• Title/Summary/Keyword: 설계기준사건

Search Result 40, Processing Time 0.026 seconds

Emergency response system for safe operation of ships (선박 안전운전을 위한 응급대응 시스템 설계)

  • Kim, Yong Su
    • Smart Media Journal
    • /
    • v.5 no.3
    • /
    • pp.81-87
    • /
    • 2016
  • In line with the sharp increase of container traffic from globalization, ships have become larger with an aim of improving the maritime transport capacity in addition to the growing interest in monitoring danger areas on ships considering the quantity increase of ships, along with the tightening of international standard for ship safety by IMO(international Maritime Organization). Korea established a location based ship accident forecasting and preventing system in 2012 by Korea Coast Guard, however its poor response in ship accidents has been pointed out in the wake of the recent disaster of Sewol ferry. To resolve this problem, this study attempts to design a wearable type, instant emergency response system that has DGPS to issue an alert on danger areas and automatically send ship's location and operation information in emergency situation.

A study on the effects of exhaust emission standards on the required ventilation rate in vehicle tunnels (차량 배출가스 규제기준이 소요환기량에 미치는 연구)

  • Kim, Hyo-Gyu;Ryu, Ji-Oh;Song, Seog-Hun;Jung, Chang-Hoon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.409-420
    • /
    • 2017
  • The amount of ventilation required in making the tunnel ventilation plan is an important factor for determining the capacity of the ventilation system. The amount of pollutant emission for each type of vehicle (basic emission amount for the design of ventilation volume) for estimating the required ventilation amount is based on the 'Standard for Allowing the Emission for the car manufacturing', proposed by Ministry of Environment. However, in 2013, the Ministry of Environment announced the 'Regulations on the calculation method of total emissions from vehicles' as a regulation for calculating the pollutants emitted from vehicles. In this regulation, there are the 'Emission factors for each type of vehicle'. Therefore, it is necessary to review the application of the Regulation to the estimation of the required ventilation volume for the road tunnel. In this study, the influence of the strengthened emission regulation in 2015 caused by the case of manipulation of emission volume for the diesel vehicle on the calculation of the required ventilation volume in the road tunnel has been checked. In addition, in this study, the required ventilation volume calculated according to the Standard for Allowing the Emission for the car manufacturing revised by Ministry of Environment and "Emission factors for each type of vehicle" and that calculated according to the EURO emission standard were compared for analysis. This study has implications that it provides the basic design data for calculating the reasonable ventilation capacity of the ventilation system based on the ground for calculating the required ventilation volume.

Risk analysis for sidetrack construction during subway tunnel operation (기존 지하철 터널 운영 중 대피선 건설 시공 리스크 분석)

  • Jun, Jonghun;Chung, Heeyoung;Koh, Sung-Yil;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.401-417
    • /
    • 2020
  • As an increasing demand for rapid railway transportation, the construction of sidetrack is inevitable to operate local and express trains simultaneously. However, the current technologies for the sidetrack construction method require a long construction period by interrupting the operation of the existing subway line, as well as cause a huge economic loss. Thus, it is necessary to study the sidetrack construction method under the special situation that the subway is in operation and to analyze the risk of the existing tunnel enlargement process for the sidetrack construction. Therefore, in this paper, the Government Complex Gwacheon station on Subway Line 4 was considered as a target station for the virtual sidetrack construction and the optimal sidetrack construction plan was derived. Subsequently, the application of risk management process was carried out in the order of identifying risk, risk response planning, performing a risk analysis, risk monitoring and control for potential risk events during the construction of sidetrack under the subway operation. A total of eight potential risk events and risk mitigation methods were selected, and a risk assessment matrix was established using the five-step risk probability and impact level criteria to perform the risk assessment including residual risks. Based on the results of the risk assessment, the risk grade and the reduction effect of each risk mitigation method were confirmed.

