Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.

A Study for Deriving Target CMV (Compaction Meter Value) of Intelligent Compaction Earthwork Quality Control (토공사 지능형 다짐 품질관리를 위한 목표 CMV(Compaction Meter Value) 도출 방안에 관한 연구)

  • Choi, Changho;Jeong, Yeong-Hoon;Baek, Sung-Ha;Kim, Jin-Young;Kim, Namgyu;Cho, Jin-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.9
    • /
    • pp.25-36
    • /
    • 2021
  • Recently, the intelligent compaction technology for quality control of earthworks has brought attention as a quality control standard for earthworks. In this study, intelligent compaction technology and earthwork quality control methods were investigated and earthwork quality control procedures using intelligent compaction technology were considered based on field tests. Through the field compaction test of the silty sand (SM) fill material, it was confirmed that CMV and bearing capcaity index from plate load tests increased as the number of compactions increased. Based on the field test data, the average CMV and quality control target CMV were derived. The target CMV (34.2) was calculated through the correlation with the bearing capacity index of the plate load test, and the target CMV (36.6) was calculated through the analysis of the CMV increase rate. In this paper, the on-site compaction quality management procedure and methodology using intelligent compaction technology were discussed, and an intelligent compaction quality management method was proposed to promote the applicability of the technology.

SIP시공말뚝의 지지력특성

  • 이명한;윤성진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.04a
    • /
    • pp.91-115
    • /
    • 1993
  • 최근 환경문제에 대한 사회적 관심이 고조됨에 따라 말뚝항타로 인한 지반진동, 소음 등이 각종 건설현장에서 심각한 문제점으로 대두되고 있다. 지반을 굴착하고 cement paste를 주입한후 기성말뚝을 삽입하는 SIP공법은 이러한 건설환경 여건의 변화에 부응하여 그 적용이 급속히 증대되고 있다. 그러나 국내에서 SIP공법으로 시공딘 말뚝의 재하시험 결과는 각종 문헌에서 제시학 있는 지지력 산정공식들과는 상이한 특성을 나타내 주고있다. 또한 말뚝의 품질관리를 위한 시험결과는 상당한 지지력 미달현상이 발생학 있는 것으로 나타나고 있어 본 공법에 대한 지지력 특성이 규명되어야 할 필요가 있다. 본 논문에서는 국내에서 시공된 사례들을 중심으로 SIP공법의 지지력 특성을 분석하여 보았다.

  • PDF

A Study on Marine Pile Construction Management by Real-Time Kinematic GPS Positioning (RTK-GPS 측량에 의한 해상파일 시공관리에 관한 연구)

  • 강길선
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.21 no.4
    • /
    • pp.393-401
    • /
    • 2003
  • Automatic control technologies for the marine pile driving provides accurate and rapid intruding into the planned positions of the pile with planned slope and direction, so that the construction maintenance and management are more efficient and the quality of the construction is more promising. Therefore, in this study, the application scheme of RTK GPS to the automatic control of the pile driving presented. It is expected that the presented scheme using the precise RTK GPS technique assures the efficient and economic 3D positioning accuracy for the precise marine construction management like the precise foundation of marine structures made of piles and the dredging work. It is found that the suggested scheme decrease 60% of the construction error compared with specifications reference because marine position accuracy is measured within 4cm in real time. In addition, the automatic position control system using GPS reduced the construction period and cost compared with existing methods about 30% and 35%, respectively.

Evaluation Model for Design Quality using Change Order Analysis (설계변경 분석을 통한 설계품질 평가모델)

  • Lee Seung-Heon;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.72-79
    • /
    • 2000
  • Design quality in constructed project is a primary consideration to achieve overall project objectives. It is not easy to evaluate the design quality because various factors are involved in the design process. This paper presents a new approach to improve the evaluation process of design quality In the construction project The evaluation model is developed to satisfy the requirement for implementing the ISO 9000 Quality Assurance Standards in the design process. It is assumed that design changes are resulted from the poor management of design quality. The model relates design changes to design quality management items. It assigns weight ratio to each design quality item to evaluate quantitatively Design Quality Index (DQI) is calculated to assess design quality based on the Objectives Matrix. A case study is performed to illustrate the practical implementation of the design quality evaluation.

