In line with the sharp increase of container traffic from globalization, ships have become larger with an aim of improving the maritime transport capacity in addition to the growing interest in monitoring danger areas on ships considering the quantity increase of ships, along with the tightening of international standard for ship safety by IMO(international Maritime Organization). Korea established a location based ship accident forecasting and preventing system in 2012 by Korea Coast Guard, however its poor response in ship accidents has been pointed out in the wake of the recent disaster of Sewol ferry. To resolve this problem, this study attempts to design a wearable type, instant emergency response system that has DGPS to issue an alert on danger areas and automatically send ship's location and operation information in emergency situation.
Kim, Hyo-Gyu;Ryu, Ji-Oh;Song, Seog-Hun;Jung, Chang-Hoon
Journal of Korean Tunnelling and Underground Space Association
/
v.19
no.3
/
pp.409-420
/
2017
The amount of ventilation required in making the tunnel ventilation plan is an important factor for determining the capacity of the ventilation system. The amount of pollutant emission for each type of vehicle (basic emission amount for the design of ventilation volume) for estimating the required ventilation amount is based on the 'Standard for Allowing the Emission for the car manufacturing', proposed by Ministry of Environment. However, in 2013, the Ministry of Environment announced the 'Regulations on the calculation method of total emissions from vehicles' as a regulation for calculating the pollutants emitted from vehicles. In this regulation, there are the 'Emission factors for each type of vehicle'. Therefore, it is necessary to review the application of the Regulation to the estimation of the required ventilation volume for the road tunnel. In this study, the influence of the strengthened emission regulation in 2015 caused by the case of manipulation of emission volume for the diesel vehicle on the calculation of the required ventilation volume in the road tunnel has been checked. In addition, in this study, the required ventilation volume calculated according to the Standard for Allowing the Emission for the car manufacturing revised by Ministry of Environment and "Emission factors for each type of vehicle" and that calculated according to the EURO emission standard were compared for analysis. This study has implications that it provides the basic design data for calculating the reasonable ventilation capacity of the ventilation system based on the ground for calculating the required ventilation volume.
Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
Journal of Korean Tunnelling and Underground Space Association
/
v.22
no.4
/
pp.401-417
/
2020
As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.
The recent tragic outbreak of fire at the Grenfell Tower in the United Kingdom compels all branches of government to reexamine and reassess the safety measures against fires in high-rise buildings from a broad perspective. Accordingly, this study examined what problems stem from the current evacuation codes by comparative analysis of the high-rise apartment evacuation codes that range over various individual laws before introducing a new evacuation code. The outcome of this study can be utilized as basic data for amending the existing evacuation codes for high-rise buildings. The codes related to high-rise building evacuation include the Building Act, the Housing Act, the Skyscraper Disaster Management Act, and the Fire-Fighting System Act. Some local governments have also drawn up their own codes and put them into practice. Comparative analysis of the major evacuation codes has helped identify a variety of problems, such as different codes being applied to each individual law and ordinance, the use of additional codes other than the provisions of laws and ordinances, and the in effectiveness of evacuation codes. Most of these problems occur when diverse codes are applied to a single building, which means that cooperation among the relevant ministries is urgently needed to improve the related codes in the future.
"National important facilities" refers to facilities that have a great influence on national security and people's live s if enemy occupation, destruction, or functional paralysis is imposed by the Ministry of Defense Directive. In view of the case of nuclear plant hacking and the attack on the government building "National important facilities" could be the target of anti-social crimes. In the meantime, the "National important facilities" check is limited to the facilit y survey. so The purpose of this study is to develop generalized requirements. Therefore, comparing the requiremen ts of ISO 9001:2015 and ISO 27001:2013. There are only 8 differences(operating) out of 1-10. And the rest are used in common. In addition, we confirmed that the results of comparing the cases of domestic and foreign CPTED are within the "Six Principles". In Chapter 8, the principle of application of CPTED was inserted and the certification re quirements of the "National important facilities" management system were derived.
Moon, In Sang;Moon, Il Yoon;Jeong, Eun Hwan;Park, Soon Young
Journal of Aerospace System Engineering
/
v.11
no.4
/
pp.48-53
/
2017
Liquid rocket engines (LREs) are very complex systems that include combustion chambers, turbopumps, gas generators, ducts and tubes, valves and etc. Most components of the LREs require higher than or equal to level 6 IT (ISO Tolerance). The components along with pipe line and/or tubing must dispose not to interfere each other. In addition, effectiveness of maintenance and service after assembling should be considered when the allocation of the components are determined. Especially at the stage of the development, tolerance accumulations or unpredictable errors may result in misalignment and/or mismatches at interfaces of the parts. Namely, it is the engine assembling process that many inherent risks are realized and crises or incidents occur. Therefore, a rapid reaction system should be prepared. In this research, 7 tonf class liquid rocket assembling process was studied and actual building steps were introduced.
