An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

Selection Method of Eco-friendly Finishing Materials Considering Cost Efficiency for the Aged Housing Remodeling Projects (노후 공동주택 리모델링의 경제성을 고려한 친환경 실내 마감재료 선정 방안)

  • Kim, Ki-Hyun;Kim, Kyung-Rai;Hwang, Young-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.84-91
    • /
    • 2008
  • "Eco-friendly construction" is an emerging issue in the building industry. Main purpose of the eco-friendly construction is to sustain the health and environment of building residents and to minimize the harmful effect on their environment. Apartment residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Environmental performance is to meet through using the highest grade eco-friendly materials. However, generally eco-friendly materials are more expensive than normal materials, Therefore, using eco-friendly materials at public housing project is limited to economical aspect. The purpose of this paper is development of eco-friendly material selection model considered cost efficiency. The selection of Eco-friendly finishing materials and their methods are constructed to consider environmental performance level and cost index compositively. Development of eco-friendly material selection method is economic and reasonable one when public housing is constructed.

Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

A Priority and Impact Factor Analysis of Construction Management Tasks for Decreasing Change Orders and Defect Repairs in Cancer Treatment Center Projects (암센터 의료시설의 설계변경과 하자보수의 감소를 위한 중점 관리공사 분석)

  • Lee, Chijoo;Lee, Ghang;Sim, Jaekyang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.55-64
    • /
    • 2013
  • The complexity of constructing medical institutions is higher than that of general buildings, and many change orders in the design and defect repairs in the construction phase are required due to strict government regulations. The priority control of constructions and impact factors of medical institutions were analyzed in this study, and difficulties in the control in the design and construction phase were identified. First, the priority management factors that were identified were as follows: architecture, facilities, and electricity. Second, 1) priority management in constructions and factors resulting in change orders and 2) priority management in constructions involving defect repair were analyzed. Third, the importance recognized by the construction managers were analyzed. The priority management in constructions and factors that were recognized by the construction manager were deducted as having low importance, although there were many change orders and defects. The work of finishing, wall building, joining, office automation and communication function, and lighting were analyzed in the design phase, and waste, the office automation and communication function, ceilings, contamination control, and plumbing were analyzed in the construction phase. The results showed that there will be a decrease in change orders and defects if the concentration of the manager was elevated and priorities were managed.

A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building (초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구)

  • Hong, Bo-Bae;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials (초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안)

  • Chung Yun-Woo;Kim Eun-Sang;Suh Hyun-Ah;Kim Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.539-542
    • /
    • 2004
  • Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.

  • PDF

Feasibility Analysis of the Use of Architectural PC for Improving the Productivity in Apartment Housing Projects (공동주택 공사에서의 생산성 향상을 위한 건축 외관용 PC의 적용 타당성 분석)

  • Lee, Hyun-Seok;Sohn, Young-Jin;Lee, Yoon-Sun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.118-125
    • /
    • 2008
  • In Korea, five days per week system, duration reduction bidding system, and post sale system have recently stimulated an interest in productivity improvement in construction project. However, analysis result of productivity in Korean construction industry found that the productivity is too low. APC (Architectural PC) is alternative of reveal wall and parapet in apartment housing prcjects and is used abroad broadly because of duration reduction for productivity improving. APC is used as external curtain wall in Dubai, North America, and Southeast Asia. Therefore, it is proposed that necessary to Introduce APC in Korea. The objective of this study is to draw up introduction of APC in apartment housing projects. We analysed the feasibility of the use of APC. The survey results reported that APC would be able to improve the productivity in the eight productivity factors.

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.

A Study on the finish work applicability of Color Chip input Inorganic Floor-covering (칼라칩(Color Chip)을 혼입한 무기질 바닥재의 바닥 마감공법 적용성에 관한 연구)

  • Park, Ho-Geun;Hong, Seong-Wook;Doh, Sun-Boong;Kim, Sang-Won;Choe, Min-Kwon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.209-210
    • /
    • 2012
  • In this study, the following conclusions are drawn. First, the Inorganic terazzo tile flooring and LCC (Life Cycle Cost) analysis showed that the sum of the total cost of 150,304 won Inorganic flooring, terrazzo tile flooring minerals won 186,202 to 35,898 won, compared to 8.22% analysis of the cost savings that have been appearing. Second, if the color chip has a unique and elegant sentence patterns, beautiful and high-strength bonding and that the crack resistance was investigated.