Abstract
There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.
대부분의 건축 토목공사의 기초공사 시 사용하는 기성콘크리트 파일공사의 굴착 및 파일 매입 작업의 경우 국내 시방기준에는 파일을 연직으로 시공해야한다는 것만이 명시되어 있을 뿐, 이에 대한 측정기준 및 시공기준이 제시되어있지 않으며, 대부분의 시공현장에서는 숙련노무자의 경험을 통한 육안측정에 의존하고 있는 실정이다. 본 연구의 목적은 기수행된 PHC 파일 시공성능 향상을 위한 연직 자동제어기 파일롯타입(pilot-type) 연구를 바탕으로 PHC파일 시공 시 균일한 시공품질을 확보하고 작업의 안전성 확보 및 생산성 향상을 위한 파일 연직 자동제어기 프로토타입(prototype)을 개발하는 것이다. 본 연구를 통해 제시된 PHC 파일 연직 자동제어기가 현장에 적용될 경우, PHC 파일 연직도 측정 및 제어의 자동화를 통해 품질 및 안전성 향상이 가능할 것으로 기대된다.