A Study on Identifying Problems by the Comparative Analysis of High-Rise Apartment Evacuation Design Codes (고층 아파트 피난설계기준 비교분석을 통한 문제점 도출 연구)

  • Hwang, Eun-Kyoung;Seo, Dong-Goo
    • Fire Science and Engineering
    • /
    • v.31 no.6
    • /
    • pp.47-52
    • /
    • 2017
  • The recent tragic outbreak of fire at the Grenfell Tower in the United Kingdom compels all branches of government to reexamine and reassess the safety measures against fires in high-rise buildings from a broad perspective. Accordingly, this study examined what problems stem from the current evacuation codes by comparative analysis of the high-rise apartment evacuation codes that range over various individual laws before introducing a new evacuation code. The outcome of this study can be utilized as basic data for amending the existing evacuation codes for high-rise buildings. The codes related to high-rise building evacuation include the Building Act, the Housing Act, the Skyscraper Disaster Management Act, and the Fire-Fighting System Act. Some local governments have also drawn up their own codes and put them into practice. Comparative analysis of the major evacuation codes has helped identify a variety of problems, such as different codes being applied to each individual law and ordinance, the use of additional codes other than the provisions of laws and ordinances, and the in effectiveness of evacuation codes. Most of these problems occur when diverse codes are applied to a single building, which means that cooperation among the relevant ministries is urgently needed to improve the related codes in the future.

Developing the requirements of "National Important Facilities" according to the certification criteria of (ISO) (국제표준화기구(ISO)의 인증기준에 준하는 「국가중요시설」의 요구사항 개발)

  • Yim, Heon-Wook
    • Convergence Security Journal
    • /
    • v.17 no.3
    • /
    • pp.65-71
    • /
    • 2017
  • "National important facilities" refers to facilities that have a great influence on national security and people's live s if enemy occupation, destruction, or functional paralysis is imposed by the Ministry of Defense Directive. In view of the case of nuclear plant hacking and the attack on the government building "National important facilities" could be the target of anti-social crimes. In the meantime, the "National important facilities" check is limited to the facilit y survey. so The purpose of this study is to develop generalized requirements. Therefore, comparing the requiremen ts of ISO 9001:2015 and ISO 27001:2013. There are only 8 differences(operating) out of 1-10. And the rest are used in common. In addition, we confirmed that the results of comparing the cases of domestic and foreign CPTED are within the "Six Principles". In Chapter 8, the principle of application of CPTED was inserted and the certification re quirements of the "National important facilities" management system were derived.

Research on the Assembling Process of 7 tonf Class Small Liquid Rocket Engines (7 tonf 급 소형 액체로켓엔진 조립 체계 연구)

  • Moon, In Sang;Moon, Il Yoon;Jeong, Eun Hwan;Park, Soon Young
    • Journal of Aerospace System Engineering
    • /
    • v.11 no.4
    • /
    • pp.48-53
    • /
    • 2017
  • Liquid rocket engines (LREs) are very complex systems that include combustion chambers, turbopumps, gas generators, ducts and tubes, valves and etc. Most components of the LREs require higher than or equal to level 6 IT (ISO Tolerance). The components along with pipe line and/or tubing must dispose not to interfere each other. In addition, effectiveness of maintenance and service after assembling should be considered when the allocation of the components are determined. Especially at the stage of the development, tolerance accumulations or unpredictable errors may result in misalignment and/or mismatches at interfaces of the parts. Namely, it is the engine assembling process that many inherent risks are realized and crises or incidents occur. Therefore, a rapid reaction system should be prepared. In this research, 7 tonf class liquid rocket assembling process was studied and actual building steps were introduced.

Overall risk analysis of shield TBM tunnelling using Bayesian Networks (BN) and Analytic Hierarchy Process (AHP) (베이지안 네트워크와 AHP (Analytic Hierarchy Process)를 활용한 쉴드 TBM 터널 리스크 분석)

