Korean Journal of Construction Engineering and Management
/
v.8
no.1
s.35
/
pp.57-65
/
2007
Rebar work is a labor intensive operation, and with labor shortage and high-wage era, the cost is rising, so re-bar manufacturing system in plant is adapted. However there remains a lot of problems. Although manufacturing system in plant, which greatly effects the building's safety, endurance, and construction time, is an important phase in construction, it holds serious problem of quality and productivity deterioration due to its characteristic of intensive-labor and maintaining of old work methods resulting in poor management, and costs increase. Therefor in this study to investigate current situation and problems of rebar work in plant and to find methods of betterment, a survey was conducted to factory engineers in 18 companies.
Ground vibration caused by blasting in the urban area close to structures can give some indirect damage to human body and may lead to structural damage to buildings. At the stage of design or when complaints were filed by residents, the test blasting in borehole, which is most practical for expressing simple vibration wave form quantitatively, is usually chosen for assessing the degree of damage to structures. In this paper, some lessons gained from the application of electronic detonator triggering system in borehole test blasting are presented. The difference in delay time of detonator when borehole is blasted by electronic detonator and electric detonator are discussed. The peak particle velocities measured at the structure embedded in the similar rock layer to main line of tunnel at test site and measured at the road surface just above the tunnel having different overburden layers were analysed to draw their relationship. By comparing the results with those appearing in some published literatures, the usefulness of the borehole test blasting and the importance of delay time of detonator are addressed.
Anchor heads a recommonly exposed to surface weathering processes that cause physical damage by vibration and external forces. This study presents a new method of anchor-head installation that uses near-surface embedding based on analyses of concrete block failure. ABAQUS 3D numerical modeling performed to compare this method with the standard technique and to analyze the distribution of displacement and the stress pattern. In addition, application of the method to a real-world case was tested by in-situ measurements. The results show a maximum vertical stress of 9.73 MPa and vertical displacement of 1.34 mm. Field tests indicated that displacement of a concrete block was 3 to 4 times greater than that of an embedded bearing plate.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.24
no.3
/
pp.251-259
/
2006
For the electrification of the existing railways, the security of the restriction boundary of building with mechanistic stability research on the antiquated tunnel must be accomplished essentially. If the tunnel don't secure its restriction boundary of building, the reconstruction based on improvement of tunnel alignment are generated and its surveying data are required. The precise surveying was conducted with the same coordinate system for three tunnels of Youngdong tramline, and the restriction boundary of building of the straight and curve section were analyzed effectively by acquiring the data of profile and cross section, profile rail-height, rail-grade, cross tunnel height, and restriction boundary of building. This study is presented for valuation data of the stability of the electrification design to construct and analyze restriction boundary of building, which compared with the drawing and its existing design using profile and cross section. After this, it is interoperable to increase the development of real-time monitoring system on the tunnel structures.
A lot of underground construction projects have been conducted by economical, social and military purposes in Korea for the last three decades. As a result, magnificent amount of data were obtained from geological site investigations, laboratory and field tests, design and field monitoring. But up to now, these valuable informations were neither systematically stored nor utilized efficiently resulting in a great loss of time and money. In this study, a database system named GeoINFO was developed using Microsoft Access 97 for management of informations which can be obtained from underground construction. The developed database system is especially designed to cover three major types of underground facilities-tunnels, underground storages and rock slopes and has multi-layered tree structures for data input. The system also has a unique indexing system for efficient data search using Visual Basic code.
Bridges are rated at two levels by either Load Factor Design (LFD) or Allowable Stress Design (ASD). The lower level rating is called Inventory Rating and the upper level rating is called Operating Rating. To maintain bridges effectively, there is an urgent need to assess actual bridge loading carrying capacity and to predict their remaining life from a system reliability viewpoint. The lifetime functions are introduced and explained to predict the time-dependent failure probability. The bridge studied in this paper was built 30 years ago in rural area. For this bridge, the load test and rehabilitation were conducted. The time-dependent system failure probability is predicted with or without rehabilitation. As a case study, an optional rehabilitation is suggested, and fir this rehabilitation, load rating is computed and the time-dependent system failure probability is predicted. Based on rehabilitation costs and extended service lifes, the optimal rehabilitation is suggested.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.1
/
pp.822-826
/
2015
This study investigated the possible use of vibration from polyvinylidene fluoride(PVDF) film to enhance the performance of the deteriorated tunnel drainage due to physical/chemical clogging of the fine particles through a series of laboratory experiments. The test program was consisted of two different experiments, fundamental investigation and drainage model test. In the fundamental investigation, flow of clay slurry mixed with 50% water (freshwater and brine) on PVDF film with various frequencies was examined. In the model tests, slurry clogging to the woven fiber attached to drainage pipe and its reduction by vibration was investigated. Results of the experiment show that vibration from PVDF film enhances the drain performance significantly. Based upon the investigation, it gives an essential data that are needed for a potential use of hybrid drainage system with PVDF.
