• Title/Summary/Keyword: 운영감리

Search Result 83, Processing Time 0.023 seconds

Evaluation Model for the Stability of the Diagnostic Information System Incorporating the Quantitative Evaluation (정량적 평가를 도입한 정보시스템 안정성 진단 평가 모델)

  • Im, Hyeong-Do;Park, Dea-woo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2016.05a
    • /
    • pp.313-316
    • /
    • 2016
  • Highly probable cause of the current turmoil critical national infrastructure and private enterprise information systems failures or national event of an accident, it is inevitable huge hit in corporate business as well as a significant impact on the national benefit. This is a trend subject to the stability of the national management information system has a significant impact on people and society, such as banking, telecommunications, transport and energy, which can be extended into a private institution. However, public and private ICT business through the development of Information system Audit or CMMI(Capability Maturity Model Integration) certification check the quality of the target system, but quality check on the reliability of the information system operations after construction is either not promoting met for some safety test results a situation that does not enabled by insufficient. By preventing the disorder or an accident of this study, the diagnostic reliability information systems through inspection and evaluation system development of information systems being established, and to minimize service confusion and study ways to ensure customer - oriented service.

  • PDF

A Study about Electronic Document Unification for Construction Job-site Report (건설현장보고 전자문서 일원화에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.925-928
    • /
    • 2007
  • As the field report data does not normalize, ordering organization requires different form every time and field reporters make out form as random, data and report to the ordering organization by different medium such as FAX, e-mail, paper document. Therefore, Field reporters must set and make out same information in required pattern. And ordering organization is being responsible for side works of totalizing and processing the reported data. This research suggests the electronic document unification about monthly construction progress report and construction present condition report system. In addition, it suggests electronically processing function that can handle field report business to unifying electronic documents. As using the result of this research, it will improve the work efficiency and simplify in report business.

  • PDF

Domestic current situation and Improvement plan Consideration of Electricity Design & Supervision System (전기설계.감리제도의 합리적인 운영방안에 관한 고찰)

  • Jeong, Yeon-Hae;Nam, Ki-Beom;Sin, Hwa-Yeong;Jeong, Hyeong-Yong;Lee, Jong-Hyuk;Jun, Young-Su
    • Proceedings of the KIEE Conference
    • /
    • 2007.04b
    • /
    • pp.10-15
    • /
    • 2007
  • For the introduction of the electricity of the special design and supervision system to Protect the faulty-workmanship of the electricity equipment and to reserve the electricity safety, last 1995 "Electricity Technology Management Act" were carried out enactment. March 2002, we introduced the pre-Qualification system that is selected the competent company about the electricity design and supervision service over so much capacity which is ordered by the Public institution such as the nation, local autonomous entity, government investment institute and so on. December 2005, the electricity equipment over so much capacity was taken the housing construction plan's approval by the housing act in case, the municipal or district governor with the authority to approve who selected the electricity supervision company according to the pre-Qualification system. Due to the introduction of the system, we could expect the rights and interests increase of the consumer by eradicating dumping of the close relationship between supervision company and the builder, reduction and concurrent position of the supervisor, according to confirm the quality of the electricity equipment and electricity safety. In spite of introducing of the system, the problems occured as reducing the electricity designer's task range compared with different field, modifing the supervisor's rank system rationally, because of researching about the electricity design and supervision technique lacks. Also, KEEA(Korea Electric Engineers Association) manage the caller of the electricity design and supervisor(company or people), but the problems occured as opening to the public about the curler management, introducing automatic bidding system and We need the solution plan about this. Consequently, we consider the present situation of the domestic and outside and problem about the electricity design and supervision system in this paper, try to present rational operation plan through this.

  • PDF

Standardization Analysis of 'NEC Article 690' for Photovoltaic Shutdown Technology (태양광(PV) 셧다운(Shutdown)기술 'NEC Article 690' 표준화 분석)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.22 no.3
    • /
    • pp.171-176
    • /
    • 2022
  • The communication signal for quick cut-off specification is defined as "design to support fast cut-off requirements of all applicable photovoltaic(PV) systems" in NEC 2014, NEC 2017 or the corresponding UL standard regardless of the system configuration. On the other hand, if you look at the domestic regulations related to new and renewable energy, the standards, regulations, and guidelines set by each institution are general, or only the parts necessary for the institution are being established and operated. There are many insufficient points to apply these things to photovoltaic facilities, and there are cases where excessive facilities are installed according to the design, inspection standards of supervisors and inspection agencies, and the skill level of inspectors. The internationally accepted IEC standards deal with various facility standards in detail. In each European country, there are separate facility regulations based on IEC. In particular, the performance and safety of devices are dealt with in detail, and in the case of 'NEC Article 690' applied in North America such as the United States, each item is described in detail. Therefore, in this paper, we will look at the details of the PV shutdown technology that is currently used and applied internationally.

