The Transactions of the Korea Information Processing Society
/
v.4
no.7
/
pp.1804-1820
/
1997
In this paper, an efficient call control procedure is presented for next generation wireless ATM networks and its performance is mathematically analyzed using the open queueing network. This procedure is based on a new scheme called as the cell clustering. When we use the cell clustering scheme, at the time that a mobile connection is admitted to the network, a virtual cell is constructed by choosing a group of neighboring base stations to which the call may probabilistically hand over and by assigning to the call a collection of virtual paths between the base stations. Within a microcell/picocell environment, it is seen that the cell clustering can support effectively a very high rate of handovers, provides very high system capacity, and guarantees a high degree of frequency reuse over the same geographical region without requiring the intervention of the network call control processor each time a handover occurs. But since mobiles, once admitted, are free to roam within the virtual cell, overload condition occurs in which the number of calls to be handled by one base station to exceed that cell site's capacity of radio channel. When an overload condition happens, the quality of service is abruptly degraded. We refer to this as the overload state and in order to quantify the degree of degradation we define two metrics, the probability of overload and the normalized average time spent in the overload state. By using the open network queueing model, we derive closed form expressions for the maximum number of calls that can be admitted into the virtual cell such that the two defined metrics are used as the acceptance criteria for call admission control.
Proceedings of the Korea Information Processing Society Conference
/
2009.11a
/
pp.947-948
/
2009
국가정보화사업 투자효율성 향상을 위해 투자관리 체계구축의 필요성이 증가하고 있다. 세계 경제상황 악화와 새 정부의 IT 패러다임 변화도 이런 요인의 하나로 작용하고 있다. 제한된 예산 범위 내에서 다양한 정보화 수요를 적절하게 충족시키기 위해서는 성과관리를 기반으로 한 미래지향적 정보화 투자가 요구된다. 공공부문 정보화 추진 시에 예산 사업 평가관리가 일체화 되지 못해 투자관리가 효율적이지 못한 면도 있다. 본고에서는 이러한 상황을 고려해 미국의 정보화투자관리체계(CPIC) 등 국내 외의 현황을 분석해 보고 한국의 실정에 맞는 투자관리 체계를 제시하고자 한다. 아울러 국가정보화사업의 현황분석을 통해서 현장의 업무 절차를 기초로 한 투자관리 프레임워크를 제시하고자 한다. 이 프레임워크를 활용하기 위해 필요한 제도개선 등 향후과제도 살피고자 한다. 이 결과는 공공부문에서 최적화된 정보화 재원 배분을 통해 정보화 효율성 및 투자 성과 제고를 지원하기 위한 틀로 활용될 수 있다. 국가 정보화 계획 집행 평가의 전 과정을 연계하는 추진체계 및 제도 확충으로 정보화사업의 유기적 성과관리 실현에도 기여할 것으로 기대한다.
Korean Journal of Construction Engineering and Management
/
v.6
no.1
s.23
/
pp.140-150
/
2005
Recently, quality inspection and defect management have been considered as one of the major issues for increasing customer satisfaction and corporate image in domestic construction industry. However, the quality inspection and defect management have not been performed systematically because of insufficient field managers, the excessive amount of documents, complicated work process and difficulty in communicating construction information. Therefore, the field manager could not perform the quality inspection and defect management work in time as well as the reliability of recorded quality and defect data was decreased. The primary objective of this study is to propose a quality inspection and defect management system using information technology which enables field managers to efficiently gather the information of defection in apartment housing. It is anticipated that the effective use of the proposed system would be able to imp개ve communication among the related participants and systematically accumulate data that might be used in similar construction projects.
Korean Journal of Construction Engineering and Management
/
v.21
no.3
/
pp.76-84
/
2020
The rate of application of the modular plant in the plant industry is increasing, and for the success of the modularization projects, it is essential to develop and implement a systemized methodology across all phases of the project. However, Korean EPC firms lack project management capability when it comes to apply standardized methodology. Therefore, it is important to establish and systematize the cost/schedule integrated management method which are the two core elements of project management technology. This study was conducted to develop a methodology and guidelines for integrated management process for modular plant projects. The researchers developed a methodology for planning and managing cost and schedule, and integrated by module unit. Integrated cost and schedule methodology and guidelines developed can be used for various EPC modular plant projects to enhance the efficiency of project management.
Recently, owing to the increasing demand on the simplification of arrival and departure procedures, IMO's (International Maritime Organization) Facilitation Committee (FAL) is carrying out the standardization project of arrival and departure formalities and clearance form. Also, many port authorities of developed countries are making active researches for the smooth flow and efficiency of the information inbound and outbound ships by way of simplifying their formalities or through electronic means. However, this standardization project cannot be done by one country but by mutual cooperation among related nations. And to carry out this task, the first thing to be done is to standardize the formalities and document form, and to integrate information. To this end, this study has reviewed the model cases of advanced ports of developed countries with regard to their simplification and standardization efforts. And also we have analyzed the formalities and clearance form of the three countries Korea, China, and Japan. And then for the solution of common problems of three countries, this paper has suggested an ebXML-based Global Port B2B framework. Through this framework, we can reuse and automate the necessary information on the arrival and departure of ships, consequently realizing simplification, and laying a foundation for the introduction of e-commerce to the port industry.
KIPS Transactions on Software and Data Engineering
/
v.12
no.7
/
pp.285-294
/
2023
As software grows continuously in scale and complexity, the role of software architecture has become increasingly important across various industries. Although software architects often rely on their experience and intuition when designing such architecture, there is a variety of methodologies being researched for architecture design. However, these methodologies do not address the specific effects of applying multiple architectural patterns to a system or the sequence in which they should be applied. In this study, we explain the variation in architectural design results depending on the order in which the same set of architectural patterns is applied to a single system. Based on this phenomenon, we identify requirements for applying architectural patterns and propose a method of classifying the patterns to be applied. We also propose a prioritization process for requirements to efficiently apply the classified patterns in a specific order. Finally, we show a case study that prioritizing requirements based on architectural pattern types is beneficial for efficient software architecture design in terms of quality attributes.
