• Title/Summary/Keyword: 운용시간

Search Result 1,235, Processing Time 0.036 seconds

The Study on Operability Improvement of the start motor for Auxiliary Power Unit of Rotorcraft (회전익 항공기 보조동력장치 시동모터 운용성 개선연구)

  • Lee, Gwang-Eun;Kang, Byoung-Soo;Na, Seong-Hyeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.774-780
    • /
    • 2021
  • The auxiliary power unit (APU) of a rotorcraft starts the engine during operation/flying. The APU is composed of a gas turbine engine type. The starting principle of the component is that the electric start motor generates the power required for starting by rotating the shaft. In this study, quality improvement was performed by applying an over-running clutch (ORC) between the APU and the starter motor to secure the operability of the starter motor of the APU mounted on the rotorcraft. The starter motor has the main role of starting the APU, but during operation, it is rotated without load by the rotational force of the APU gear shaft, resulting in friction at the brush. This phenomenon causes abrasion of the brush of the starter motor. Consequently, when the APU operation time increases, the brush life decreases, and the operability of the APU is affected. In this study, an ORC that separates the interlocking between the start motor brush abrasion and the APU operation time was applied to improve the operability/durability of the APU starter motor. The effect was verified through a test, and the technical feasibility of the design change was analyzed.

A study on network based long distance data interworking system using multiple unmanned vehicle (다수 무인이동체를 이용한 네트워크 기반의 원거리 데이터 연동 시스템에 관한 연구)

  • Son, Hyeon-seo;Choi, Sung-chan;Park, Jong-hong;Jung, Sung-wook;Ahn, Il-yeop
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.10a
    • /
    • pp.605-607
    • /
    • 2022
  • As the industry using unmanned vehicles expands, scenarios in which multiple unmanned vehicles are applied to various fields are attracting attention. One unmanned vehicle has limitations in operating time and range, and by using multiple unmanned vehicles, it has the advantage of providing services in a much wider range and shortening the operating time. Taking advantage of these advantages, recent attempts are being made to apply a number of unmanned mobile vehicles to fields such as disasters and broadcasting beyond military use. In this paper, we present a scenario for a data interworking system that can send and receive data from a distance based on a network using multiple unmanned vehicles.

  • PDF

A Study on the Mast Structure Vibration Limits considering the Operating Time of Naval Ships (해군 함정의 운용시간을 고려한 마스트 구조물 진동 허용 기준 검토)

  • Hyejin Kim;Hyungsuk Han;Soohong Jeon
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.27 no.5
    • /
    • pp.581-587
    • /
    • 2024
  • The mast structure of a naval ship has a lot of expensive equipment attached and is easily exposed to strong vibration due to its structural characteristics, so it is necessary to manage vibrations well to prevent equipment failure and increase operating time. Since September 2015, the Navy has been managing the vibration of the ship's mast structure with a separate tolerance standard from the local vibration, but this standard is set at 1/2 of the vibration limits for mast-mounted equipment without any engineering basis. So the establishment of new vibration limits based on the operating conditions of naval ships is required. In this study, the mast structure vibration limits were reviewed considering the actual operating time of naval ships, and the results were compared with the standards of major overseas classification societies and the actual measurements of a ship that had mast structure vibration problems.

A Design of Operational Test & Evaluation System for Weapon Systems thru Process-based Modeling (프로세스 기반의 모델링을 통한 무기체계 운용시험평가 시스템 설계)

  • Lee, Beom;Seo, Yoonho
    • Journal of the Korea Society for Simulation
    • /
    • v.23 no.4
    • /
    • pp.211-218
    • /
    • 2014
  • The Test and Evaluation (T&E) system became more important due to its advancement and complexity of the weapon system. Time and cost saving T&E related studies are in progress mainly with advanced countries. By utilizing the Modeling and Simulation (M&S) technology recently, we may save time and money. Also, overcome security and safety limitations. There are many M&S based research activities in South Korea but it is way behind of the system that some countries already have developed. i.e.; United States. This area of study requires new way of developing strategies in the T&E system of Korea. This study is to design the Operational T&E system for weapon systems based on modeling of processes. And we modeled the processes of operational performance evaluation through utilizing resources and performance modules of weapon systems and combined it with the simulation engine for 3D visualization. Through this, we propose the Operational T&E system for weapon systems based on modeling of processes that represent operational performances visually.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

A Priority Process Based Connector's Interaction considering Component Processing Time (컴포넌트 처리시간을 고려한 우산순위기반의 커넥터 상호작용)

  • Jeong Hwa-Young
    • Journal of Internet Computing and Services
    • /
    • v.6 no.2
    • /
    • pp.49-57
    • /
    • 2005
  • Connector's role between components is very important in the CBD(Component Based Development). The most connector has process ADL based rrethod was choosing FIFO method by component request. But in case many component's with various characteristics request It is difficult that this method operate efficiently, In this research, I did design and implement priority connector considering component's processing time, Also, I used Wright architecture for formal specification. Application result of proposed connector was spend more 388ms compares with existent FIFO method in total processing time. But this method could handle preferentially from components that have short processing time. Also, in case of component's waiting time in connector, existent FIFO method is 23323,1 ms and proposal method is 12731.27ms, So, proposal method could reduce waiting time for component process.

