• 제목/요약/키워드: 물량 산출

검색결과 213건 처리시간 0.022초

실내도면 작성과 물량산출을 위한 모델 개발에 관한 연구 (A Study on the Model Development for Production of Interior Drawings and estimation of Quantities)

  • 정례화;이승우;추승연
    • 한국실내디자인학회논문집
    • /
    • 제19호
    • /
    • pp.30-37
    • /
    • 1999
  • This study presents a methods on the construction of integrated system for the purpose of automation of design plans, calculation of quantity of materials and estimation by abstracting information on building materials which is produced on the course of three dimension modeling by using computer. Therefore, an object oriented methodology is introduced to compose design informations in three dimension, space for unifying building informations, and expressing properties of building factors and materials, and to construct a database for computers to recognize architecture informations. An object indicates a conceptual individual existing in real world or existence of individual and necessity in composing a building could be called as objects such as column, wall, beam, slab, door and window and these contain materiality and immateriality. It is systemized to which properties of these building's objects are installed by the user of computer and by API(Application Programming Interface), chosen informations automatically converse to each unit work such as design plan structure plan, calculation of amount of materials, etc.

  • PDF

합성 PC 라멘조를 위한 물량산출 시스템 (Quantity survey system for column-beam structure comprised of composite precast concrete members)

  • 임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.48-49
    • /
    • 2014
  • Green Frame is a column-beam system that uses composite precast concrete members. Previous studies have proven this system to be not only structurally safe, constructible, and economically feasible, but also environmentally-friendly. If the computerized program is used to estimate the quantity, the result of it shall be calculated much easily, quickly and exactly than manual estimation, because precast concrete members of Green Frame has standard size and connection method between it. Therefore, this study suggest quantity survey concept for column-beam structure comprised of composite precast concrete members. Hereafter, the quantity survey of Green Frame shall be much quickly and accurate, if the system would be made based on the result of this study.

  • PDF

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

선박충돌 방지를 위한 교각 위치에 따른 PSC 박스거더의 형상변화 구속조건 (Constraints of Variational Section of PSC Box Girder by Placing Piers for Protecting Ship Collision)

  • 안현정;김효진;김봉근;이상호
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2010년도 정기 학술발표대회
    • /
    • pp.41.2-41.2
    • /
    • 2010
  • 하천, 해상 등에 위치한 교량 설계시 선박충돌을 방지하기 위해 교각 위치를 변화시킬 필요성이 발생한다. 이 때, 교각 위치에 따른 변단면을 갖는 PSC(Prestressed concrete) 박스거더의 형상 변화를 효과적으로 변경하기 위해 고려해야하는 구속조건을 추출하고 정의하였다. PSC 박스거더는 변단면 시공에 일반적으로 적용되는 FCM(Free cantilever method) 공법이 착용된 교량을 착용했으며, 구속조건 정의를 위해 설계지침서를 분석하여 구속조건으로 작용하는 매개변수를 추출하였다. 정의한 구속조건의 적용성을 검증하기 위해 파라메트릭 모델링을 수행하였으며, 그 결과로 생성된 모델에 대한 물량을 산출하여 대상교량에서 산출된 실제 물량과 비교 분석하였다.

  • PDF

구조설계정보 통합 관리에 의한 철근 물량 산출 자동화 기초 연구 (Basic study about Automatic Rebar Quantity Estimation Integrated with Structural Design Information)

  • 성수진;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.109-110
    • /
    • 2015
  • Estimation of rebar quantity may be used as an index to evaluate the economic feasibility of structural designs. However, when using the software to estimate the rebar quantity, there may be some limitations such as data loss caused by human errors and estimation delays caused by increased input time, since the information on arrangement of rebar is inserted manually. To solve the problems of such quantity estimation software, it is necessary to develop a method on automatic input/output of structural design information for quantity estimation and an algorithm for accurate estimation of rebar quantity. The purpose of this study is to improve the existing rebar quantity estimation by connecting with the database on information related to rebar estimation and the algorithm for rebar estimation, in order to develop an algorithm to estimate an accurate, net rebar quantity. The study result can be used as basic data for development of software for efficient structural designs and automatic framework estimation of buildings.