The purpose of this study is to suggest plans to enhance client satisfaction through improving the quality of hospital administration services. For accomplishing the purpose, we conducted empirical research with classifying hospital administration services into administrative staff service, medical staff service, facility service, and institutional service. Based on the results of this study, suggestions were made as follows for improving the quality of hospital administration services. First, in administrative staff service, detailed explanations should be provided about the items of medical bills, and patients' waiting time should be reduced through fast processing and smooth cooperation among departments. Second, in medical staff service, the process of medical service should be simplified for the accurate observance of appointment schedules, and the time to start outpatient service and the time to complete the discharge process should be earlier than now. Third, in facility service, convenient facilities and resting places should be prepared, parking facilities should be expanded, and menus should be improved for clients. Fourth, in institutional service, detailed medical service costs contents should be disclosed and plans should be made for the efficiency of services.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2018.10a
/
pp.247-250
/
2018
정부는 국내산 풀사료의 경쟁력을 강화하기 위해 풀사료용 기계장비 및 제조비 등의 지원에 해마다 1,000억 이상의 예산을 사용하고 있다. 이에 수반한 보조금의 공정한 집행을 위한 절차와 서류는 매우 복잡하기 때문에 집행 및 정산에 상당한 행정비용이 발생하여 국내 생산 확대의 걸림돌로 적용하고 있는 실정이다. 또한 풀사료는 생산시점의 환경(습도, 온도 등), 수분함유량, 압축압력, 풀사료 품종 등에 따라 품질이 달라지는데 품질기준이 미흡해 유통활성화에 걸림돌이 되고 있다. 풀사료 생산이력 정보 수집에 필요한 센서, IoT 통신기술 등은 상용화 수준에 도달했으나 풀사료 생산현장에 적용하기 위해서는 풀사료 수확기 등과의 통합이 필요하고, 데이터에 기반한 과학적 정책 입안을 위한 기반 데이터 축적이 필요하다. 이를 위해 본 연구에서는 국내산 풀사료의 생산량 증대 및 유통 활성화를 위한 IoT 기반의 풀사료 생산이력관리 시스템을 개발 중으로, 우선 관리 기준이 되는 표준 데이터를 정립해 DB화(化) 하고, 풀사료 수확현장에서 필요한 데이터를 확보하기 위한 생산이력 생성장치 및 생산이력 수집장치와 이를 IoT망을 활용해 전송하기 위한 생산이력 송신장치를 개발하며 수집된 데이터를 통합 데이터베이스화(化) 하여 다양한 사용자에게 유무선 인터넷을 활용해 정보를 제공하는 웹/앱을 개발 중이다. 개발을 위한 핵심 기술로는 풀사료 수확기에 부착된 다양한 센서에서 생성되는 압력 등의 데이터를 실시간으로 취득하는 기술, 제어용 컨트롤러 설계 기술, 센서 데이터 가공 기술, IoT망을 이용한 실시간 전송 기술, 풀사료 통합 DB 구축 기술, Full Stack JavaScript 기술 등이 있다. 본 시스템를 풀사료 현장에 적용하면 풀사료 현장 조사 시간 및 비용 절감, 풀사료 생산/유통/보조 업무 전반의 효율화 및 투명화, 생산이력제 정착으로 풀사료 온라인 유통 활성화 및 물류비 절감, 센서, 측정장치, 표기장치 판매 및 유지보수 등 농업분야 신규사업 창출이 가능하다.
Journal of the Korean Society of Marine Environment & Safety
/
v.25
no.6
/
pp.698-707
/
2019
The removal of oil spilled by the sinking of a foreign ship in Korea's Exclusive Economic Zone (EEZ) began in May 2019 four years after the ship sunk near Jeju Island. The cleanup was conducted by a foreign company that was contracted to the ship-owner's protection & indemnity (P&I) insurance company. In contrast to the time taken to begin the cleanup, the operation itself was completed in just 22days. Compared to similar cases, the decision to begin the removal was a delayed one. This study analyzes all 93 documents related to the ship's sinking and the eventual cleanup, confirming delays in administrative decision-making on the removal, and identifies factors that influenced this delay. These factors include a neglect of accident-related data verification, and other, legal, technical, environmental, and human aspects. Finally, this study suggests ways to improve decision-making efficiency. As the first study dealing with the cleanup in the EEZ, this research is expected to facilitate decision-making and influence the formulation of policies in the future.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.11
/
pp.96-104
/
2018
Military vessels are complex weapon systems consisting of various integrated onboard equipment. Since their acquisition of military equipment takes a long period of time and a prototype ship is deployed and tested, vessel development has relied on its proprietary process. However, due to the growing complexity of onboard equipment technology, application of systems engineering (SE) process has become indispensable. Nonetheless, an effective design process complementing the existing design with the SE has not yet been developed. As such, we have studied an improved basic design process for submarines based on SE. To do so, we analyzed the processes for the basic design, technical review, and requirement management. Included reviews and requirements are SRR, SFR and PDR, and SSRS, SSS, and SSDD. By combining the results in the SE framework, we built an improved basic design process that can be applied in parallel with the SE-based technical review and requirement management. To assess the process, we applied our proposed model to the submarine development undergoing the basic design phase. It is possible to effectively manage the requirements, design artifacts and improve traceability, and also utilize them as test and evaluation materials. The SE-based basic design process is expected to be useful in other kinds of vessel design.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.