Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- 2004.11a
- /
- Pages.539-542
- /
- 2004
A Study of the High-rise building's Lift-up Management - through Division of Loading Factors of Equipment materials
초고층 건축 공사의 효과적인 양중 제안 - 설비공사 양중부하 분배 개선 방안
- Published : 2004.11.01
Abstract
Nowadays, High-rise building becomes higher and bigger than ever. As a result, lots of construction materials are needed at the same times. Because of divided diverse process of construction, several different Processes concur simultaneously with complexity of procurement. So, effective construction material supply and lift-up are essential part of the spot. Especially, when ending part of construction, there are much conflict between finishing and equipment materials also problems of folding lift-up. The Purpose of this paper is suggesting better effective lift-up system through analysis of loading factors.
최근 건축물의 대형화, 고층화 경향에 따라, 현장에서 취급되는 자재의 종류는 갈수록 다양해지며, 자재의 양도 방대해 지고 있다. 세분화된 공정으로 인해 서로 다른 공정이 동시 다발적으로 진행되기 때문에 현장에서 작업동선 및 물류의 이동이 매우 복잡해진다. 이에 따라, 효율적인 자재 반입 및 양중이 필요하다. 특히 마감 공사 시에 마감자재와 설비자재와의 반입 충돌과 공정상의 불일치로 인해 건물에 양중 문제가 발생하고 있다. 본 논문은 이를 분석하고 문제점에 영향을 미치는 요소들을 파악하여 효과적인 자재 양중방향을 제시한다.
Keywords