Abstract
The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.
초고층$\cdot$대형 현장은 일반 현장관리 방법과는 달리 경험에 의한 의사결정에는 한계가 있다. 특히 도심지 고층 공사의 경우 대지의 여유 공간이 협소하여, 자재적치와 수평 동선을 위한 공간의 확보가 용이하지 않다. 이러한 초대형 프로젝트를 수행하기 위해서는 기존 경험에 의존하는 양중 및 조달 관리의 한계성을 인식하고 새로운 양중 및 조달 관리 방법의 모색이 필요하게 되었다. 따라서 JIT의 개념을 도입하는 것이 필수적이라 하겠다 현장 내 즉, 반입 이후의 단계는 물리적인 자재의 흐름보다는 정보의 흐름과 의사소통이 중요시되는 단계로 본 연구에서는 현장 내 물류흐름의 문제점을 분석하여, 자재별 속성을 고려한 양중계획수립, 작업일정과 양중일정의 통합관리, 자재의 위치현황 및 작업의 설치현황 가시화를 통한 정보의 공유, 계획대비 실적의 평가의 부분을 시스템개발 방향으로 설정하여. 커뮤니케이션 도구로서의 역할과 계획 대비 실적 평가를 통한 계획의 신뢰도 확보 등을 주요 기능으로 하는 양중관리시스템을 개발하였다.