Quantity Takeoff for Non-Selection Work Items based on BIM

BIM 기반 비선정 작업항목 물량산출 방법에 관한 연구

  • 박상헌 (서울시립대학교 건축공학부) ;
  • 윤선재 (서울시립대학교 건축공학부) ;
  • 구교진 (서울시립대학교 건축공학부)
  • Published : 2019.11.01

Abstract

Estimates based on BIM makes it possible to perform from quantity take-off to construction cost estimates by using model, which is made in the phase of design and construction. As the BIM models are made up of the units of element, there an advantage of the automative quantity take-off, if the correction or change of element occurs. Work items, not included in the elements of the BIM model, are excepted from bill of quantity. Level of detail(LoD) of the BIM model can be improved for detailed estimates, but an excessive modeling for estimates is inefficient. This study presents the measure for selection and quantity take-off of work items, those are not expressed in the BIM model. The proposed method avoids the creation of excessive BIM Models and enables quantity take-off in conjunction with the element.

Keywords