announced the road map for the development of construction business in December 2014 to seek measures to strengthen the human resources capacity based on the mid- to long-term manpower supply and demand analysis. As such, this study developed the manpower supply and demand forecast model for the information and communications construction business and presented the result of manpower supply and demand analysis. The analysis suggested that an overdemand situation would arise since the number of graduates of technical colleges decreased beginning 2007 because of fewer students entering technical colleges and due to the restructuring and reform of departments. In conclusion, it cited the need for the reeducation of existing manpower, continuous upgrading of professional development in the information and communications construction business, and provision of various policy incentives.
Sinkholes have occurred in various places around the world and concerns about public safety have been raised in recent years. Particularly, a ground subsidence may occur due to a variety of conditions when developing underground spaces. Ground subsidence refers to the sinking of the Earth's surface caused by the loss of the soil constituting ground due to a certain artificial cause in the ground. Ground subsidence is induced by artificial causes such as the leakage of water supply/sewage pipes and groundwater disturbance, and it is different from a sinkhole, where the sinking of the Earth's surface is induced by the cavity formed due to the melting of limestone in the ground with limestone bedrock. In recent underground development in the urban areas of Korea, damages to surrounding buildings have frequently led to many difficulties with civil complaints and compensation issues, and the collapse of some buildings has resulted in the loss of lives and property. Accordingly, the central government has legislated the Special Act on Underground Safety Management, which will take effect from January 1, 2018. This law specifies an underground safety management system for securing underground safety, under which underground safety impact assessment is performed for projects involving underground excavation work that exceeds a certain size, and safety inspection is regularly performed for underground facilities and the surrounding ground. In this study, the contents of the special act on underground safety management are reviewed, and the direction of development of underground safety policy for preparing preemptive underground safety management preparation and response system is suggested.
This study proposes the improvement scheme of the current lease rate assessment system (2003~2014), as a major problem solving area, for the Terminal Operating Company (TOC)'s wharf since the introduction of the TOC system in 1997. The study considers the reform system using three criteria: standardization, simplification, and fairness. The final alternative presented by the study adopts the lease rate assessment system, which newly reflects changes of facilities' property values for aprons, combining it with the related fees of the Korean seaport dues for open storage yards, warehouses (shed), passages, buildings and lands within leased facilities. The proposal anticipates that the new system will not only minimize stakeholders' confusion, but also resolve the main problems within the current system. The study, further, introduces the adjustment ratio, which will make the new lease rate of the apron equal to the current lease rate of a berth, for the individual TOC's wharf, in order to prevent a sharp increment in the lease rate of the apron. This is because the government or port authorities as lessors, need to give priority to lightening the burden of TOC's costs under the deteriorating business environment such as the slowdown in port throughputs' growth. This study makes a contribution by suggesting a new lease rate assessment system for the TOC's wharf, reflecting the value of property as well as leading to its simplification and standardization. Additionally, it may lead to the improvement of fairness by applying the same rate to all leased wharfs for the lease rates of open storage yards, warehouses (shed) and passages. However, it has a limitation that hinders the fairness: the lease rate for the apron cannot be imposed in proportion to the leased area, by applying the individual adjustment ratios. In the future, those adjustment ratios should be, gradually, rationalized to be the same target ratio (0.5) for each wharf, following an improvement in the terminal operating business environment.
After reviewing the concept and previous studies related to green ports, this study analyzes the implications of green port policy of advanced ports in foreign countries and analyzes problems in terms of environmentally-friendly green port policy for Ulsan port, and to present sustainable green logistics establishment measures. The literature survey and Benchmarking methods are adopted as research methodology and the results are as follows. First, the pan-government climate change response management system, legislation of relevant laws, implementation of fiscal support policies, and roadmaps should be established. Second, the foundation for eco-friendly green growth should be established through the discovery of business models in conjunction with leading industries in the Southeastern Metropolitan Economic Area. Third, the Ulsan Port Greenport, such as AMP, in-port LNG propulsion ship, and ESI vessel incentive, should be built. Fourth, a low-carbon, high-efficiency sea-shuttle service shall be established through the introduction of the sea-shuttle service along the sea route. Fifth, energy self-reliant ports, including all institutions in the metropolitan Ulsan port area that have exceeded the level of Ulsan port Authority, should be built. Finally, water-type ports need to be built through the creation of coastal forests, the purification of marine water quality, and the introduction of colors to port.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.