Due to the travelling of the train with high speed the period of maintenance activities of the ballasted track is coming to be short, and more from the residential area of the ballasted track tunnel circumference the civil appeal is increasing with railroad vibration problem. To reduce the vibration problem and a maintenance cost establishes the ballast mat in the tunnel within part segment. In this study, to estimate the vibration reduction effect of the ballast mat we have done a comparative analysis with the vibration field test by the transit train by at the ballasted track with ballast mat and the standard ballasted track without vibration protection in tunnel.
The condition of initial movement for the river bed revetment using rip rap is a limit condition beyond which the lining is progressively destroyed as the separate elements are removed by the flow. In the case of the river bed revetment using mattress, however, after the initial movement the containment offered by the mesh remains. A new situation of equilibrium with a deformed river bed revetment using mattress is obtained, allowing it to withstand more severe conditions without compromising the resistance and without further bed deformation. Shield's coefficient for the river bed revetment using mattress is twice the value of that for the river bed revetment using rip rap. This means that with the same hydraulic behavior conditions, the average dimension of the rocks to be used in the river bed revetment using mattress is half that of the river bed revetment using rip rap rock. When the same size rocks are used the allowable velocity for the river bed revetment using mattress is more than twice, even as much as 3 or 4 times that for the river bed revetment using rip rap.
Track elastic components can be technically and economically efficient when integrated well into track superstructure of a railway network. In such cases, the elastic rail pad is larger than a 800m radius curve provides smooth rail branching and allows for high-speed operation ($V{\geq}160km/h$). High track resistance causes the tamping intervals to stand out because the constantly increasing share of the sleeper pad further extends the increase of the tamping interval and the long grinding period; the engineering and construction of the small curve radius track provides some measures for reducing the solid sounds. Installation of elastic mats under the ballast can have a good effect, particularly in the context of protection against dust during construction or extensive renovation measures when laying new lines. However, such a process requires special attention and proper installation.
Ballast is an important component of railway track structures. The granular ballast can be modelled using [mite or discrete element methods. The DE method has advantages to enable us to analyze the microstructure of granular materials and to exhibit information which cannot be assessed using FE methods. In this paper, sleeper, the ballast, and ballast mat in the high-speed railroad line are modelled using two-dimensional discrete circle and line elements. The stress transferred from the sleeper via the ballast to the subgrade is analyzed. In addition, the shape and angle of stress distribution of ballast bed is evaluated with different boundary conditions for the high-speed railroad line.
Geotextile is one of the most useful and effective polymer material in civil construction works and the main function of geotextile is separation, reinforcement, filtering and drainage. Recently, because of the shortage of natural rock, traditional forms of river and coastal structures have become very expensive to build and maintain. Therefore, the materials used in hydraulic and coastal structures are changing from the traditional rubble and concrete systems to the cheaper materials and systems. One of these alternatives employs geotextile tube technology in the construction of coastal and shore protection structures, such as embankment, see dyke, groins, jetties, detached breakwaters and so on. Geotextile tube technology has changed from being an alternative construction technique and, in fact, has advanced to become the most effective solution of choice. This paper presents case history of sea dyke filter construction using geotextile tube mattress and also, various issues related to the tube mattress design and construction technology.
In high-speed line, at some part of the track which rubber ballast-mat installed, track irregularity grew rapidly and affected riding comfort and train running stability. It is urgently requested to establish counter-measures which can be applied to track under operation. To do this, it is very important to analysis the origin of that phenomenon before. Track support stiffness is an essential factor for evaluating track condition. Sudden changes of support stiffness along track occur instability of train and bad riding comfort. Preventing sudden changes of track support stiffness is a key technique in high-speed track maintenance. Besides the sudden changes, the magnitude itself also significantly affects track and train. Low stiffness of ballast-mat makes ballast acceleration area wider. And it may accelerate track irregularity growth. So, the stiffness should be limited. To calculate track stiffness, measuring load and displacement on track is needed. In this study, the behavior of the track which rubber ballast-mat installed was measured and analyzed to understand the origin of rapid growth of it.