  • PDF

유압펌프의 무고장 가속시험 전략

  • Jeong, Dong-Su;Lee, Yong-Beom;Seong, Baek-Ju
    • 기계와재료
    • /
    • v.22 no.4
    • /
    • pp.68-74
    • /
    • 2010
  • 현장 운용조건하에서 사용자들이 요구하는 보증수명을 시험평가하기 위해서는 많은 시간과 비용이 소요된다. 이를 해결하기 위한 시험기술로써 흔히 가속시험이 운용되며 가속방법에는 연속적으로 사용하지 않는 제품을 연속적으로 가동시킴으로써 고장시간을 단축시키는 사용를 가속과 사용조건보다 높은 스트레스를 부과하여 제품의 수명을 단축시키는 고 스트레스 가속이 있다. 기계류 부품들에서 대부분 채택하고 있는 고 스트레스 가속방법을 적용한 무고장 가속시험의 전략은 크게 현장 운영조건하에서의 등가부하를 산출, 시험 운영조건하에서의 등가부하를 산출 그리고 보증수명에 의한 무고장 시험시간을 산출하는 3가지의 기술로 운영된다. 이러한 가속시험 전략은 기계류에 관련된 대부분의 부품 및 시스템에 적용 및 활용이 가능하다.

  • PDF

Experimental Vrification of the Sray Clculation using the Aricultural Done (농업용 방제드론의 방제면적 산출에 따른 실험적 검증)

  • Wooram Lee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.4
    • /
    • pp.569-576
    • /
    • 2023
  • An agricultural drones are gradually increasing in utilization due to economic efficiency, and consist of a main frame in charge of flying spray system in charge of moving pesticide to control targets. Therefore, the environment and characteristics of crops should be considered when controlling pesticides using drones and conditions such as systematic flying altitude of flight, speed, and spray time should be changed accordingly. However, pest control work using agricultural drones has different spray effects depending on level the operation proficiency and spray impact. In addition, there are variations in operating standards and control efficiency for agricultural drones, which hinder the distribution of agricultural control drones in the field of pest control work. Therefore, this study attempts to identify the spraying characteristics of agricultural drones, apply the effective spraying time, interval and experimentally verify the system that can calculation of spray area compared to previous studies. Through this experimental verification, it is intended to apply the optimal control process by minimizing the obstacles to pest control work by applying the operation method and systematic figures to agricultural drones.

Scenarios of HAPS Operation for frequency sharing between HAPS and Satellite (HAPS와 위성간 주파수 공유를 위한 HAPS 운용 시나리오)

  • Ku, Bon-Jun;Ahn, Do-Seob;Kim, Nam
    • Journal of Satellite, Information and Communications
    • /
    • v.4 no.2
    • /
    • pp.20-27
    • /
    • 2009
  • In this paper, HAPS operation scenario is proposed to minimize the interference from HAPS user terminal(HUT) to geostationary earth orbit(GEO) satellite receiver. The conventional scenario has been assumed for fully operated situation of HUT. However, all the HUTs could not be fully operated in a real system operation. Therefore, in order to reduce the interference to other systems, multibeam operation scenarios such as time division and adaptive time division methods are proposed and the interference effect of HUT to satellite receiver is evaluated according to various operation rate of HUT.

  • PDF

COMS Operation Design to maintain Image Quality of Optical Payloads (탑재체 영상품질 유지를 위한 통신해양기상위성의 운용설계)

  • Park, Bong-Kyu;Yang, Koon-Ho;Choi, Seong-Bong
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.87-95
    • /
    • 2007
  • The ocean and meteorological payloads of COMS are concerned to experience degration of image quality due to the disturbance induced by the motion of moving parts of the payloads. And thruster firings for stationkeeping and wheel offloading are expected to degrade the image quality of the optical payloads. In case of COMS, in order to keep the optical payload free from the mechanical interference from the other payload, the operation design approach has been taken. This paper introduces the operation design of COMS taken to avoid these problems. In order to meet users requirement by avoiding the degradation of image quality, the timeline of optical payloads and housekeeping are optimized, and operational constraints are applied to the mirror motion of the meteorological payload. This paper also introduces the results of time budget analysis performed to validate the operation design.

  • PDF