Kim, Joo-Yong;Lee, Sang-Youn;Ko, Hyun-Il;Cho, Chong-Du
Transactions of the Korean Society of Mechanical Engineers A
/
v.34
no.12
/
pp.1829-1836
/
2010
The district heating system distributes the heat generated from a cogeneration plant to wider locations. In this process, the district heating pipe (DHP) is subjected to internal and external loadings. The internal loadings are generally caused by the operating conditions such as water temperature and internal pressure. Frictional interactions between the pipes and the soil contribute to the external loadings. Thus, investigation of the mechanisms of failure of DHPs will help to guarantee both mechanical stability and heating efficiency. In this study, we investigate the local buckling of DHPs using limit state design (LSD). Two methods are considered: the use of the limit state for the width-thickness ratio and the use of the limit state for the strain. The results are used to confirm that the DHP is stable under local buckling. Finally, we suggest a minimum preheating temperature for avoiding local buckling.
Ma, Hyang Wook;Oh, Hyun Chul;Kim, Dong Wook;Kong, Davon;Shim, Chang Su
Journal of Korean Society of Steel Construction
/
v.24
no.6
/
pp.725-734
/
2012
A new modular pier system using concrete filled circular steel tubes was suggested to realize modular bridge substructures for accelerated bridge construction. Structural details and connection details were proposed by connection multiple concrete filled tubes (CFT) for standardized products of fabrication, delivery and erection. Static tests were performed for the modular pier with suggested details under lateral load conditions for weak and strong axes. Due to the eccentricity by the bracing system, the modular pier showed 5.23 times higher flexural stiffness and 6 times greater flexural strength from the test. It is proper for the rational design to evaluate stress and deformation by frame modeling of the modular CFT pier. Structural capacity of the pier can be obtained by adjusting the spacing of the CFT columns. Design recommendations were derived from the test.
최근 국내 연안역에는 관광의 활성화 등의 목적으로 잔교가 많이 가설되고 있다. 그러나 잔교의 설계에 대한 규정이 없어 현재는 항만 및 어항설계기준을 준용하여 설계하고 있는 실정이며, 또한 지역적 특성을 반영하지 못하고 건설되어 과다한 단면을 사용하는 경우가 많고, 경제성이나 경관성을 갖추지 못한 경우가 많은 실정이다. 본 연구에서는 합리적인 잔교용 설계기준을 마련하기 위한 기초적인 연구로써 지반조건을 고려한 잔교의 거동특성을 분석하고자 하였다. 이를 위하여 해석모델을 개발하고, 다양한 해석조건에 대한 해석을 수행하여 그 특성을 정리하고자 하였다. 이를 통하여 잔교의 합리적인 구조시스템을 개발하고, 설계기준을 정리하는데 이바지 하고자 한다. 이 연구에서는 서해안의 연약지반을 고려하기 위해 지반스프링을 이용한 해석모델을 개발하고, 다양한 해석조건에 대한 해석을 수행하여 그 특성을 파악하고자 하였다. 조립식 잔교는 Capbeam, Wood Deck, ㄱ형강, Pile로 네 가지의 구성으로 이루어지고, 이 네 가지 요소의 재료는 강재로 사용하였으며, 하중에 대해서는 항만 및 어항설계기준을 준용하여 군중하중 $5kN/m^2$, 월파력 $20.1kN/m^2$을 사용하였고, 풍하중은 도로교 설계기준을 이용하여 산정한 $3.309kN/m^2$을 사용하였다. 재하하중 및 하중에 대한 최적단면에 대한 연구를 활용하여 본 연구에서는 지반조건의 영향, Capbeam과 Pile의 크기변화, 사항 등의 영향을 고려하였을 때 각 구성요소에서 발생하는 단면력의 변화와 축력, 접합부 모멘트 등의 외력과 내력을 정리하여 잔교의 거동특성을 파악하고자 하였다. 다양한 변수해석을 수행하기 위하여 지반조건을 고려한 2D 해석모델을 개발하였으며, 본 연구에서 고려한 군중하중, 풍하중, 월파력의 설계하중 중에서는 월파력이 지배적인 것을 알 수 있었다. Pier의 지름이 증가 하면 작용하는 월파력이 커지고 따라서 단면력이 증가하는 것을 알 수 있었다. 그러므로 합리적인 Pier의 크기 결정이 경제적이고 경관이 우수한 잔교 건설에 중요 요인임을 알 수 있다. 본 연구는 잔교의 설계기준 정립에 기초자료로 활용할 수 있을 것으로 판단되나, 보다 합리적인 잔교의 설계와 시공을 위해서는 지속적인 연구가 필요한 것으로 판단된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.