A Study on the Effectiveness Verification of Construction CRM systems (건설 CRM 시스템 효과검증에 관한 연구)

  • Cho, Kyoung-Rin;Hwang, Ug-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.137-145
    • /
    • 2007
  • Purpose of this study is to analyze degrees of oral transmission, customer satisfaction, and subscription customer's re-visitation to grasp effectiveness of CRM of construction company. Brand recognition, customer satisfaction, and customer loyalty can be made to improve by CRM of construction company. Ultimately, this study is intended to improve management achievement by increasing total sales and reducing expense. 175 distribution customers and subscription customers participate in the final analysis for this study. In terms of service quality factors, state of facility, trust, response, conviction and sympathy are measured. In terms of effectiveness, customer satisfaction, oral transmission, and customer's re-visitation are measured. Considering these things, CRM of construction company can improve oral transmission, satisfaction, re-visitation of distribution customers and subscription customers. CRM of construction company can be utilized as a competitive means for management and contribute to improving management achievement in the long run. Through examining actual effectiveness of CRM of construction company in this study, it can be thought that necessity and possibility of CRM of construction company should be recognized and CRM of construction company should be developed further.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

A Case Study of BIM-based Framework on Constructability Tasks (BIM기반 골조공사의 시공성분석 업무 적용사례에 관한 연구)

  • Lee, Seung-Il;Kwon, Nam-Ha;Cho, Young-Sang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.45-54
    • /
    • 2010
  • Recently more and more construction projects have become high-rise, complex and intelligent. Accordingly, such projects require an integrated management system for tasks, with a lean approach to construction with work processes for management and productivity. In particular, Construction Information Technology (CIT) fields are concerned with Building Information Modeling (BIM), which represents the process of generating and managing building data during its life cycle. Constructability research has progressed for the project goal which is a cost-time-quality of optimization by integrated construction knowledge and experience. However, the current constructability process has not been performed efficiently, as the existing 2D drawings and papers lack consistent and accurate information, it is difficult to share the contents of work, and the use of information is inefficient. This study proposes that the reformation and enhancement of BIM-based constructability work process can lead to brilliant performance in the framework of the construction phase through achieving collaboration between the design team and the workers at the site.

A Study on the Human Resource Management of the Specialty Contractors Performing Multi Projects -Focused on Rebar and Concrete Work- (멀티프로젝트를 수행하는 전문건설업체의 최적인력관리방안 기초연구 - 철근.콘크리트공사 중심으로 -)

  • Seo, Jong-Min;Na, Young-Ju;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.67-73
    • /
    • 2008
  • Recent trends in construction towards larger scale and taller buildings are causing problems by ineffective existing management approach in construction industry have emerged. Delivering necessary materials and mobilizing the human resources and equipment In a timely manner to keep labor on schedule have become a critical issue to be addressed. In particular, many specialty contractors carrying out multiple projects have been experiencing difficulties mobilizing the manpower on time and in right places due to poor communication at each stage of labor supply, resulting in waste of valuable resources. Hence, it's imperative for the specialty contractors to obtain specific information on labor demand so as to set up a communication and labor management system to ensure the right human resources will be mobilized in the right place at the right time. The study therefore is aimed at developing an optimal human resources management system for specialty contractors performing multiple projects. To that end, the study is focused on rebar and concrete work. The outcome of the study is expected to help allocate the right human resources to the right place in a timely fashion, thereby achieving an effective workflow at construction sites.

An Application of Simulation Method to Planning of Road Pavement Operation (시뮬레이션을 이용한 도로포장 공정계획의 수립방안)

  • Ohn, Seong-Won;Kim, Ok-Ki;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.124-131
    • /
    • 2007
  • Project management means usually managing the rate of construction progress. But it also contains preparing scheme of execution and establishing plan for equipment, material, labor force to finish project within expected duration. In this paper to establish effective project planning a road pavement operation is selected as a case and simulation method is used for analyzing it. Next probability distributions are created after analyzing collected data and these are reflected in simulation model. Simulated result is compared with real project planning using models of lean concrete pavement process and concrete slab pavement process to verify efficiency of this model. In the event we know that project planning using simulation is more effective than one of the field in the aspects of duration and cost. Meanwhile simulated result in this paper has a limitation in accuracy because various constraints of filed are not reflected in it. However if we reflect this constraints in model through examining field in future this limitation is expected to be improved.

