• Title/Summary/Keyword: 시공프로세스

Search Result 334, Processing Time 0.029 seconds

A Study on the Construction Process of Agricultural Facilities (농촌 시설물 건설 프로세스 분석)

  • Shin, Han-Woo;Kim, Tae-Hui;Kim, Gwang-Hee;Cho, Hyung-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.151-154
    • /
    • 2008
  • In today's agriculture, there has been an increase in the construction of agricultural facilities due to the need to maximize land usage and many customer demands for products. But many agricultural facilities are constructed by not qualified construction company so it often causes many accidents like breakdowns and repairs. this study is to understand the construction process of agricultural facilities. The results of this research are that greenhouse is lack of the law of contract and the performance and need for the construction process supervision. Vinyl House is needed to supervise the design of the structure.

  • PDF

A Study on the Design and Application of 3D Information Model for Bridge (교량의 3차원 정보 모델 구축 및 적용에 관한 연구)

  • Lee, Yoon-Bum;Lee, Kwang-Myong;Park, Na-Yeon;Han, Song-I;Park, Kyung-Lae;Lee, Chung-Hee
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.230-233
    • /
    • 2010
  • 최근 건설업계는 전통적인 2차원 문서 환경에서 3차원 디지털 정보 환경으로의 전환이 가속화되고 있다. 하지만 3차원 정보의 적용 방법론에 관한 연구는 아직 미진한 실정이다. 기존의 2차원 기반 건설프로세스와 다르게 3차원 정보 모델은 3차원의 형상 정보를 기반으로 하여 건설 프로세스의 효율성을 향상시키고자 제안되었다. 본 논문에서는 실제 교량의 시공 단계에서 3차원 정보 모델을 구축하고 활용함으로써 그 효율성을 검증하였다. 대상 교량은 PSC 박스거더 형식의 군장대교 접속B교이며 3차원 정보 모델 구축을 위하여 대상 교량에 대한 분류체계를 정의하고 3차원 형상 모델을 생성하였다. 또한 시공 단계 업무에 3차원 정보 모델을 활용함으로써 시공 효율성 향상을 확인할 수 있었다.

  • PDF

Application of Lean Theory to BIM-Based Coordination - A Case Study on Process Re-Engineering of MEP Coordination - (린 기법의 BIM 기반 설계조율 프로세스 접목 - 설비전기 설계조율 프로세스 재설계 사례연구 -)

  • Jang, Se-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.1
    • /
    • pp.67-79
    • /
    • 2018
  • This paper provides theoretical deformation of lean concept and its application for usage of building information modeling (BIM) process. Recently, much research is focused on application of lean concept for more efficient usage of BIM. The lean theory and its basic function and feature is based on manufacturing industry. The manufacturing process can be improved by process re-engineering steps of lean concept which consist of the steps of value, value stream, flow, pull, perfection. However manufacturing process and construction process has different characteristics. Due to the differences, five steps of the traditional lean's process re-engineering can't be directly applied to the BIM based engineering process. In order to solve this problem, we conduct analysis on the characteristics of the manufacturing process and BIM based engineering. We propose modified and expanded concept of lean for process re-engineering and the modified theory was applied to the mechanical, electrical and plumbing (MEP) coordination process. Through the proposed 8 steps of methodology, 2D based process was changed to integrated and using BIM based MEP coordination process. In addition, the results showed the potentiality of cost reduction and process improvement. The results of this study can be a foundation for the theoretical combination of lean and a variety part of construction engineering process.

차세대 도시폐기물 소각설비의 이해

  • Seong, Baek-Nam
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.38 no.10
    • /
    • pp.5-11
    • /
    • 2009
  • 본 내용은 당사가 Turn-key방식으로 설계시공일괄입찰방식으로 시공후 현재 운영중인 C시 광역소각시설의 설계 시공 및 운영을 중심으로 개요와 특징에 대해서 소개하고자 한다. 본 프로젝트는 현재 시공이 완료되어 정상가동중에 있으며 사업의 배경 및 목적 개요, 그리고 이 프로젝트에서 국내 최초 적용한 병행류식 스토커 타입 소각로 및 처리프로세스를 소개하고자 한다.

  • PDF

Development of Component Design Process for Automated Construction System (시공 자동화 시스템에 적합한 부재 디자인 프로세스 개발)

  • Jin, Il-Guan;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.76-86
    • /
    • 2009
  • Recently automated construction system is attended in construction domains because of the increase of aged workers and the shortage of the experienced. So, the proportion of automated construction in Korea is expected to be getting higher from partially automated robots to full automation systems. However, it is difficult for the automated system to operate flexibly like the human based on various work condition. In the result, the higher the level of automation in the system is, the less efficient the automated system work in the site. So, it's necessary the development component design to compensate for the flexibility shortage of the system. Therefore, this study proposes the development process to component design suitable for automated construction system using QFD technique.