  • Park, Jeongjun;Chung, Heeyoung;Moon, Joon-Bai;Choi, Hangseok;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.5
    • /
    • pp.453-467
    • /
    • 2016
  • Overall risks that can occur in a shield TBM tunnelling are studied in this paper. Both the potential risk events that may occur during tunnel construction and their causes are identified, and the causal relationship between causes and events is obtained in a systematic way. Risk impact analysis is performed for the potential risk events and ways to mitigate the risks are summarized. Literature surveys as well as interviews with experts were made for this purpose. The potential risk events are classified into eight categories: cuttability reduction, collapse of a tunnel face, ground surface settlement and upheaval, spurts of slurry on the ground, incapability of mucking and excavation, and water leakage. The causes of these risks are categorized into three areas: geological, design and construction management factors. Bayesian Networks (BN) were established to systematically assess a causal relationship between causes and events. The risk impact analysis was performed to evaluate a risk response level by adopting an Analytic Hierarchy Process (AHP) with the consideration of the downtime and cost of measures. Based on the result of the risk impact analysis, the risk events are divided into four risk response levels and these levels are verified by comparing with the actual occurrences of risk events. Measures to mitigate the potential risk events during the design and/or construction stages are also proposed. Result of this research will be of the help to the designers and contractors of TBM tunnelling projects in identifying the potential risks and for preparing a systematic risk management through the evaluation of the risk response level and the migration methods in the design and construction stage.

A Study on the Design of the Appraisal System of Permanent Archival Institutions : Focused on the Seoul Metropolitan Archives (영구기록물관리기관의 재평가체계 설계 연구 서울기록원을 중심으로)

  • Lee, Eunjung;Kim, Dabeen;Kim, Sunyou;Kim, Heejin;Ryu, Hanjo
    • The Korean Journal of Archival Studies
    • /
    • no.76
    • /
    • pp.5-37
    • /
    • 2023
  • This study aimed to design an evaluation system applicable to permanent record management institutions, focusing on the Seoul Archives, in order to implement the reevaluation of permanent record management institutions. As a process for this, an area for evaluating evidence, administrative, and historical values was established and detailed evaluation factors were derived. In order to effectively apply the set evaluation factors, the evaluation procedure was designed by dividing them into three stages. In the first stage of law-based evaluation, long-term preservation was determined by identifying the position and legal form of policymakers that can be immediately evaluated according to clear standards. Records that have not been determined for long-term preservation were reorganized into evaluation factors, such as record management standards, official document classification tables, pledges, and policies, which are the second stage of business function-based evaluation, and then comprehensively applied to review the validity of long-term preservation of held records. In the second stage of evaluation, records that were not judged as long-term preservation were judged by applying historical events, cultural assets, and collection policies in the subject-based evaluation stage, which is the third stage of evaluation. The designed evaluation system can find significance in minimizing the arbitrariness reflected in the evaluation and increasing the efficiency of the evaluation, and it has been confirmed that it is possible to evaluate comprehensively reflecting the various contexts and values of the records. In addition, a re-evaluation system suitable for permanent records management institutions was established by combining balanced macro-evaluation and micro-evaluation.

How Phenolic Composites were chosen - In Case of England (2) (페놀 컴포지트 실용화의 길 - 영국의 경우 (CASE STUDY 2))

  • Nomaguchi, Kanemasa;Forsdyke, Ken L.;Brown, Denver E.
    • Composites Research
    • /
    • v.17 no.2
    • /
    • pp.41-48
    • /
    • 2004
  • "Phenolic composite", one of safety composites was chosen to build rolling stock in England while it was applied to building materials in London Underground facilities. This paper was written by Mr. Denver E. Brown. He emphasizes, from visibility and toxicity points of view, phenolic is the best and Mr. Forsdyke says, there is no question, passenger's lives are No. 1 issue, material recycling is not No.1! not No.1!

Active Rule System Based on User's Emotional Margin for Power Saving Control (절전제어를 위한 사용자 감성마진 적용 능동규칙시스템)

  • Lee, Yonsik;Jang, Minseok;Kang, Sunkyung
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.14 no.3
    • /
    • pp.119-124
    • /
    • 2014
  • In this paper, we propose the active rule system applying with emotional margin for power saving control. The proposed system in this paper is a part of the system which derives smart power saving by adjusting the illuminance using active rules within compromising the user's emotion. For this, we set the specific range of standard illuminance and the lower bound of user's emotional margin of illuminance based on measurements and analysis, and use these data in design of active rules. And then, we design and implement the active rule system using mobile agent. The mobile agent in the proposed system migrates to the destination sensor nodes, acquires and transmits sensor data according to the purpose and needs through the active rules, and directly executes the actions corresponding to the optional events(changed sensor data and/or time etc.). And then, we show the potential applicability of the proposed active rule system in various active sensor network applications through the interaction with the rule base and mobile sensor network middleware system.