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Development of an Automated Pavement Crack Sealing Machine and Its Economic Feasibility Analysis (크랙실링 자동화 장비의 개발 린 경제적 타당성 분석)

  • Lee, Jeong-Ho;Lee, Jun-Bok;Jeong, Hyung-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.151-164
    • /
    • 2006
  • Numerous efforts are currently underway to automate pavementcrack and joint sealing activities. Productivity improvements, improved safety and quality, and reduced road user costs motivate these developments. Recently, an automated pavement crack sealing machine has been developed to automate the process of sealing pavement cracks and joints in Korea. This paper mainly describes the results of the economic feasibility analysis revealed through its overall performance evaluation and field tests. Finally, it is concluded that the automated machine exceeds the performance in terms of productivity, safety, and quality required in conventional method, thus making the machine economically feasible.

Study on a Prediction Model of the Tensile Strain Related to the Fatigue Cracking Performance of Asphalt Concrete Pavements Through Design of Experiments and Harmony Search Algorithm (실험계획법 및 하모니 검색 알고리즘을 이용한 아스팔트 포장체의 피로균열 공용성 관련 인장변형률 추정모델 연구)

  • Lee, Chang-Joon;Kim, Do-Wan;Mun, Sung-Ho;Yoo, Pyeong-Jun
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.11-17
    • /
    • 2012
  • This research describes how to predict a model of the tensile strain related to the fatigue cracking performance of several asphalt concrete structures through design of experiments(e.g., Response Surface Methodology) and harmony search(HS) algorithm. The axisymmetric analysis program of finite element method, which is the KICTPAVE, was used to determine the strain level at the interface layer between asphalt layer and lean concrete layer. Once the training database set of various strain levels was constructed under the several condition of layer stiffnesses and thicknesses in the asphalt concrete structures, the data set was trained through the HS algorithm in order to determine the regression coefficients defined based on a response surface methodology. Furthermore, the testing set, which was not used for the training procedure of HS algorithm, was also constructed in order to evaluate whether the regression coefficients of a prediction model can be appropriately applied for other cases in asphalt concrete structures.

Research on Practical Rubblization in PCC Pavements Equipment Development and Test Construction (원위치파쇄기층화 공법의 실용화를 위한 장비개발 및 시험시공)

  • Lee, Seung Woo;Han, Seung Hwan;Ko, Suck Bum;Kim, Ji Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.81-87
    • /
    • 2006
  • The rubblization technique is breaking the aged concrete pavement slab into rubblized concrete aggregate, and use it as an base material at its original position, then builds overlay above the rubblized base. This method has been successively used in USA due to the advantage of good constructibility, cost-effectiveness as well as the capability of preventing of reflection cracks. However, constructibility and economic performance of rubblization on typical Korean concrete pavements needed to be investigate since to typical Korean concrete pavements have thick slab, as well include lean concrete subbase course. Multi-head type breaker suitable for Korean condition was designed and developed. This multi-head type breaker was designed to rubblize old concrete to the suggested optimum rubblized-depth and rubblized-concrete-aggregate size to prevent reflection crack and maintain high bearing capacity. This machine was used for the test of rubblization of old concrete pavement on a non-use old concrete and a in-serviced road. In these two tests, engineering properties of rubblized base and constructability and cost were investigated. In both tests, the old concrete rubblized to targeted size and depth, and high-level bearing capacity was achieved. Also, superior constructability and lower cost compared with traditional reconstruction was examined.