Analysis of Basic Capabilities for Building Demolition Experts - Focused on Domestic and International Cases (건축물 해체공사 전문인력을 위한 기본역량 분석 - 국내·외 사례를 중심으로)

  • Lee, Kyung-Koo;Shin, Yong-Seob;Lee, Hyung-Yong;Chun, Jae-Youl
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • The rising number of accidents during building demolition work has significantly heightened interest in this field. This study undertakes a comprehensive analysis of the essential capabilities required for building demolition experts, drawing on both domestic and international examples. This includes an examination of training courses for building demolition inspectors and the competencies mandated for structural demolition roles as per Korea's National Competency Standards(NCS). Furthermore, the study reviews the qualification tests and training programs for building demolition professionals in the United States, Japan, and England. The research concludes that the expertise needed for demolition construction professionals should be categorized into seven key domains: legal, structural, safety, planning, operational, constructional, and environmental aspects. These competencies are further divided across three professional tiers: technician, engineer, and manager.

A Study on a Project Management Improvement Method for the Development of Next Generation Geostationary Earth Observation Satellite System (차세대 정지궤도 지구관측 위성시스템 개발 사업관리 개선 방안에 관한 연구)

  • Choi, Won Jun;Eun, Jong Won
    • Journal of Satellite, Information and Communications
    • /
    • v.10 no.4
    • /
    • pp.95-100
    • /
    • 2015
  • These days, satellite core technologies are being developed as a way to provide various information by considering simultaneously sending, wide area covering, highly precide, and anti-disaster technologies. Not only global positioning, and image but also space launcher, satellite bus, satellite payload, earth station are being convergently developed in a different technological field. Especially, it is required a lot of initial investing expenditure to provide the Earth observational information service based on the space technologies. Such a trend and change of satellite technologies Korea has realized the necessity for the domestic independent development of next generation earth observation satellites, and are preparing the profound items such as a detailed implementation plan for the efficient development project. Like the satellite advanced countries, it should be transparently carried out that an efficient implementation of the developing target related to the geostationary earth observation satellite development, establishment of technological auditing function and quality assurance system, implementation plan, progressing courses and results of the satellite development program by way of planning, evaluation and management. For these things cited above, it is necessary to operate systematically and continuously the professional structural system by the governmental department in order to control the geostationary earth observation satellite development project. Therefore, this study proposes a development project management improvement method of the Korea next generation geostationary earth observation satellite based on the development project management system of the domestic geostationary satellite system.

A Study on the Post-Evaluation of Landscape Design Competition based on Ground Theory - Case of Gwanggyo Lake Park in Korea - (근거이론을 활용한 조경현상설계의 사후평가 - 광교호수공원을 사례로 -)

  • Hong, Youn-Soon;Park, Jae-Min
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.44 no.5
    • /
    • pp.92-102
    • /
    • 2016
  • While there have many completions of large parks recently under development, there has been a dearth of quality assessments. Studies focused on post-evaluation have been made to resolve this, but most of these are biased toward user satisfaction after completion and therefore behaviour analysis has limitations on solving problemsduring the actual design implementation processes. Therefore, this study examined the internal phenomenon and structure of the implementation process of design competition through the ground theory and microscopic independent perspective. As a result, maintaining the identity and differentiation of parks derived from the preserved design competition scheme contributed greatly to completeness and satisfaction. Outcomes were mainly caused by the trust of public officials as the ordering organization, the will of policy decision-makers, and the competence of operational enterprises, etc. Negative factors such as undermining the whole concept of the park and landscape occurred as external pressure and related subjects intruded on change design factors due to variations in social conditions. Additionally, illogical construction processes occurred, such as a reinvestigation of the budget for restoration after damaging on original landscape. There have been needs for the improvement of the work processing system. On balance, an interventional role is very important in the park construction process, especially the PA and operation committee in terms of maintaining the basic direction, landscape design supervision for detailed designs, and expert construction management on LA in terms of rational work management in the field. The study, using the microscopic perspective of the designer and ground theory, deliver significant meaning as an early study by suggesting alternative methods for the after-evaluation of large parks and structurally looking into main influence factors driven during the construction process.