Park, Jeongjun;Chung, Heeyoung;Moon, Joon-Bai;Choi, Hangseok;Lee, In-Mo
Journal of Korean Tunnelling and Underground Space Association
/
v.18
no.5
/
pp.453-467
/
2016
Overall risks that can occur in a shield TBM tunnelling are studied in this paper. Both the potential risk events that may occur during tunnel construction and their causes are identified, and the causal relationship between causes and events is obtained in a systematic way. Risk impact analysis is performed for the potential risk events and ways to mitigate the risks are summarized. Literature surveys as well as interviews with experts were made for this purpose. The potential risk events are classified into eight categories: cuttability reduction, collapse of a tunnel face, ground surface settlement and upheaval, spurts of slurry on the ground, incapability of mucking and excavation, and water leakage. The causes of these risks are categorized into three areas: geological, design and construction management factors. Bayesian Networks (BN) were established to systematically assess a causal relationship between causes and events. The risk impact analysis was performed to evaluate a risk response level by adopting an Analytic Hierarchy Process (AHP) with the consideration of the downtime and cost of measures. Based on the result of the risk impact analysis, the risk events are divided into four risk response levels and these levels are verified by comparing with the actual occurrences of risk events. Measures to mitigate the potential risk events during the design and/or construction stages are also proposed. Result of this research will be of the help to the designers and contractors of TBM tunnelling projects in identifying the potential risks and for preparing a systematic risk management through the evaluation of the risk response level and the migration methods in the design and construction stage.
This study aimed to design an evaluation system applicable to permanent record management institutions, focusing on the Seoul Archives, in order to implement the reevaluation of permanent record management institutions. As a process for this, an area for evaluating evidence, administrative, and historical values was established and detailed evaluation factors were derived. In order to effectively apply the set evaluation factors, the evaluation procedure was designed by dividing them into three stages. In the first stage of law-based evaluation, long-term preservation was determined by identifying the position and legal form of policymakers that can be immediately evaluated according to clear standards. Records that have not been determined for long-term preservation were reorganized into evaluation factors, such as record management standards, official document classification tables, pledges, and policies, which are the second stage of business function-based evaluation, and then comprehensively applied to review the validity of long-term preservation of held records. In the second stage of evaluation, records that were not judged as long-term preservation were judged by applying historical events, cultural assets, and collection policies in the subject-based evaluation stage, which is the third stage of evaluation. The designed evaluation system can find significance in minimizing the arbitrariness reflected in the evaluation and increasing the efficiency of the evaluation, and it has been confirmed that it is possible to evaluate comprehensively reflecting the various contexts and values of the records. In addition, a re-evaluation system suitable for permanent records management institutions was established by combining balanced macro-evaluation and micro-evaluation.
Nomaguchi, Kanemasa;Forsdyke, Ken L.;Brown, Denver E.
Composites Research
/
v.17
no.2
/
pp.41-48
/
2004
"Phenolic composite", one of safety composites was chosen to build rolling stock in England while it was applied to building materials in London Underground facilities. This paper was written by Mr. Denver E. Brown. He emphasizes, from visibility and toxicity points of view, phenolic is the best and Mr. Forsdyke says, there is no question, passenger's lives are No. 1 issue, material recycling is not No.1! not No.1!
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.14
no.3
/
pp.119-124
/
2014
In this paper, we propose the active rule system applying with emotional margin for power saving control. The proposed system in this paper is a part of the system which derives smart power saving by adjusting the illuminance using active rules within compromising the user's emotion. For this, we set the specific range of standard illuminance and the lower bound of user's emotional margin of illuminance based on measurements and analysis, and use these data in design of active rules. And then, we design and implement the active rule system using mobile agent. The mobile agent in the proposed system migrates to the destination sensor nodes, acquires and transmits sensor data according to the purpose and needs through the active rules, and directly executes the actions corresponding to the optional events(changed sensor data and/or time etc.). And then, we show the potential applicability of the proposed active rule system in various active sensor network applications through the interaction with the rule base and mobile sensor network middleware system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.