A Study on the Development Fluid Mechanics Principles by WBI Learning Program (유체역학의 원리 학습을 위한 WBI 프로그램 개발 연구)

  • Son, Young-Bae;Park, Dea-Woo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.14 no.10
    • /
    • pp.2324-2330
    • /
    • 2010
  • In middle and high school to learn the principles of fluid mechanics to Experiments in space and time constraints and difficulties for the study of the principles of fluid mechanics to the problem is superficial. In this paper, Pascal's principles, Archimedes' Principle, Bernoulli's Theorem, etc. learning about the fluid mechanics and implemented in Web Browser, In connection with flash and HTML, web simulation is to implement. Web Based Instruction program that implemented a comparative analysis became an effect of 15% to industrial total high school students in satisfaction, Interest, Achievement. The fluid mechanics education through engineering design and web design through the actual web server is implemented on the Internet over broadband. Department of Education, this study the fluid mechanics and the Internet will contribute to the development of distance education.

A Study on the Application Technology of Multi-dimensional Urban geo-spatial Simulation using Digital Image (디지털 영상의 다차원 도시공간 시뮬레이션 적용기술연구)

  • 연상호;박희주;홍일화
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2003.05a
    • /
    • pp.255-259
    • /
    • 2003
  • The technique of birdeye image generation of terrain through the use of satellite digital images and digital maps are very important elements and have applications in planning establishment as well as the actual design of several construction work in complex fields. This paper studies stereo perspective image generation as a possibility through 3-dimensional analysis combined with digital elevation data and remotely sensed images. For this, first of all, ortho-images generated by very accurate GCP and DEM from contour file makes 3-dimensional terrain analysis possible and allows stereo-viewing at the highway construction planning sites. So, we developed the technical methods for the 3-dimensional approach on the planning sites of highways by use of perspective orthoimages. From this research diverse terrain analysis is possible through stereo perspective image generation, and can leads to various application in road construction through gain study results from access to realtime virtual spatial on the objects area in korea.

  • PDF

Analysis of the Right of Light According to Construction (구조물 설치에 따른 일조권 영향 분석)

  • Choi, Hyun;Han, Byoung-Cheol;Son, Kyeong-Sook;Kang, In-Joon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.22 no.2
    • /
    • pp.95-103
    • /
    • 2004
  • Recently, many troubles about the right of light have been arising ceaselessly as taller and more dense the buildings have been in the urban. The present time, the right of light is not stipulated legally. For solving above problems, there spend so too much lawsuit expenses and time on the damages about construction stopped and delayed, according to subjective decisions instead of scientific and rational solutions. The past studies of the right of light weren't based on the analytic data and depend on the simple view of point. So, those of studies gave trust to people hardly, only were treated as the ways on the decision about construction among non-engineers. Therefore, this paper studies the efficient solution of problems about the right of light through analysis about mass of sunlight according to season and the hour using a simulation technique on the civil construction.

Effect of the Eave Width and the Vertical Rain Proof Facilities on Ventilation and Air Velocity Distribution in Hanwoo Loose Barn (개방한우사의 처마와 수직 비가림시설이 환기와 풍속 분포에 미치는 영향)

  • Lee, Seung-Joo;Jo, Hyeon-Jun;Kim, Dong-Hoon;Gutierrez, Winson M.;Chang, Hong-Hee
    • Journal of agriculture & life science
    • /
    • v.45 no.4
    • /
    • pp.87-93
    • /
    • 2011
  • This study was carried out to determine more effective way in eave structure between lengthening roof just as standard plan and replacing 3 types of vertical rain roof facility by using computational fluid dynamics (CFD) simulation to reduce the heat stress of Hanwoo, increase the effect of dryness of room floor, rain proof and ventilation efficiency. The simulation which did with mean wind velocity (1.2 m/s) result showed that the case of lengthening of roof just as standard design was more effective than the cases of vertical establishment of rain proof facility.

Development of 4D System Linking AR and 3D Printing Objects for Construction Porject (AR과 3D 프린팅 객체를 연계한 건설공사 4D 시스템 구성 연구)

  • Park, Sang Mi;Kim, Hyeon Seung;Moon, Hyoun Seok;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.2
    • /
    • pp.181-189
    • /
    • 2021
  • In order to increase the practical usability of the virtual reality(VR)-based BIM object in the construction site, the difference between the virtual image and the real image should be resolved, and when it is applied to the construction schedule management function, it is necessary to reduce the image gap between the virtual completion and the actual completion. In this study, in order to solve this problem, a prototype of 4D model is developed in which augmented reality (AR) and 3D printing technologies are linked, and the practical usability of a 4D model linked with two technologies is verified. When a schedule simulation is implemented by combining a three-dimensional output and an AR object, it is possible to provide more intuitive information as a tangible image-based schedule information when compared to a simple VR-based 4D model. In this study, a methodology and system development of an AR implementation system in which subsequent activities are simulated in 4D model using markers on 3D printing outputs are attempted.