A Basic Study on the Development of the BIM Service Level Assessment Process (BIM 서비스 수준 평가 프로세스 개발을 위한 기초연구)

  • An, Ji-Won;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.1
    • /
    • pp.87-93
    • /
    • 2019
  • In recent years, BIM services have been used in many construction projects. However, they are raising the question that there are many differences between what was initially proposed and what was actually done. In the IT sector, a method called as SLA is used to perform an assessment of the services delivered to the IT service project. In this respect, this study intends to introduce this method into building construction projects to use BIM in order to propose evaluation criteria and the evaluation process for SLA-based BIM service. The BIM service assessment process and criteria presented are judged to help introduce consistent and systematic BIM services in construction projects.

Cost Management System for Mechanical, Electrical, and Plumbing(MEP) Coordination Using Building Information Modeling(BIM) - A Case Study (BIM 기반 MEP 설계 조율 프로세스 분석을 통한 비용 관리 시스템 개발 사례 연구)

  • Won, Jongsung;Ham, Sungil;Jang, Sejun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.195-205
    • /
    • 2022
  • This paper aims to propose a cost-based mechanical, electrical, and plumbing(MEP) coordination process using building information modeling(BIM). The proposed process can help project participants eliminate identified clashes between the MEP elements, analyze trends relating to MEP costs during the coordination process, and share their findings. MEP quantity-related information extracted through BIM was integrated with the cost database and schedule information. To check the applicability of the proposed process, it was applied to a construction project in South Korea. Through the application of the proposed process, MEP-related cost was reduced.

Improving Construction Operations Through Applications of 6 Sigma Management Techniques for Superstore Projects (6시그마 기법의 적용을 통한 대형 할인점 공사의 시공성과 향상)

  • Lee, Seung-Hyun;Lee, Hang-Bok;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.185-193
    • /
    • 2007
  • In order to improve the performance of succeeding superstore construction projects, it is essential to find out an effective way for applying the opportunities of improvement on their repetitive construction process based upon the analysis of various success or failure cases occurred on previous similar projects. This research study suggests a way to improve their construction process through the applications of six sigma techniques on superstore construction projects. A literature review was implemented on the basic concept of six sigma and its general performance steps, and the step by step applications of six sigma techniques were accomplished regarding to the speciality of superstore construction projects. The opportunities of improvement for superstore projects were figured out, and the result of their applications on other superstore projects was analyzed. As a result, it was found that the adoption rate of identical success or failure cases was increased. Also, there were several improvement effects on the projects such as $10{\sim}20$ days of time savings by projects, decrease of reworks by preventing failure cases, quality and safety improvement. These results indicate that the six sigma techniques are applicable and valuable for improving the repetitive process of superstore construction projects.

Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.

A Study on the Usage of Digital Design Tool on Architectural Design Process (건축 프로세스에서의 Digital Design Tool 활용에 관한 연구)

  • Jeon, Hyun-Woo;Choi, Jong-Chon;Kim, Khil-Chae
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.567-572
    • /
    • 2009
  • 본 연구에서는 국외 설계사무실과 국내 설계사무실의 수행 프로젝트(표1)를 디지털 디자인 프로세스에서의 디지털 도구 활용 사례조사 결과를 일련의 설계 프로세스(기획(Pre-Design), 계획 설계(Schematic Design) 중간설계(Detail Design), 실시설계(Construction Design))를 11개의 설계 단위작업((1)자료수집, (2)도서화작업, (3)의사소통/프레젠테이션, (4)협력업체와의 협업, (5)디자인 실험, (6)디자인분석/유효성 검토, (7)빌딩시스템과 자재선정, (8)자재비교/견적, (9)디자인 발전, (10)RP를 이용한 모델 제작, (11)시공/제작)으로 분류하여(설계프로세스별로 디지털 디자인 툴의 활용 빈도를 조사 분석하는 것은 프로세스별로 중복된 설계 단위작업이 진행됨으로 연구결과의 의미가 잘못 해석될 수 있다.) 그 활용에 대한 유형을 분석하고 이를 바탕으로 설계과정에서의 디지털 디자인 툴의 활용특성을 도출하여 실무설계의 기초자료를 제공하는데 그 목적을 둔다.

  • PDF