In the case of the railway bridge, there are following the progress of works after the drainage method of a bridge surface - vibration proof rubber establishment, track gravel construction and rail construction etc. But these works are not enforced consecutively by the execution and economical reason. This is the reason of the long period of exposure after drainage execution. In many case, from the deterioration phenomenon by long term exposure of surface, there are a lot of occasions that do not keep primitive penetration depth waterproof primitive time. It is the most important that select the drainage method that have durability - it is not fallen in long-term exposure of surface. The major objective of this study is to deduce objective analysis result through examination about the Deterioration Restraining Agent method and to master KNOW-HOW of DRA drainage method. Through the study, minimize economical damage by frequent repair and reinforcement and present the reasonable standard of judgement fot drainage method of construction.
Stone columns is the ground improvement method which composed of compacted gravel or crushed stone inserted into the soft ground consisting of loose sand and clay. There are many difficulties in quantitative analysis of soil-pile interaction because settlement behavior of stone columns is affected by various parameters. In this study, various parameters of behavior of end-bearing group piles are investigated by load tests. Finally, the improved characteristics of soft ground and the influence of design parameters are investigated in this study using PR (performance ratio) value. From the PR value calculation and test results, we know that settlement behavior of stone columns is affected by area replacement ratio of composite ground, diameter of column rather than embedment ratio and mat.
Seo Young Min;Ahn Sun Bok;Jee Hong Kee;Lee Soontak
Proceedings of the Korea Water Resources Association Conference
/
2005.05b
/
pp.1388-1392
/
2005
호안 Mattress/Filter는 철망구조 내에 채움재를 채운 다공성 구조로서 다양한 크기의 채움재를 사용할 수 있고 이로 인하여 다양한 공극을 형성할 수 있다. 이러한 Mattress/Filter의 다공성 구조는 통수성을 증가시키기 때문에 호안부에서 흐름의 에너지 및 유속을 감소시키며, 이로 인해서 소류력이 감소되어 호안의 침식을 완화시킨다. 또한 Mattress/filter에 사용되는 채움재는 자갈, 폐콘크리트 및 슬래그를 사용하기 때문에 표면이 거칠고 조도계수가 증가하게 되며, 호안에서의 조도계수의 증가는 유속의 감소와 소류력 감소를 가져온다. 한편 Mattress/Filter가 시공되고 수개월이 경과되어 식생발달 및 안정화가 이루어진 후에는 식생과 Mattress/Filter가 일체화되며, Mattress/Filter와 식생에 의해 조도계수의 증가 및 유속감소의 효과가 더욱 커지면서 결과적으로 소류력 감소효과는 증가하게 된다. Mattress/Filter의 다공성 구조는 호안의 통수성 및 조도계수를 증가시켜 호안부의 유속 및 소류력을 감소시키기 때문에 침식 및 식생유실을 완화시키게 된다. 시공 초기 식생이 발달하기 전에 복토된 토양의 유실 우려가 있을 경우 Mattress/Filter의 표면에 토양유실방지매트를 설치하여 복토된 토양이 유수에 의해 침식되는 현상을 방지할 수 있다. Mattress/Filter 시공후 수개월이 경과한 뒤에는 식생이 발달하여 유속 및 소류력 저감효과가 더욱 증가하며, 이로 인해서 더욱 안정된 식생군락을 형성시킬 수 있었다.
Journal of the Korean Society of Hazard Mitigation
/
v.10
no.6
/
pp.165-174
/
2010
TTG-blocks are concrete blocks designed to be paved around the bridge piers in order to protect the channel bed from local scour. In this study roughness coefficient of T.T.G- blocks are investigated through the hydraulic model test. And critical safety weight of TTG-blocks is derived in terms of Reynolds number for each individual block and group of linked blocks. Flume experiments show that a performance of TTG-blocks is effective to protect the river channel bed from local scour at bridge piers if it is assessed using with geotextile mat under blocks or designated gravels for filling in holes of blocks.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.