Development of BIM-based Work Process Model in Construction Phase (시공단계의 BIM기반 건설사업관리 업무절차 모델 개발)

  • Yu, Yongsin;Jeong, Jiseong;Jung, Insu;Yoon, Hobin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.133-143
    • /
    • 2013
  • BIM can be utilized variously in construction management(CM) in the respect that it helps to manage comprehensively the construction information and make reliable decisions, but the adoption of BIM is insufficient in the CM area. The purpose of this study is to develop work process models and their guides in order to utilize BIM effectively in CM work at construction stage. This study defined BIM functions as 'BIM converting design', 'Model review', 'Data extraction', 'Automatic estimate', '4D simulation', 'Drawing creation', 'Engineering sector linkage analysis' through literature search, and generated CM works applicable to BIM by analyzing the CM work and process. This study developed BIM-based CM work process models by reconstructing the existing work process in connection with BIM function through an analysis on the relationship between BIM function and CM work, and reconstructing the role of each project participants. In order to improve the usefulness of the developed models, guides that described the BIM works of project participants were prepared through interviews and case studies. To validate the utilization of the models, a comparative analysis on the BIM process of precedent studies was also made and a survey was conducted on experts. This study can contribute to increasing the utilization of BIM in the CM area and can be helpful for CM companies to develop an in-house BIM guide. In the future, it will be necessary to make an assessment on the models from a business perspective through case applications and constantly update BIM-based CM work process model in consideration of the expansion of CM work due to the application of BIM.

Estimation of Resistance Bias Factors for the Ultimate Limit State of Aggregate Pier Reinforced Soil (쇄석다짐말뚝으로 개량된 지반의 극한한계상태에 대한 저항편향계수 산정)

  • Bong, Tae-Ho;Kim, Byoung-Il;Kim, Sung-Ryul
    • Journal of the Korean Geotechnical Society
    • /
    • v.35 no.6
    • /
    • pp.17-26
    • /
    • 2019
  • In this study, the statistical characteristics of the resistance bias factors were analyzed using a high-quality field load test database, and the total resistance bias factors were estimated considering the soil uncertainty and construction errors for the application of the limit state design of aggregate pier foundation. The MLR model by Bong and Kim (2017), which has a higher prediction performance than the previous models was used for estimating the resistance bias factors, and its suitability was evaluated. The chi-square goodness of fit test was performed to estimate the probability distribution of the resistance bias factors, and the normal distribution was found to be most suitable. The total variability in the nominal resistance was estimated including the uncertainty of undrained shear strength and construction errors that can occur during the aggregate pier construction. Finally, the probability distribution of the total resistance bias factors is shown to follow a log-normal distribution. The parameters of the probability distribution according to the coefficient of variation of total resistance bias factors were estimated by Monte Carlo simulation, and their regression equations were proposed for simple application.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

A study on full-face sequential blasting using electronic detonator (전자뇌관을 이용한 수직구 전단면 다단시차 분할 발파에 대한 연구)

  • Yoon, Ji-Sun;Kim, Su-Hyun;Bae, Sang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.10 no.2
    • /
    • pp.177-184
    • /
    • 2008
  • In this study, in order to reduce appeals regarding vibration and noise from blasts, the optimum delay-time of the electronic detonator, which can minimize blast vibration, is found through blast-waveform composition and blasting simulation, and we have developed the full-face Sequential Blasting Method based on the studies of damping properties of full-face section blasting. The optimum delay-time of the electronic detonator and Full-face Sequential Blasting Method using electronic detonator was applied to the Gyeongbu high-speed railway construction site to test the feasibility of this method.

  • PDF

A Study on the Automated Estimating System using BIM based Library (BIM 기반 토목 라이브러리를 통한 견적자동화시스템에 관한 연구)

  • Han, Jung-Hoon;Nam, Sang-Hyeok
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.12-18
    • /
    • 2011
  • The BIM techniques which manages information over the life cycle of construction project based on the 3-dimensional model are developing in the direction of integrated construction management including planning, design, analysis, estimation, 3D simulation and so on. The estimation model based on the BIM has different detail level and model information. In this study, the LOD of estimation model is catched for the bridge structures. The library classes are defined with construction information classification system, and the quantities of resources are calculated by class parameter using Microstation API. Finally, the automated estimation system using BIM based library is verified by the integrated model for adjustments of level of detail.