A Study on Improving Architect Property Insurance for Safety Accidents of Building (건축물 안전사고에 대비한 건축사 손해보험 개선 연구)

  • Kim, Myeongsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.32-40
    • /
    • 2019
  • This study analyzed operating condition and the problems of damage compensation insunace (property insurance) for qualified architect and derived some suggsetions for improvement. The Certified Architects Act requires all building design and construction supervision to buy property insurance. This study proposes following suggestions to solve problems of current architect property insurance. Firstly, we need to increase the insurance purchasing rate of damage compensation insurance for qualified architect. It is necessary to clearly specify the matters concerning the submission of insurance policies by the architects, which is currently carried out by the Minister's official letter, in the form of official announcement. Secondly, proper insured amount should be adjusted. In order to insured substantial compensation capacity, total amount of insurance should be enlarged. Thirdly, the insurance period should be extended to one year after completion of building to allow compensation for accidents due to design negligence. Generally, the design defect can mostly be identified within one year after completion. Fourthly, insurance coverage should be extended. In the long run, it is essential to enlarge the scope of the security not only to property damage but also to human losses. Finally, an accident record sharing system should be established among insurance companies, so that proper insurance premiums or discounts can be made based on the system.

A Study on the Influencing Factors for the Establishment of a Public Asset Management System Based on AHP-ISM (AHP-ISM기반의 공공자산관리 관리체계 영향요인 도출 연구)

  • Lee, Han-Sol;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.403-414
    • /
    • 2022
  • Many studies have been conducted on asset management of public facilities, as the importance of such management has been increasing. This basic study aims to present strategies for the practical use of public asset management, and seeks to propose efficient management and utilization measures from a cost perspective by comparing and analyzing the importance and impact relationship between cost items for public asset management. In this study, 19 sub-items and the top 4 items were chosen by deriving cost factors based on the previous literature. A survey was conducted, and the results of the survey were analyzed by using the Analytic Hierarchy Process(AHP) and Interpretive Structural Modeling (ISM) methods. The AHP was used to derive the priority between items, and ISM was used to identify major groups and mutual influences. As a result, those items showing both high priority and high importance, such as user cost, dismantling/disposal cost, replacement cost, maintenance/repair cost, etc. are determined as priority items to be considered for public asset management of public facilities. Also, it is necessary to minimize the impact on other items in public asset management by those items which are impacted less by other items but have significant impact on the items such as initial construction costs, conceptual design costs, construction costs, and supervision costs. It is expected that the results and analysis methods presented in this study can be used to provide strategies for asset management of public facilities.

Problems Analysis and Revitalization Plan of Urban Development Projects by the Land Readjustment Method (환지방식에 의한 도시개발사업의 문제분석 및 활성화대책)

  • Kim, Hyoung-Soo;Lee, Young-Dai;Lee, Jun-Yong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.37-46
    • /
    • 2009
  • This research will focus on the public agencies, designers, supervisors, building cooperation, and contractor who involved in urban development plan. By understanding the complexity and the priorities in urban development process, all problems of the urban development projects can be solved or improved. These priorities are specified using AHP (Analytic Hierarchy Process). A questionnaire survey is employed to identify the problems of urban development process and the methods of revitalizing urban in this research. Through the survey, 35 issues are drawn out. Factor analysis technique is applied to extract the underlying interrelationships possibly existing. Using latent root criterion and varimax rotation method, 9 factors are extracted(by using 34 issues after deleting 1 issue less than 0.4 of factor loading) These 9 factors named as PIF (Problem Improvement Factor) consist of integration estimation (PIF1), cooperation operation capability (PIF2), contractor corporation capability (PIF3), capital for infrastructure investment (PIF4), misunderstanding of effective land use (PIF5), financial capability (PIF6), obscure goal of project (PIF7), shortage of cooperation expertise (PIFS), administrative procedures (PIF9). PIF 6 is the most important factor and PIF 1 is the most widely effective factor to succeed urban land development projects. It is recognized that administrative office is most responsible for PIF1 cooperation is most responsible for PIF2, 7, 8 and 9; contractors is most responsible for PIF3 and PIF6; administrative agencies is most responsible for PIF4; cooperation and consultants are responsible for PIF5. From findings in this study, some suggestions are proposed for the revitalization methods of urban development projects through the land readjustment method.