  • PDF

The Effect of PMIS Quality on Project Management Success (PMIS의 품질이 프로젝트관리의 성공에 미치는 영향 분석)

  • Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.117-126
    • /
    • 2010
  • As one of the key IT applications, the project management information system (PMIS) has played a significant role in construction management processes. This is because PMIS is an information system that gathers, integrates, and disseminates the output of project management processes among project participants, and is used to support all aspects of a project, from initiation through closing. This paper aims to identify the CSFs(Critical Success Factor) of Project Management and quality associated with Project Management Information System (PMIS) in construction projects, to analyze the Effect of PMIS quality on Project Management Success. The CSFs of Project Management and the quality components for PMIS are identified through a review of the literature, and consolidated through interviews with professionals in the construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor), and 253 completed questionnaires were retrieved. To increase the applicability of the results, the respondents consisted of workers spread across various parts of the construction site. Using SPSS 12.0, the data was used to analyze the relationship between PMIS Quality and Project Management Success through multiple regression analysis. These findings help to clarify what the highly prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

A View on Water-Leakage and Countermeasure of Concrete Structure (콘크리트 구조물의 누수와 대처 방안에 대한 견해)

  • 오상근
    • Magazine of the Korea Concrete Institute
    • /
    • v.14 no.6
    • /
    • pp.14-19
    • /
    • 2002
  • 과연 콘크리트 구조물에 있어서 누수 균열은 문제가 되는 것일까? 이에 대해 설계, 구조 시공, 재료(콘크리트), 방수, 품질 및 안전의 관련 전문가는 여러 가지 이견을 말하고 있다. 또한 콘크리트 구조물에 관계하는 발주자, 건축주, 사용자, 시공자의 입장도 상황에 따라 다르게 해석하고, 평가하고 있다. 예를 들면 일반적으로 발주자(건축주 등)는 시공자에게 누수 균열은 하자이므로 무조건 보수할 것을 요구하는 반면 사용자(언론 포함)가 문제를 제기할 때(공공공사의 경우) 발주자는 이에 대해 크게 문제되지 않는다고 답변하는 경우도 많다. 어떤 기술자는 콘크리트의 누수 균열은 피할 수 없는 사항이므로 근본적으로 해결할 수 없으므로 완벽한 시공 및 보수는 어렵고, 다만 전체적인 누수량이 어느 정도 이하가 되도록만 관리할 뿐이라고 말하고, 또한 지하 구조물의 누수 균열은 피할 수 없어, 누수를 시각적으로 가리기 위한 보호벽을 쌓아 관리하는 것이 당연하다고 말하는 기술자도 있다. 그럼에도 불구하고 일반 사용자들은 무조건 누수균열이 없어야 한다고 의견을 제시하고 있다. 특히 언론에 구조물 누수의 문제가 수시로 보도되어 관계자 및 관련 건설기술자들의 자존심이 크게 훼손되고, 이를 보수하기 위한 비용이 엄청나게 지출되고 있음을 볼 때 적당히 간과해서는 안될 문제임에는 틀림없다.(중략)

Performance test of Concrete IoT Management System for concrete early-age quality control (콘크리트 초기 품질관리를 위한 CIMS의 개발성능 Test)

  • Lee, Young-Jun;Choi, Yoon-Ho;Seo, Hang-Goo;Hyun, Seung-Yong;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.161-162
    • /
    • 2019
  • The aim of the research is analyzing the performance of the concrete IoT management system invented with similar technique from 'G' company to certify the performance of CIMS. As a results, the compressive strength assessing performance was compared. Since both systems assess concrete compressive strength with maturity method based on measured concrete temperature, both systems measured concrete temperature similarly, and maturity was calculated similarly. Therefore, the assumed compressive strength values were similar for both systems. Therefore, through the test, compressive strength assessing performance of CIMS was considered as a similar level of the 'G' company's system. Furthermore, it is considered that the CIMS has an additional advantage of reusability, adding capability of additional sensor, and wider range of Bluetooth communication.

  • PDF