  • PDF

실무 기반 건축공사 물량산출 교육용 컨텐츠 개선 방안에 관한 연구 (A Study on the Improvement of Practice-based Construction Quantity Takeoff Educational Contents)

  • 박지환;최창훈;한충희;이준복
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.217-218
    • /
    • 2015
  • There are various standards and manuals on the quantity takeoff for construction estimation. However, a lot of time and money has been spent on retraining because of difference between practice and education. Therefore, the main purpose of this paper is to suggest improvement to analyze problems and limitations of the existing educational content for quantity takeoff. In order to achieve research objective, comparative analysis for quantity takeoff contents is carried out. This study will be extended to assist in effective quantity takeoff in building projects by supplementing the existing issues with quantity takeoff contents and developing a BIM-based quantity takeoff multimedia contents that use diverse media to increase the understanding on the subject for a non-professional.

  • PDF

합성 PC 부재의 철골 물량산출 알고리즘 기초연구 (Basic study of algorithm for steel quantity analysis of composite precast concrete members)

  • 김경주;임채연;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.96-97
    • /
    • 2014
  • Green Frame is a column-beam structure built by steel frame joints embedded in the columns and beams. Here, the steel frame embedded in the columns and beams is not a standardized product, instead it needs to be order-produced. The quantity for each steel frame size should be calculated to estimate the quantity of steel frames to be manufactured. However, it is highly time-consuming and requires a lot of effort in calculating the quantity of steel frames, for there are a wide range of steel frame types that are embedded in the columns and beams. To solve this problem, the study proposes an algorithm for calculation of the amount of steel frames with ease and promptness. When a program is developed using the algorithm proposed in the study in connection to the information on precast concrete members prepared in the design phase, it is anticipated that the manpower required as well as the manufacturing time will be decreased.

  • PDF

BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구 (Quantity Takeoff for Non-Selection Work Items based on BIM)

  • 박상헌;윤선재;구교진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 추계 학술논문 발표대회
    • /
    • pp.92-93
    • /
    • 2019
  • Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

  • PDF

경쟁 전력시장에서 발전기 유지보수계획을 고려한 입찰전략수립 (Generator Maintenance Scheduling for Bidding Strategies in Competitive Electricity Market)

  • 고용준;신동준;김진오;이효상
    • 에너지공학
    • /
    • 제11권1호
    • /
    • pp.59-66
    • /
    • 2002
  • 수직 통합된 체제의 전력회사가 6개의 발전회사와 1개의 판매회사로 분리되고 전력거래소를 통한 전력거래가 본격화되면서 발전회사는 자체 소유 발전설비의 공급가능용량을 어떻게 활용하느냐에 따라 영업상 수익의 영향을 받게 된다. 특히, 하루 전 발표되는 한계가격(System Marginal Price, Base Load Marginal Price)에 맞도록 전력생산을 위한 발전 비용함수를 적용한다면 익일의 공급가능용량이 최적 배분됨으로써, 변동비 반영 시장(Cost based Generation Pool)과 입찰가격 반영 발전시장(Price Bidding Generation Pool)에 적용될 계통운영보조서비스의 계약 물량 산출 및 익일 생산비용의 최적화를위한 입찰전략(Bidding Strategies) 수립이 가능해 지므로 보유 설비에 대한 최적이용이 가능하게 된다. 따라서 본 논문에서는 수요예측 오차와 과거 시장운영 실적을 기초로 년 간 유지보수 계획을 수립하고, 계통운영보조서비스에 대한 계약물량 산출과 개개 발전기의 비용함수 산출, 적용을 통한 발전설비의 효율적인 입찰 방안에 대해 논하고자 한다.